SIG Field of NDP Probe Request

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0507r0 Submission Synch Frame Follow Up Date: Authors: May 2013 NameAffiliationsAddressPhone Young Hoon KwonHuawei.
Advertisements

NDP Type PS-Poll Frame Date: Authors: July 2012 Month Year
Doc.: IEEE /0612r0 Submission Serivice Type Indication in Association Date: xx Authors: May 2012 Wu Tianyu, HuaweiSlide 1 NameAffiliationsAddressPhone .
Restricted Access Window Signaling for Uplink Channel Access
Doc.: IEEE /0816r0 Submission July 2012 Channel Selection for ah Date: Slide 1 Name AffiliationsAddressPhone Huai-Rong Shao.
TGah Submission Doc: ah July, 2012 Sectorization for hidden node mitigation NameAffiliationsAddressPhone George Calcev Huawei3601 Algonquin.
Submission doc.: IEEE /0834r0 Speed Frame Exchange Date: Slide 1 Authors: July 2012 Eric Wong, Broadcom NameAffiliationsAddressPhone .
Doc.: IEEE /1302r0 Submission November 2012 Yongho Seok, LG ElectronicsSlide 1 TXOP Truncation Date: Authors: NameAffiliationsAddressPhone .
TGah Submission Doc: ah May, 2012 Non-TIM Stations in 11ah NameAffiliationsAddressPhone George Calcev Huawei3601 Algonquin Road, Rolling.
Doc.: IEEE /1352r08 Submission November 2012 David Halasz, Motorola MobilitySlide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for.
Doc.: IEEE /0831r0 Submission July 2012 Yongho Seok, LG ElectronicsSlide 1 Uplink Channel Access General Procedure Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /1093r0 Submission September 2012 Jeongki Kim, LG ElectronicsSlide 1 System information update procedure for 11 ah Date:
Doc.: IEEE /1115r09 Submission September 2012 David Halasz, Motorola MobilitySlide 1 IEEE ah Sub 1 GHz license-exempt operation Agenda for.
Doc.: IEEE /1089r0September 2012 Submission Qi Wang, BroadcomSlide 1 Frame Classification Based on MAC Header Content Date: Authors:
Submission doc.: IEEE /0656r1 Slide 1Panasonic September 2012 Extended Sleep mode for battery powered STAs Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0830r0 Submission July 2012 Yongho Seok, LG ElectronicsSlide 1 NDP Probing Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0869r0 SubmissionJae Seung Lee, ETRISlide 1 Active Scanning for 11ah Date: July 2012 Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0306r0 Submission Sector Discovery for 11ah Date: Authors: March 2013 NameAffiliationsAddressPhone Minho CheongETRI.
Doc.: IEEE /0026r0 Submission January 2013 Yongho Seok, LG ElectronicsSlide 1 Security Procedure for Long Sleeper Date: Authors: NameAffiliationsAddressPhone .
Doc: ah - Sensor Only BSS September 2012 Submission Sensor Only BSS Date: Huawei Technologies Inc. Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /0519r0 SubmissionSlide 1 Speed Frame Exchange Using NDP Frames Date: Authors: Shoukang Zheng, I2R May 2013 NameAffiliationsAddressPhone .
Doc.: IEEE /0042r1 Submission January 2013 Yongho Seok, LG ElectronicsSlide 1 Fast Moving Scan Channel Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /1304r0 Submission November 2012 Yongho Seok, LG ElectronicsSlide 1 AID Assignment Protocol Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /891r0 Submission July 2012 AID reassignment for TIM and non-TIM modes switching Date: Slide 1 Authors: Betty Zhao, et.
Submission doc.: IEEE /0867r0 July 2012 Slide 1 Date: Authors: Non-TIM Allocation Hyoungjin Kwon, ETRI NameAffiliationsAddressPhone .
Doc.: IEEE /0525r1 SubmissionSlide 1 OBSS Mitigation Date: Authors: Chao-Chun Wang, MediaTek May 2013 NameAffiliationsAddressPhone .
Doc.: IEEE /0290r0 SubmissionSlide 1 RAW Operation Improvement Date: Authors: NameAffiliationAddressPhone Yuan ZhouI2R1 Fusionopolis.
Doc.: IEEE /0080r0 Submission January 2013 Yongho Seok, LG ElectronicsSlide 1 Backoff Procedure in RAW Date: Authors: NameAffiliationsAddressPhone .
Omission of Probe Request
RAW Assignment follow up
TGai-Motion/Straw Poll-Jan-2013-Vancouver
Uplink Data Delivery Date: Authors: Month Year
Triggering the Broadcast Probe Response
Duplicate Bandwidth and Operation
OBSS Mitigation Date: Authors: May 2013 Month Year
Fast Authentication in TGai
Triggering the Broadcast Probe Response
Periodic Channel Access
Active Scanning for 11ah Follow Up 2
Active Scanning for 11ah Follow Up
WUR Frame Format for Smart Scanning
Comments on Relay Date: Authors: Month Year
Page Scheduling Date: Authors: May 2013 Name Affiliation
CCA Threshold Levels Date: Authors: January 2011 Month Year
Duplicate Detection of Short MAC Frame
Consideration on multi-AP coordination for EHT
Reducing the Probe Response transmission
Spectral Mask and Flatness
Proposed SFD Text for ai Prioritized Active Scanning
Consideration on multi-AP coordination for EHT
PPDU Recovery Procedure
Usage of Doppler Bit in 11ax
Sensor Only BSS Date: Authors: Name Affiliations Address
Spectral Mask and Flatness
Prioritized Active Scanning in TGai
Multi-AP Transmission Procedure
TIM and Page Segmentation
AID update procedure for TDLS peer STA
LG R&D Complex Anyang-Shi, Kyungki- Do, Korea
Multi-AP Transmission Procedure
PAPR Reduction for MCS0 Rep 2
Triggering the Broadcast Probe Response
TGah Awards Date: Authors: July 2017
Omission of Probe Request
Proposed SFD Text for ai Prioritized Active Scanning
Channelization Selection for ah
Month Year doc.: IEEE /0xxxr0 September 2012
Multi-AP Transmission Procedure
GAS procedure in TGai Date: Authors: May 2012 Month Year
Month Year doc.: IEEE yy/xxxxr0 May 2012
Presentation transcript:

