Newsletter- April 2018 Jaunpur historically known as Sheeraz-e-Hind having its historical dates from 1359, when the city was founded by the Sultan of Delhi feroz shah Tughlag and named in memory of his cousin, Muhammad bin Tughlag whose given name was Jauna Khan. Jaunpur is well-connected with all major cities of India thanks to Indian Railways . It has four major railway stations: Jaunpur City Railway Station (JOP) and Jaunpur Junction (JNU), The Nagar Palika Parishad has population of 181,009 of which 94,318 are males while 86,682 are females and 9 other as per the Census India 2011. Population of Children with age of 0-6 is 20,918 which accounts 11.55 % of total population of NPP. The Female Sex Ratio is 901 against state average of 912. Moreover, Child Sex Ratio in town is around 893 compared to Uttar Pradesh state average of 902. Literacy rate of town is 74.084% higher than state average of 67.68 %. Total workforce participation is 26%. Jaunpur
SBM Status Status of application for the IHHT Received – 6332 Verified – 1818 Approved – 1813 Rejected -3006 Commenced toilet Photo – 899 Constructed toilet photo – 983
Waste Management - Area of NPP- 43 Waste Management - Area of NPP- 43.41 SQKM ( UNDER CONSTRUCTION ) - Generated waste- 82 tons/day - Frequency of waste collection- Daily - Frequency of waste transportation- Daily - Door to door collection- 19 - Source segregation- 04 Wards - Vehicles for waste collection - Tractor- 4 - Dumper Placer – 5 - Compactor – 1 - JCB Loader – 2 - Dumping sites –1 - Scientific management - No Waste transportation Drain cleaning Drain cleaning on daily basis Removing dead Body from Waste Dumping point
Anti Polythene campaign under SBM
Workshop for capacity building of sweepers under SBM
Ongoing Project AMRUT Scheme Water Supply 1) Jaunpur NPP Water Supply house connection under AMRUT (for 31 wards) – Project Approved of total project cost INR 817.70/727.64 Lacs. AMRUT Scheme ~3250 Houses are connected with old water supply connection Sewerage and Septage Management DPR for Sewerage is prepared by Jal nigam jaunpur. Land identification for construction of STP is under process Parks & Garden Parks – 03 PARK DPR Approved BY SLTC RCUES LUCKNOW and 02 PARK TENDER( TECHNICAL BID) OPENED SO park development is under process parks and gardens exist in the city
Yet to be done AMRUT Reforms E- procurement Double Entry Accounting “IND-BB” Credit Rating Ongoing EMAAS e-newsletter Registration of Birth & Death Water & Sewerage Charges Grievance Redressal Property Tax Issuance of Licenses E- procurement NRW - 22.87% Non-revenue Water AMRUT Reforms www.nppjaunpuronline.org Municipal Tax and Fees Improvement Yet to be done Building Permissions, Mutations, Payroll, Pension User Charges Only 100% Billing is being done Only 80.16% Collection is being done
Details of Tax collected during April 2018
Meetings and Workshops Capsule-3 Training” Under AMRUT Scheme for Shri Amresh saran yadav & Shri hatim hashan in RCUES from 09-04-2018 to 11-04-2018. on topic the orientation training programme Capsule-3 Training” Under AMRUT Scheme for Shri Tarkeshwar singh in RCUES from 03-04-2018 to 05-04-2018. on topic office management computer & soft skills “Capsule-3 Training” Under AMRUT Scheme for Shri Amresh saran yadav in RCUES from 23-04-2018 to 25-04-2018. on the topic orientation training programme