OT Survey & Adjustment Outline: Survey technique

Slides:



Advertisements
Similar presentations
Richard Soluk – University of Alberta. The LHCb VELO Region R. Soluk --- University of Alberta --- MoEDAL Collaboration Meeting --- CERN June
Advertisements

M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
Status Update on Mechanical Prototype in Rome November 6,
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
1 Installation of Delphi Frame  ITS Installation.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
CERN Draft 0.3 – after meeting July 29th, 2011IMWG - Workflow sub working group - draft after meeting.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Inventory of radioactive sources present in the cavern at pit 8 Gloria Corti Experimental Area Meeting 05 August 2008.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
100 th ACCU meeting – 25 Years of ACCU Michael Hauschild - CERN - 4 June 2013, page 1 25 Years of ACCU Some historical view back in time.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Commissioning Schedule and Shifts – First Call E906 Collaboration Meeting 23 February 2010.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
Jean-Christophe Gayde CERN-EST/SUEDMS Id: Juin 2003 ATLAS TILE CALORIMETER PRE-ASSEMBLY SURVEY DATA ANALYSIS CO-ORDINATE SYSTEM DEFINITION 11.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Status VELO alignment 1.NIKHEF 3D measurements 2.Photogrammetry 3.Calliper checks in x-direction 4.Photogrammetry again Jo van den Brand May 23, 2006.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ELENA installation progress F. Butin / ELENA collaboration.
Kitakami Side AHCAL Assembly or anywhere in any detector.
BM&N STS ladders assembly in VLHEP
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
Update on Pavia MM mechanical prototype
The LHCb Installation Story
VELO-installation meeting CERN, January 17, 2006
Present status of the flux return yoke design
BSS Prep work at CERN and Acceptance of Parts
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Step IV PRY Preparation - Contents
Large Area Endplate Prototype for the LC TPC
SCHEDULE Nov 1st - Assembly Table Complete
G. Carboni for the Muon Group
LLRF Controls Outline Requirements External Interfaces Schedule Design
Installation plans from mid 2005
X-ray Pump-Probe Instrument

13-block rotation schedule
Alignment of the first two magnet system modules of Wendelstein 7-X
Status of CO2 Cooling tests at CERN for Pixel phase 1
Station and Module Support Frames
OT Survey & Adjustment Outline: Survey technique at present
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
Outer Tracker Nominal Position
Step 3 Step 2 Step 1 Put your text here Put your text here

RPC Readiness for installation
Paper Presentation - Ultra Portable Devices
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Integration Techniques: Tables
Web-Based Information Management Program
Recent Results on TRT Alignment
Polarized 3He target installation
MQXF-11T Integrated Schedule
Presentation transcript:

OT Survey & Adjustment 11-06-2007 Outline: Survey technique C-Frame survey and adjustment Survey data Photogrammetry Long-term??

OT Overview Modules Bridge C-frame OT Cryo-Platform Table & Cable Trays December 31, 2018 Antonio Pellegrino

“A” Side “C” Side OT C-Frames Z X IP T3-Q02-VX T3-Q02-XU T2-Q02-VX December 31, 2018 Antonio Pellegrino

36  (Px,Py,Pz) survey points: mostly only 18 measured (1 Layer) 2 3 4 5 6 7 8 9 dowel pins 1 2 3 4 5 6 7 8 9 2 Layers  9 Modules/Layer  2 dowel pins/Module (top/bottom) 36  (Px,Py,Pz) survey points: mostly only 18 measured (1 Layer) December 31, 2018 Antonio Pellegrino

Stick survey target in here! Targets Stick survey target in here! dowel pins December 31, 2018 Antonio Pellegrino

Adjustments What knobs can you turn if the survey turns out to be crap? Displace hook block wrt to frame modifies XLHCb Displace roller block wrt to frame modifies ZLHCb Adjust spacer under trolley modifies YLHCb December 31, 2018 Antonio Pellegrino

Example Survey: Z of T2-XU ZSU YSU XSU Dowel pin deviations from nominal positions in XSU (ZLHCb) toward Magnet toward RICH2 December 31, 2018 Antonio Pellegrino

Example Survey: X of T2-XU ZSU YSU XSU Dowel pin deviations from nominal positions in ZSU (YLHCb) higher lower December 31, 2018 Antonio Pellegrino

Example Survey: X of T2-XU ZSU YSU XSU modified (known translation in XLHCb) after Survey! Dowel pin deviations from nominal positions in YSU (XLHCb) toward A toward C December 31, 2018 Antonio Pellegrino

Adjustment Ready & Survey Up to date Overview of Survey Adjustment Ready & Survey Up to date Adjustment Ready, but modified (known translation in XLHCb) after Survey T3-Q13-VX T3-Q02-VX T3-Q13-XU T3-Q02-XU “A” Side T2-Q13-VX T2-Q02-VX “C” Side T2-Q13-XU T2-Q02-XU T1-Q13-VX T1-Q02-VX T1-Q13-XU T1-Q02-XU X IP December 31, 2018 Antonio Pellegrino

Survey Data Web Page In cooperation with the CERN Survey group (J.-C. Gayde, S. Berni, et al.) Overview on OT Survey Web Page Description Data Analysis Date Comment Table Survey at CERN EDMS 733968   11-May-2006 Bridge Survey at CERN EDMS 756237 OT-Alignment-1.9.doc 13-Jul-2006 Bridge+Table-Analysis-18072006.xls T3-Q02-VX Survey EDMS 870088 T3-VX.xls 3-Sep-2007   T3-Q13-VX Survey EDMS Report with “raw” survey data Analysis: determination of dowel pins deviations from nominal positions December 31, 2018 Antonio Pellegrino

Photogrammetry Concept: Measure several points on detector surface to check flatness between top/bottom dowel pins Targets about 80% of OT surface equipped with targets equip the rest?? (main problem manpower and access) Surveyed T1-Q13-XU in open position Survey T1-Q13-XU in closed position and compare?? December 31, 2018 Antonio Pellegrino

Summary All C-Frames surveyed and adjusted at least one layer per C-Frame, 18 dowel pins ~200 points, some of which measured 9 times!? CAVEAT: must be compatible with C-Frame closure once all electronics installed (June + July 2008) Survey Data published in EDMS reports a couple of mistakes to be corrected  new reports Discussion with Jan & Wouter about alignment constants for CondDB (X0,Y0,Z0,,,) per module make planar fit to each layer and derive (X0,Y0,Z0,,,) ? 1-2 weeks work Photogrammetry: decide how to proceed if present schedule, probably give up December 31, 2018 Antonio Pellegrino