Cal DQM Report July 7 – July 14, 2004.

Slides:



Advertisements
Similar presentations
Presented by: Accounting Virtual Solutions, LLC A private and secure online service that makes our services more convenient for you.
Advertisements

Presented by: Adamson + Co., P.A. A private and secure online service that makes our services more convenient for you.
RPC & LVL1 Mu Barrel Online Monitoring during LS1 M. Della Pietra.
Presented by: Partyka & Company, P.C. A private and secure online service that makes our services more convenient for you.
Presented by: Miner, Gilroy and Meade, CPA, PC A private and secure online service that makes our services more convenient for you.
……+(4n-3) = n(2n-1) P 1 = 1(2(1)-1)=1 check.
Secondary beam analysis – PS and SPS Started May 22, 2012.
R. Zitoun, Stony Brook and LAPP CTF Meeting10 February Much Noise About Nothing? Robert Zitoun Stony Brook and LAPP CTF Meeting February 10, 2003.
Report ~first collision Kotaro Kijima 2010/01/25 Local lab meeting.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
1 Summary on the Wednesday access of BBC FEM 07/28/05 Kazuhisa Yamaura Koutaro Kijima Daisuke Watanabe Misaki Ouchida.
EH1 (AD 1&2, IWS, OWS) PMT Jul. 30 – Aug. 20 RollingGain Calibration Summary Zhe Wang (BNL) and Qing He (Princeton) Aug. 22, 2011.
Presented by: Quinn & Company, L.L.C. A private and secure online service that makes our services more convenient for you.
Control Your Anger Presented By: Mr. Pawan Kumar Sharma (Principal), JNV Shimla.
There once was a little boy who had a bad temper. His Father gave him a bag of nails and told him that every time he lost his temper, he must hammer.
A LITTLE BOYS TEMPER. There once was a little boy who had a bad temper. His father gave him a bag of nails and told him that every time he lost his temper,
MAX AT 16 YEARS OLD MAD MAX IS BURNING INSIDE.
RECENT CAL PROBLEMS (including DQM person confusions) and DQM SHIFT TODO REMINDER T. Schörner-Sadenius Hamburg University CAL Meeting, 11 January 2005.
M. Bonesini - 3/10/061 M. Bonesini INFN Milano Some results from BTF testbeam on TOF.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
GLAST LAT Project Software vrvs meeting X. Chen 1 GLAST LAT Project Software vrvs meeting X. Chen 1 Analyses of Muon Calibration Data Xin Chen.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
School. Answers to School Questions Question 7th grade Brediceanu 7th grade School No 2 5th grade School no 2 How many years of compulsory education do.
CAL DQM SHIFT TODO and RELATED MATERIAL T. Schörner-Sadenius Hamburg University CAL Meeting, 13 October 2004.
ScECAL Fermilab Beam Test analysis ScECAL Group Meeting Kyungpook National University, Daegu, Republic of Korea, August 6 th, 2010 Adil Khan, Satoru Uozumi,
CAL and SUBCOMPONENTS STATUS OVERVIEW T. Schörner-Sadenius Hamburg University, on behalf of the CAL group ZEUS Meeting DESY 28 February – 4 March 2005.
Mikila Williams Period 4.
Saturation in V-calib LED scans CALICE AHCAL – Main Meeting 2010/07/05 Jaroslav Zalesak analysis still in progress but gives global results FNAL & CERN.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
CAL DQM February 2004 Thomas Schörner-Sadenius DESY, 25 February 2004.
E-165 (FLASH) Status 8:00am 6/13/2004. Thick Target Program Primary goal is to measure the fluorescence light output at different stages of shower development.
CAL OVERVIEW and DATA QUALITY REPORT T. Schörner-Sadenius Hamburg University ZEUS Meeting Padova, October 2004.
CAL DQM REPORT T. Schörner-Sadenius Hamburg University CAL/HES Meeting, 4 January 2005.
RUN COORDINATOR’S REPORT 1-8 May 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 8 May 2006.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
CMS pixel data quality monitoring Petra Merkel, Purdue University For the CMS Pixel DQM Group Vertex 2008, Sweden.
ScECAL BeamTest Analysis Asian ScECAL Meeting Jan 14 th, 2010 Adil, Satoru Uozumi, DongHee Kim.
CAL SHIFT MARCH 2004 Thomas Schörner-Sadenius Hamburg University CAL Meeting DESY 24 March 2004 Think carefully whether you consider being on shift.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
DQM SHIFT TODO REMINDER T. Schörner-Sadenius Hamburg University CAL Meeting, 18 January 2005.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
TTF - ECAL Plenary in CMS week ECAL Stability Contacts: Marc Dejardin, Julie Malcles (laser)
Cal DQM Report 3/03/04 – 3/10/04. What was done March 3-4: Access March 5-6 : Machine studies.
CAL DQM January 2004 Thomas Schörner-Sadenius DESY, 28 January 2004.
Pedestal Stability and Sparsification Nick Woods UNCW July 29, 2005.
BBC Readiness Report for p+p 2008 Jan.29th Misaki Ouchida, Kazuhisa Yamaura Hiroshima University.
If you could change one thing in FLO…. Change for change’s sake How can we improve the learning experience for students? How can we improve the teaching.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
插入语,承上启下 by accident by mistake by subway 构成方式状语 by 6 am by the end of by the time … by 6 am by the end of by the time … 构成时间状语 ( when ) by doing sth.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
Medication Administration: Getting it Right
Massimo Masera INFN sezione di Torino
CAL DQM Report June 2nd – June 9th.
Online Calibration Online calibration: validation: L3fCalCalibTool –
IS IT EFFECTIVE TO RUN ONLINE DATING BACKGROUND CHECKS YOURSELF?
Level-1 Calo Monitoring
Using the Gyro Sensor and Dealing with Drift
TKR to CAL for 16 Towers The usual TKR extrapolation to CAL study, for the 16 tower data. Check calibrations, look for problems, etc. Today -- “work in.
Eric oberla Herve grabas
E. Garutti - Main Meeting
AGATA WEEK Uppsala 7-11 July 2008
Mid-semester feedback
Cal DQM Report 11/26/03 – 12/03/03.
Status of the η/η’ run (April 2009)
Status of the η/η’ run (April 2009)
Presentation transcript:

