Tagger Microscope Detector & Electronics Status

Slides:



Advertisements
Similar presentations
Beam test of the microscope prototype and active collimator preliminary report on the parasitic beam tests in Hall B April 2011 Richard Jones, Igor Senderovich,
Advertisements

Performance of MPPC using laser system Photon sensor KEK Niigata university, ILC calorimeter group Sayaka IBA, Hiroaki ONO, Paul.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Microscope Performance at elevated dark rates Richard Jones University of Connecticut collaboration GlueX collaboration meeting, Newport News, Feb. 2-4,
Tagger Microscope:  Performance Features Under Test Detector Alignment  Simulations show that when fiber axis is aligned to < 3 o of the e - trajectory.
James M c Intyre University of Connecticut GlueX Collaboration Meeting JLab, Feb. 2-4, 2011.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter As of 9am 05/28/2003.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
Studies on Module 0 HAC V. Fascianelli, V. Kozhuharov, M. Martini, T. Spadaro, D. Tagnani.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
TAGGER MICROSCOPE ELECTRONICS CONSTRUCTION Readiness Review Feb. 7, 2013 Alex Barnes.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
Status of scintillator KLM study P. Pakhlov (ITEP)
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
Uni Bergen:G. Eigen, E. van der Kraaij, J. Zalieckas FZU Prague: J. Cvach, J. Kvasnička, I. Polák Linear Collider Workshop, Tokyo 13/11/2013.
R&D of MPPC for T2K experiment PD07 : Photosensor Workshop /6/28 (Thu) S.Gomi T.Nakaya M.Yokoyama H.Kawamuko ( Kyoto University ) T.Nakadaira.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
1 MPPC update S.Gomi, T.Nakaya, M.Yokoyama, M.Taguchi, (Kyoto University) T.Nakadaira (KEK) Nov KEK.
Neutron detection in LHe ( HMI run 2004) R.Golub, E. Korobkina, J. Zou M. Hayden, G. Archibold J. Boissevain, W.S.Wilburn C. Gould.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Development of Multi-Pixel Photon Counters(MPPC) Makoto Taguchi Kyoto University.
Trip-t testing progress report
1 SiPM studies: Highlighting current equipment and immediate plans Lee BLM Quasar working group.
Gain stability and the LYSO beam radiation monitor measurements
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Eli Piasetzky Tel Aviv University Beam Scintillating Fibers PSI, Technical Review, July 2012 Guy Ron Hebrew University Israel.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
FARICH status E.A.Kravchenko Budker INP, Novosibirsk, Russia.
Performance of 1600-pixel MPPC for the GLD Calorimeter Readout Jan. 30(Tue.) Korea-Japan Joint Shinshu Univ. Takashi Maeda ( Univ. of Tsukuba)
Tuesday, 20 May 2003OPERA Collaboration Meeting - Gran Sasso1 Status of front-end electronics for the OPERA Target Tracker LAL Orsay S.BONDIL, J. BOUCROT,
Enhancement Presentation Carlos Abellan Barcelona September, 9th 2009.
Status of front-end electronics for the OPERA Target Tracker
Development of Multi-Pixel Photon Counters (1)
Fabio, Francesco, Francesco and Nicola INFN and University Bari
The New CHOD detector for the NA62 experiment at CERN S
An active target for MEG2, a status report
The PSD at Pb-Pb run PSD drawbacks at Ar beam
Commissioning of the Crystal evaluation setup
Light mixer proposal Arjan Heering, Anton Karneyeu
A General Purpose Charge Readout Chip for TPC Applications
Scintillation Detectors in High Energy Physics
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
CTA-LST meeting February 2015
The Beam Test at Fermilab:
Prototype activities update
Panagiotis Kokkas Univ. of Ioannina
Characteristics of S12045(X) photon sensors for GlueX
Status of n-XYTER read-out chain at GSI
BESIII EMC electronics
The PrimEx-I Experiment
R&D of MPPC for T2K experiment
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
First results with Hamamatsu SiPM, microscope preamp v2.0
Development of hybrid photomultiplier for Hyper-Kamiokande
Scintillator HCal Prototype
R&D of MPPC in kyoto M.taguchi.
Presentation transcript:

Tagger Microscope Detector & Electronics Status GlueX Collaboration Meeting JLab, May 21-23, 2012 Tagger Microscope Detector & Electronics Status James McIntyre, Alex Barnes

GlueX Collaboration Meeting, JLab May 21-23, 2012 Outline TDR Status photon beam section updates Construction Status scope of contract contract timeline construction area Electronics overview readout comparison, cross talk, saturation high and low gain comparison single pixel measurement, cosmic ray spectrum, power

GlueX Collaboration Meeting, JLab May 21-23, 2012 TDR Status Photon Beam Section Starting draft – Beamline paper 3/2009 doc-1127 Updates: Triplet polarimetry Collimator cave layout Permanent magnet Realization of neutron background changes to remediate affects Many components beam tested modify language on operational readiness

GlueX Collaboration Meeting, JLab May 21-23, 2012 Construction Status Scope of contract Fabrication of the Hall D Tagger Microscope & Active Collimator tagger microscope - JLab supplied material, services & equipment supply SiPMs provide engineering consultation approve all construction drawings & electronics active collimator - JLab supplied material, services & equipment provide components provide engineering consultation approve all electronics responsible for all aspects of integration into photon beamline controls, data acquisition, and trigger

GlueX Collaboration Meeting, JLab May 21-23, 2012 Construction Status Scope of contract UConn supplied material, services & equipment consumables, machinery, and facilities for fabrication & assembly labor construction manager – J. McIntyre Construction Plan Quality Assurance & Acceptance Test Plan written update (every two weeks) on construction status monthly progress reports on: construction relative to baseline schedule cost for input to the projected Earned Value Management System

