Olympic and Paralympic parks and venues!

Slides:



Advertisements
Similar presentations
Presentation to: The Confederation of British Metalforming Prepare for 2012 – West Bromwich Workshop Winning Sports Contracts Phil Sheepy BSc (Hons) MRICS.
Advertisements

Tuesday 8 th February all of the sports ambassadors went on a school trip to the Olympic park and was very interesting! A lady came in to teach us all.
Description of Marseille Marseille is a big city, it is the second largest city of France. There are inhabitants in this city that measures 240km².
The Olympics in 2012 London. The 2012 Summer Olympic Games, officially known as the Games of the XXX Olympiad, will be held in London from 27 July to.
Unit 8 Sports The Olympic Games The Olympic Games Olympic motto The 29the Olympics The 27th Olympics The 1st Olympics The modern Olympics The old Olympics.
 The FIFA World Cup was first held in 1930,  When FIFA president Jules Rimet decided to stage an international football tournament.The first edition,
London Οζμπάϊ Μπουράν. Geography London is the largest urban area and capital city of the United Kingdom. Greater London covered an area of 1,579 square.
By Matthew, Lucy & Sarah This is the Olympic Park…… The Olympic Park is using up 2.5 square kilometres of land in east London.
OLYMPICS  HOST CITY: London, UK.  MOTTO: Inspire a generation.  NATIONS PARTICIPATING: 204.  ATHLETES PARTICIPATING:  OFFICIALLY OPENED.
Great British Sporting Events By The Children in Year 3 St Richard’s School, Chichester, England.
2012 London Summer Olympic Games Getri Mitt 2009 Pärnu Coeducational Gymnasium Form G2B.
1 World Games Special Olympics World Summer Games Facts: Largest World Games in the history of Special Olympics 7,000 athletes 100,000 volunteers.
Project work School - #12 Name – A. Magomedova T. Kalintseva Teacher – A. Alenko.
The Olympics in 2012 Helen Post Pärnu Coeducational Gymnasium Form: g3b 2009.
By Connor Sorrell & Matthew Bentley. Introduction As you know, England will be hosting the Olympics in This will be the third time that we’ve hosted.
LONDON Author: Marie Ojasalu, Pärnu Koidula Gymnasium, 10a "The most important thing in the Olympic Games is not to win but to take part, just as.
Olympic Preparations. Beijing 2008 Olympic Village.
Water Polo Sport of Global Interest. Water Polo History The earliest known documentation of modern water polo can be traced back to the late19th century.
SPORTS AMBASSADORS OLYMPIC TOUR The Olympic Village.
A presentation by Rasmus Peeker 2009 The XXX Summer Olympics,
SALT LAKE 2002 Alpine Skiing Biathlon Bobsleigh Cross-Country Skiing Curling Figure Skating Freestyle Skiing Ice Hockey Luge Nordic Combined.
 The city of London will host the Olympic Games in 2012  Opening date is 27 July 2012  Closing date is 12 August 2012  London was cho sen from 5 candidate.
Sport And Urban Regeneration. The Commonwealth Games; 2002 In 1995, Manchester was awarded the 2002 Commonwealth Games. It also made an unsuccessful bid.
{ London olympic Pictures:  Why are the Olympics held every four years? The Greeks noticed that eight solar years was close to 99 lunar months.
Prepared by Lozobko A. Form 10 School No 1 Teacher Kurilova Yuliya Pyatigorsk.
By Jordan Robertson and Mark Welch London 2012 Olympics: venue guide Read Telegraph Sport's guide to all the event venues for the London 2012 Olympics.
The Olympic Tour By Olivia, Sloan and Emilie 9M. What We Learnt We learnt that The London 2012 Olympic Games will feature 26 sports, breaking down into.
By Jessica Maton and Ailsa Maclennan!!! Olympic Parks!! Pg3 Picture Gallery!! Pg4 Our favourite Olympic Venues!! Pg5 Video!! Pg6 More Pictures!! Pg7.
LONDON OLYMPIC GAMES 2012 MEELIS MÄEARU G1C OPENING CEREMONY Opening ceremony was held on the 27th of July 2012 in the Olympic Stadium. The size of audience.
By Marsailli and Katy. Olympic and Paralympic Swimming. Some of the things you can do in the aquatic centre are Diving, Modern Pentathlon Swimming and.
Autumn in Queen Elizabeth Olympic Park Go! Schools Autumn 2015 Assembly.
Unit8 Sports 制作人:谢群草 03级外语系本科四班. Teaching Aims 1.Improve the student’s reading ability by fast-reading and reading. 2.Enable the students to master the.
LondonLondonLondonLondon 2012 About the Games Venues How to get there.
London Attractions Valeria Babanina Murmansk Pedagogical Colledge Group 2G.
The Olympic Games.
Detroit, Michigan. History Opened in 2002 Located in Downtown Detroit Across the street from Comerica Park (MLB) Replaced the Pontiac Silverdome Total.
Get Set for the Road to Rio. Rio 2016 is approaching.
There are many different venues in the Olympic games. Diving and swimming events are taken place at aquatics centre in the olympic park.Also taken place.
Getting to Know the 2012 Venues LO: To investigate the sustainability of the London 2012 Venues Using this and the web links on the pages
WEMBLEY AND OXFORD STREET Hilda and Laila. THE OLD WEMBLEY One of the most known stadiums. Was called ”Empire Stadium”. Hosted Olympic Games Built.
DESIGN INSPIRATION AT QUEEN ELIZABETH OLYMPIC PARK TEACHING RESOURCE:
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Olympic Heritage London hosted the 1908 and 1948 Olympic Games.
2010 FIFA WORLD CUP SOCCER STADIUM STRUCTURES “ A WORLD CLASS STADIUM TO BE PROUD OF” CAPE TOWN STADIUM.
WEMBLEY By Jack Ploszynski. The History Of WEMBLEY The famous twin towers have made way for an iconic arch over the stadium, which has been totally rebuilt.
Summer in Queen Elizabeth Olympic Park Go! Schools Summer 2016 Assembly.
What are we going to learn today? To find out what the term ‘Redevelopment means’ To investigate the features of an Olympic park. Key Words: Infrastructure.
Merilin Paas Pärnu Coeducational Gymnasium G3B
The Millenium Stadium The Millenium Stadium (now known as the Principality Stadium) was built in June 1999 in Cardiff. It is Wales’ national stadium .
Street Umbrellas Australia
SAFCOL Industrialization conference
Get Set for the Road to Rio
Parks and venues for the Olympics
Sports Facilities in Larnaca
SPORT IS FAN SPORTS.
The Olympics in 2012 Liisi Lasn, 11A MHG.
Olympic Park.
Before The hardwood in the ceiling gave a warm feeling to the pool.
Olympic Delivery Authority* Earned Value in the London 2012 Programme
By Innes, Adam, Kurt and Jack
Parks and Venues!! By Ellie and Tanya!.
Olympic and Paralympic Venues
Sport And Urban Regeneration
The Olympics.
Mathematics in sports stadia
The Olympics in 2012 Maria Huopolainen.
Anastasia Gumen Karina Halyka Viktoria Chehivska Sofia Shpak 10-B
The presentation was prepared Ilchyshyn Adrian
The Olympic Games.
10 Alternative facts about Wembley Wembley Park Hotel
Presentation transcript:

