Anitha Neve Operations and Interchange Specialist WIT Update May 24-25, 2016 ISAS Schedulers Meeting, Salt Lake City, Utah Anitha Neve Operations and Interchange Specialist
Western Interchange Tool (WIT) January 1, 2014 Transfer of WIT contract to Peak Reliability (Peak) February 1, 2016 Transfer of WIT Administrative functions from WECC Staff to Peak Transfer of NERC CERTS Administrative functions to Peak
Changes in WIT Contacts New Administrator at Peak Tamela (Tami) Keith tkeith@peakrc.com Change in WIT Contact at OATI Daniel Rovegno Daniel.Rovegno@oati.net Contact Information Updated on WIT Production Homepage
Schedule Change Forms 14 requests since Feb 1, 2016
NERC CERTS Inadvertent Tool Administrative functions for Western Interconnection now handled by Peak Accumulated Inadvertent for Western Interconnection not zero since January 2014 Problem due to consolidation of two BAs Data is correct in WIT CERTS working with NERC Inadvertent Group to fix the issue
2016 Bias Values 2016 bias effective date in West April 5, 2016 at 10PDT/11MDT WECC and BAs bias values were entered in WIT by Peak Did not have the values for Lmax – payback value Left as zero Each BA must enter Lmax values on their own WECC Bias Change expected June end
WIT User Group Peak in process to start a WIT User Group Announcement and draft scope statement issued on April 18, 2016 Each BA was requested a assign a representative Response were due April 25, 2016 No response from six BAs
WIT Related WECC Drafting Teams Remove reference to Reliability Assurer from WECC documents Posted for 45 day comment on 5/17/2016 Closes on 7/1/2016
WIT Related WECC Drafting Teams Remove reference to Interchange Authority WECC Interchange Authority Back-up (WIAB): INT-020-WECC-CRT-1.2 Posted for 45 day comment on 4/7/2016 Closed on 5/23/2016
Anitha Neve aneve@peakrc.com