GlueX Collaboration Meeting, JLab May 21-23, 2012 Construction Status Scope of contract UConn responsibilities: develop detailed schedules & procedures for fabrication & testing construction drawings of the tagger microscope design, lay out, and test preamplifier board for tagger microscope deliver & test one first article preamplifier board purchase electronics for active collimator fabricate tagger microscope IAW approved construction drawings report all results from the Quality Assurance Plan package & ship all equipment to JLab

GlueX Collaboration Meeting, JLab May 21-23, 2012 Construction Status Contract timeline Tagger Microscope t0 anticipated to be in October 2012

GlueX Collaboration Meeting, JLab May 21-23, 2012 Construction Status Contract timeline Active Collimator

GlueX Collaboration Meeting, JLab May 21-23, 2012 Construction Status Construction Area cleaning & setup underway summer staff: physics program graduate engineering undergraduate

GlueX Collaboration Meeting, JLab May 21-23, 2012 Construction Status Populating the Construction Area on track for “Readiness Review” estimated November 2012

GlueX Collaboration Meeting, JLab May 21-23, 2012 Preamp Version 2.0 Hamamatsu SiPMs Improved upon previous design 15 individual channels 3 summed channels containing 5 summed individual channels Summer has high and low gain modes Amplifier circuit has more space and ground between traces Our first attempt at mounting the SiPMs resulted in a discolored component but it still functions properly

GlueX Collaboration Meeting, JLab May 21-23, 2012 Comparison between the individual and summed readouts Single channel readout of one biased SiPM Comparison between outputs: One SiPM biased, others left unbiased Averaged over 128 samples Summed output replicates individual readout when only one signal input Rise time is about 2ns, fall time about 12.5ns Summed readout of one biased SiPM

GlueX Collaboration Meeting, JLab May 21-23, 2012 Cross talk between summers for single biased SiPM Low light amplitude One SiPM biased, measured through the summed output Pulse signal measured in biased summed output and the cross talk is measured in the unbiased summed outputs Conducted in both low and high light levels Cross talk is less than 2% High light amplitude

GlueX Collaboration Meeting, JLab May 21-23, 2012 Saturation of a single SiPM in high gain mode One SiPM biased in high gain mode Averaged over 128 samples Saturation measured for multiple Vcc levels SiPM saturates at approximately 1800mV at typical operational voltage as predicted

GlueX Collaboration Meeting, JLab May 21-23, 2012 High and low gain comparison Single SiPM biased with light source in low gain Every 50 channels corresponds to 50mV Mean pulse height of 137.4mV 50mV per 50 channels Single SiPM biased with light source in high gain Every 50 channels corresponds to 500mV Mean pulse height of 1510mV Factor of 10 in amplification 500mV per 50 channels

GlueX Collaboration Meeting, JLab May 21-23, 2012 Single-pixel spectrum pedestal Single biased SiPM in high gain mode Every 50 channels corresponds to 10mV Each pixel in high gain corresponds to 10mV, as predicted In low gain this is 1.0mV per pixel one pixel two pixels three pixels adc channels

GlueX Collaboration Meeting, JLab May 21-23, 2012 Extracting photoelectron yield from cosmic spectrum We expect a rate of We expect photoelectrons per cosmic, where 1.7 is the loss per distance traveled in plastic 0.25 is the thickness of the fiber 0.06 is the capture fraction of the fiber 0.10 is the detector efficiency 0.9 is the attenuation of the fiber 1pe = 5 channels pedestal tail adc channels

GlueX Collaboration Meeting, JLab May 21-23, 2012 Extracting photoelectron yield from cosmic spectrum Expected rates are low: 700 / day Run for 3 days and look Cosmics clearly visible, but peak is hidden under the pedestal tail N0 = 5 MHz 1pe = 5 channels pedestal tail pedestal rate ~ N0 e-1.15 Npe adc channels To see a signal at 7 10-8 N0 , pulse height must be > 18 pe Give up on <n>, measure percentiles instead : spectral integral is known Implies result for tagged electrons: N50% = 16 * 8 = 130 pe / tag about <n> ! 55’th percentile (close to median) = 18 pe  10% (syst. error) too low ! 18

GlueX Collaboration Meeting, JLab May 21-23, 2012 Extracting photoelectron yield from cosmic spectrum Expected yield: 700 / day Requirement: 200 pe/tag Solution: use 50 micron SiPM Relative PDE: factor 2 larger 1pe = 5 channels pedestal tail adc channels Other differences: gain is factor 3 larger, current is factor 3 larger Unchanged: capacitance, bias voltage, active area, package form, price ! Ready to test immediately Would like to borrow a 50 micron 3mm SiPM from Jlab for test Cosmic peak will separate from pedestal, show clearly what <n> is.

GlueX Collaboration Meeting, JLab May 21-23, 2012 Power per channel Our operating voltage will be 5.80V The power per channel is approximately 75mW The total power for all 500 channels is 40W

Summary TDR update well underway Construction contract paperwork submitted On track for readiness review (estimated 11/2012) No more preamplifier board revisions Know how to mount SiPMs but it would be nice to have a robot Know how to calculate photoelectrons, measured and got a consistent answer ±10% Median 200 p.e. for axial moving electrons Enough light for time resolution needed

GlueX Collaboration Meeting, JLab May 21-23, 2012 Questions?

GlueX Collaboration Meeting, JLab May 21-23, 2012 Differentiation Time In high gain mode there is an over swing on the signal return with an exponential decay Each SiPM was tested and the average time constant is 157.80ns Intentionally saturated This effect is not noticeable in low gain mode