Woodlane Timber, Hucknall

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

Building Codes, Zoning Ordinances
The best green building solutions for You OPIC Conference, May 2010 SUNDAYsystem TM
MAJOR PROJECT: warehouse/office
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
SRT251- Construction and Structures 2 Timber Portal Frame Glenn Murcutt Daniel McLean
Civil Engineering & Architecture 2.3 Residential Design.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Technical boclair academy Building Drawings.
Site Plans.
Prefabricated Timber Frame Construction
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
Building Green Lesson 1 – Green Architecture © 2012 Project Lead The Way, Inc.Green Architecture.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
Orthographic Drawings
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Foundations of Technology Construction
Prefabricated Timber Frame Construction
Temporary Works – P8 Project Practice.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Highveld Industrial Park Workshop No. 21 Information Memorandum
Curriculum for Excellence
Ness Bridge Construction
Carl James Type of building use
TO LET (MAY SELL) Former HSS Hire Unit Wakefield Road Bradford BD4 7LX
Pre-Contract Cost Control
QMC Nottingham - Refurbishment works to Wards A23 & B50
Minuteman Vocational Technical Regional High School Progress
14 High Leys Drive, Ravenshead, NG15 9HQ
visit our website: or find us in facebook
20 Chestnut Drive, Mansfield
The Beehive House, Castledine Street, Loughborough
Building Construction I Sofia Sebastian 1
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
The Hollies, Ravenshead
1 Semester Project Design A Multi Story Office Building
Building Drawings.
Value of contract: Length of contract: Contract start date:
Widmerpool House, Kinoulton Road, Widmerpool
The Acorn Medical Practice, Wood Street, Mansfield
Value of contract: Length of contract: Contract start date:
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Foundations of Technology Construction
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
PKL INVESTMENTS LTD Value of contract: Length of contract:
Poswillow Suite, Children's Dental Unit
Ashfield District Council Disabled Facilities Adaptations
Field House, Car Colston
Coppice Ridge, Fiskerton, Newark
Eaton MEDC, Sutton-In-Ashfield
Value of contract: Length of contract: Contract start date:
Community Practice Asset Management.
Unit 47, Rosemount Park Drive, Rosemount Business Park, Ballycoolin, Dublin 15 To Let 25,006 sq. ft 2,323 sq. m High spec logistics facility with 11 meters.
Value of contract: Length of contract: Contract start date:
Presentation transcript:

Woodlane Timber, Hucknall Value of contract: Length of contract: Contract start date: Completion date: £535,000 7 months October 2016 April 2017 Works/services provided: Energy efficient electrical installation Mass fill concrete foundations Heavy duty foul and surface water drainage system Erection of Portal steel frame Ground bearing concrete floor slab Internal fit out and finishes Composite cladding to roof & elevations Reinforced concrete goods yard and landscaping Steel mezzanine with timber deck Aluminium door & windows systems Detailed description of contract: Construction of new commercial premises to include warehousing, workshop, trade counter and showroom, two storey offices, staff welfare facilities, concrete goods yard & high security fencing. Particular challenges to be overcome: Contact details: Design development and installation of groundwater drainage, to meet STWA approval, and improve local ground conditions Adhering to a strict contract delivery programme to achieve completion ahead of the clients fixed business relocation date Woodlane Timber Merchants 14 Baker Brook Close off Wigwam Lane Hucknall Nottingham. NG15 7SZ Tel: 0115 964 0888