Thursday 10th January 9:30 Network routers restart, all went fine, but only just. 12:00 All power converters from the arcs on at standby 12:00 ELQA test.

Slides:



Advertisements
Similar presentations
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Advertisements

R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
:30 meetingEBH 1  7:53 start VdM scans LHCb  8:18 beam dump: RF M2B1 crowbar (3 rd time within 24 hours)  Access for RF  Changed thyratron.
LHC 1 st August :34 Dump on TDI.B2 jaw position while filling –Checks and change TDI.B2 reference position by 0.1 mm outwards 09:40 Lost cryo in.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Wednesday 5 th December until this morning 06:59 Stable beams fill #3375, L ~ 6.8e33 cm-2s-1. 10:40 Beam dump, trip of RD2.R5. Integrated L 72 pb-1 in.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Wednesday September 14th
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Summary of week 7 Hardware Commissioning:
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday 11/07: Recovery Plenty of accesses.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Power cut 18kV cable for EMD404/E9 is heating
Summary of Week 11: 14 – 21 March
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Thursday morning 09:30 Dump of pPb fill.
Scrubbing progress - 09/12/2012
Thursday 10th May - morning
LHC Morning Meeting - G. Arduini
Friday 14th December - morning
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
LHC Morning Meeting - G. Arduini
Not the most productive 24 hours on record
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Summary Thursday h21: Stable beams fill #1303.
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
IP8 aperture measurements (07:30-10:30)
Thursday 26th July 13:21 Fill 2880 beam dumped
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Cold compressor speed S45
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday :15 fill 3523 dumped by BPMs IP6
Problems encountered at P4: 1st episode
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Wednesday 23/2 Thanks CRYO!!!.
LHC Status Fro Morning 9-Sep
Thursday
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Monday 10th December - morning
Monday 27th August & night
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday 14:30 Fill 2011 dumped.
Wednesday morning / afternoon
Thursday 2.12 Cryo recovery…. Access… RF cavity check (noise) Cav4B1.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Presentation transcript:

Thursday 10th January 9:30 Network routers restart, all went fine, but only just. 12:00 All power converters from the arcs on at standby 12:00 ELQA test finished Still some selected accesses 17:40 Cryo Maintain OK for all sectors 18:37 Cryo OK complete machine Test of circuits and QPS 22:55 All vacuum valves open 00:48 All HWC tests finished 02:41 BIS loops closed 06:50 RF conditioning M1.B1 finished 11/01/2013 LHC 8:30 meeting

Network routers restart – IT department The restart of the routers did affect the LHC Many cryo valves closed IP8. Stop of compressors just avoided because of the cryo crew was ready to react. ODH in IP2 (as displayed in CCC) Linac2 Vistar BCT (trafo) readings Good that it was a coordinated reboot following yesterday’s request by IT 11/01/2013 LHC 8:30 meeting

Decided on polarities 11/01/2013 LHC 8:30 meeting

Outstanding RF Power converters to be changed “Module 1B1 has 2 cavities that need further conditioning overnight. We would make them operational early morning to-morrow.” Finished this morning at 6:50 RF interlock cav4.B2: piquet called RF low-level set-up going on right know: 1 hour Power converters to be changed 60 A corrector pc RCBV12.L7B2 60 A corrector RCBV28.R1B1 CMS shielding at top of pit? 11/01/2013 LHC 8:30 meeting

The plan John’s master plan, as presented yesterday, can be found via “latest news” page. Today: RF low-level set-up (1 h) Change 2 pc (2 h) Take first beams Test ramp with dump at flat top Set-up of squeeze, optics measurements TDI, BPMS 11/01/2013 LHC 8:30 meeting