Olympic and Paralympic parks and venues! By Lottie Leanne and Josh

Aquatic stadium Designed by architect Zaha Hadid, the breath-taking Aquatics Centre is one of the permanent venues specially constructed for London 2012. With a capacity of 17,500, the Aquatics Centre’s spectacular wave-like roof is 160m long and up to 80m wide – giving it a longer single span than Heathrow Terminal 5. Construction on the venue began in July 2008 and was completed in July 2011. Work began on the inside of the venue once the roof was in position. The three pools were dug out, lined, filled with water and tested, before they were fitted with more than 180,000 tiles.

Basketball Arena The venue’s frame is made up of 1,000 tonnes of steel and is covered in 20,000 square metres of a recyclable white PVC fabric that will form the canvas for spectacular lighting displays during the Games. Initial works started on the Basketball Arena in October 2009, and construction was completed on time and within budget in June 2011 – making it one of the quickest Olympic Park venues to be constructed. The arena’s giant frame was set up in less than three months during spring 2010. Initial works started on the initial works started on the Basketball Arena in October 2009, and construction was completed on time and within budget in June 2011 – making it one of the quickest Olympic Park venues to be constructed. basketball Arena in October 2009, and construction was completed on time and within budget in June 2011 – making it one of the quickest Olympic Park venues to be constructed.

Aquatic stadium information The venue features a 50m competition pool, a 25m competition diving pool, a 50m warm-up pool and a ‘dry’ warm-up area for divers. The Water Polo competition is being hosted next door in the temporary Water Polo Arena. The venue’s roof proved to be one of the most complex engineering challenges of the Olympic Park big build.

BMX Track! Around 14,000 cubic metres of soil were used to build the BMX Track. This soil was excavated elsewhere on the Olympic Park site, cleaned then reused to create a series of levels up to four metres high, on which the final track was formed. An internationally-renowned BMX track designer helped to create a fast and challenging course, which features an eight-metre high ramp at the start, followed by jumps, bumps and tightly banked corners.

Wembley arena! With a span of 315 metres, Wembley arch is the longest single span roof structure in the world and is visible from across London. Wembley Stadium opened in 2007 on the site of the old 1923 stadium. A truly iconic British building, the new stadium comes complete with a sliding roof to protect against bad weather.

St James park St James' Park was built in the 19th century. Since then, it has undergone various major redevelopment and modernization projects. Little preparation is required to ready St James’ Park for the six matches it will host in the London 2012 Olympic Football tournament.

Thanks for watching parks and values for the Olympics, we hope you learnt something! By Lottie Leanne and Josh!