Cal DQM Report July 7 – July 14, 2004

July 8th Updated bad channel list using CAL quick-calib 50632 Created version 3653 with 357 bad channels, 0 holes. 6 bad FEC’s, 3 bad ADC’s

B5 UNO

July 9th Updated bad channels using CAL quick-calib 50644 Version 3654 created with 361 b.c’s and 0 holes Same bad FEC’s & ADC’s Checkout runs done: QINJ 18361 UNO 18362 PED 18363 LASER 18364 LED 18365 Created version 3654 by mistake-didn’t use it

July 9th (cont.) Full Electronic Calibration CALIB version 3656 66 b.c’s, 0 holes Trimming: UNO 18375 59(0) 121(0) 29(0) UNO 18380 44(0) 116(0) 27(0) Created version 3657 with 302 b.c’s and 0 holes 3 FEC’s and 2 ADC’s

July 10 Updated bad channel list with CAL quick-calib 50661 Created version 3658 313 b.c’s 0 holes

July 11 Updated bad channel list with CAL quick-calib 50677 Created version 3659 316 b.c’s 0 holes Called by ZCR at 10:30, the hip presenter shows 12 new b.c’s for QINJ during run 50684 Compare QINJ for 50677 and online QINJ histos, bad channels in R5. I told the ZRC to take a CAL quick-calib, and that I would use it to update the b.c’s

Comparison of R5 for 2 runs

July 12 Updated bad channel list using CAL quick-calib 50687 Unfortunately R5 is not bad anymore… Created version 3660 with 321 b.c’s and 0 holes ZCR calls-1 hour break Run auto_adc2volt.sh Creates adc2volt version 2381, cal verison 3662, with 295 b.c’s, 0 holes

R5 revisited, problem gone

July 12 (cont.) Did checkout runs QINJ 18390 UNO 18391 PED 18392 LASER 18393 LED 18394

July 13 Updated b.c’s using CAL quick-calib 50698, version 3663: 303 b.c’s, 0 holes (done the previous night) Took checkout runs QINJ 18395 UNO 18396 PED 18397 LASER 18398 LED 18399 Break in morning but no call from ZCR, instead they did a CAL quick-calib, so I used it to update the b.c’s, version 3664: 306 b.c’s, 0 holes.

Problems No calls from ZCR! (Except for the R5 thing)

DQM Checked all runs taken during the week, all seemed fine, some weird thing in the pull for BCAL.