SIG Field of NDP Probe Request Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2012 SIG Field of NDP Probe Request Date: 2012-09-17 Authors: Name Affiliations Address Phone Email Yongho Seok LG Electronics LG R&D Complex Anyang-Shi, Kyungki- Do, Korea +82-31-450-1947 yongho.seok@lge.com Jinsoo Choi Jeongki Kim Jin Sam Kwak Eric Wong Broadcom Sunnyvale, CA +1 408 922 6672 ewong@broadcom.com Matthew Fischer mfischer@broadcom.com Minyoung Park Intel Hillsboro, OR +1 503 712 4705 minyoung.park@intel.com Adrian Stephens Tom Tetzlaff Emily Qi Simone Merlin Qualcomm San Diego, CA +1 858 845 1243 smerlin@qualcomm.com Santosh Abraham Menzo Wentink Alfred Asterjadhi Amin Jafarian Hemanth Sampath VK jones Yongho Seok, LG Electronics John Doe, Some Company

Authors: September 2012 Month Year doc.: IEEE 802.11-yy/xxxxr0 Name Affiliations Address Phone Email Yong Liu Marvell Hongyuan Zhang Sudhir Srinivasa George Calcev Huawei Rolling Meadows, IL, USA George.Calcev@huawei.com Osama Aboul Magd Young Hoon Betty Zhao David Yangxun Bin Zhen ChaoChun Wang MediaTek James Wang Jianhan Liu Vish Ponnampalam James Yee Huai-Rong Shao   Samsung Electronics Chiu Ngo Minho Cheong ETRI Jae Seung Lee Hyoungjin Kwon Heejung Yu Sok-kyu Lee Sun, Bo         ZTE Lv, Kaiying         John Doe, Some Company

Authors: September 2012 Name Affiliations Address Phone Email Sayantan Choudhury Nokia Taejoon Kim Klaus Doppler Chittabrata Ghosh Esa Tuomaala Ken Mori Panasonic Rojan Chitrakar Haiguang Wang I2R Shoukang Zheng Yeow Wai Leong Zander Lei Jaya Shankar Anh Tuan Hoang Joseph Teo Chee Ming Yongho Seok, LG Electronics

Overview of NDP Probing Procedure [1] September 2012 Overview of NDP Probing Procedure [1] STA transmit NDP Probe Request frame. NDP Probe Request frame format is defined as follows SIG field is TBD AP responses Probe Response/Short Beacon frame after back-off. Probe Response/Short Beacon frame is broadcasted. PHY-CCA.indication (busy) primitive has not been detected before the ProbeTimer reaches MinChannelTime, then set NAV to 0 and scan the next channel. [IEEE 802.11-2012] After receiving Short Beacon/Probe Response frame, STA may transmit Probe Request frame/Association Request frame or listen to full Beacon frame for obtaining the more information. Yongho Seok, LG Electronics

Proposed SIG Field of NDP Probe Request September 2012 Proposed SIG Field of NDP Probe Request SIG Field Information 1 MHz mode PHY Compressed SSID is computed as the 32bit-CRC of SSID. But, 16 LSBs of 32bit-CRC are included. MCS SSID/Interworking Present (when set to 0) Access Network Option Reserved CRC Tail 4 1 8 13 6 MCS SSID/Interworking Present (when set to 1) Compressed SSID Reserved CRC Tail 4 1 16 5 6 Yongho Seok, LG Electronics

Proposed SIG Field of NDP Probe Request September 2012 Proposed SIG Field of NDP Probe Request SIG Field Information 2MHz mode PHY MCS SSID/Interworking Present (when set to 0) Access Network Option Reserved CRC Tail 4 1 8 25 6 MCS SSID/Interworking Present (when set to 1) Compressed SSID Reserved CRC Tail 4 1 32 6 Yongho Seok, LG Electronics

September 2012 Conclusion In this proposal, we suggest SIG Field of NPD Probe Request frame Yongho Seok, LG Electronics

September 2012 Reference [1] https://mentor.ieee.org/802.11/dcn/12/11-12-0830-00-00ah-ndp-probing.ppt Yongho Seok, LG Electronics

Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2012 Straw Poll Do you support the following SIG Field of NDP Probe Request? 1MHz mode PHY 2MHz mode PHY B0 B3 B4 B5 B12 B13 B20 B21 B25 B26 B29 B30 B35 MCS SSID/Interworking Present Access Network Option Reserved CRC Tail Compressed SSID B0 B3 B4 B5 B12 B13 B36 B37 B38 B41 B42 B47 MCS SSID/Interworking Present Access Network Option Reserved CRC Tail Compressed SSID Note – The position of the MCS field is TBD. Yongho Seok, LG Electronics John Doe, Some Company