Monthly Production from NCS 2018 compared with prognosis and 2017

Slides:



Advertisements
Similar presentations
IQ and Human Evolution. Readings
Advertisements

Deviation = The sum of the variables on each side of the mean will add up to 0 X
X = =2.67.
Find the mean, variance, and standard deviation of these values: 6.9, 8.7, 7.6, 4.8, 9.0 Sum=
George A. Galleher, PE Hydro Fleet Operations Duke Energy Carolinas NC Drought Management Council Duke Energy Update March 24, 2011.
REPENTURN July 5, 2015 REPENTURN REPENTURN REPENTURN.
CHAPTER: 12 FORECASTING (MSC 301) MD. TAMZIDUL ISLAM FACULTY, BBS.
Addition Flashcards Sum of
Sub-group 6: Indirect Effects of Other Fuels Presented to the LCFS Expert Workgroup August 17, 2010 Sacramento, CA.
1 Forecasting. 2 Introduction Six Forecasting steps: 1. Determine the use of the forecast 2. Select the items or quantities to be forecasted 3. Determine.
1 Presentation to the Louisiana Tax Commission 2011 Rules and Regulations Chapter 11 – Drilling Rigs by Louisiana Oil and Gas Association and Louisiana.
TBC Ingredients ApS TBC Ingredients ApS Edible oils monthly price development month development on page December 2012.
2017 RTP Update Doug Murray May, 2017 RPG Meeting Welcome to.
PT AKEBONO BRAKE ASTRA INDONESIA
Western Municipal Water District Drought Update
Time Series: Domain  Global Analysis “Monthly Precipitation”
SECTION 3-1 pp Average Monthly Expenditures.
The Term Structure and Economic Growth: The Recession of 2001
تخمین مخازن در چاههای اکتشافی
GDP.
Accurate fluid samples are needed to define fluids in place, especially condensate volume. Separator samples should almost always be used for gas condensate.
عمل الطالبة : هايدى محمد عبد المنعم حسين
آشنايی با اصول و پايه های يک آزمايش
INCENTIVE TRIP LOCATION
The Term Structure and Economic Growth: The Recession of 2001
July 2016 Fatal Accident Rate, Fatality Rate, and Accident Rate Update
Industry Capital Expenditures
انواع المخاليط (التدريس الابداعي )
Monthly Production from NCS 2018 compared with prognosis and 2017
The Term Structure and Economic Growth: The Recession of 2001
Monthly Production from NCS 2018 compared with prognosis and 2017
Replace With Title of Your Choice
Net Metering Updates Benjamin Inskeep Energy Policy Analyst
Solubility.
Gastroenterology 2011–2016: Looking Back and Forward
Private and Private-Stated Related Schools
Pressure drawdown to a gas condensate well
Monthly Production from NCS 2018 compared with prognosis and 2017
April May April May June July July June August Sept August
Viral Load Suppression Project Updates
Name the 3 elements necessary for a fire to exist.
FY14 Q1 Forecast Review Meeting July 2013
Monthly Production from NCS 2018 compared with prognosis and 2017
Strategic Planning Timeline Overview
Pre-Encumbrances.
Presented for ND League of Cities by Pam Sharp, Director of OMB
AE 473 Liquid Propulsion : Engine Cyles. Open and Closed Engine Cycles.
Busch Vacuum Technology
Select Committee on Finance National Council of Provinces
Florida Atlantic University
Florida Atlantic University
Chillicothe CSD Five Year Forecast Update for May 2011 Filing
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
February 2007 Note: Source:.
Revenue Cycle Update November 14, 2016
AS IT MONTHLY REPORTS AUXILIARYSERVICES I T For July 2017
Military Career Pathways Fort Lee, Virginia, 28 June – 1 July 2015
North Carolina’s Overdose Data Resources
Disney Nature Life is Beautiful
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
The Particle Model of Matter
Маңғыстау облысы, Маңғыстау ауданы, Өтес селосы
Monthly Production from NCS 2019 compared with prognosis and 2018
Florida Atlantic University
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
Industry Capital Expenditures
Monthly Production from NCS 2019 compared with prognosis and 2018
F&A Meeting June 19, 2018.
INTRODCTION OF OIL AND GAS INDUSTRY :.
Community Solar Policies and Programs
Presentation transcript:

Monthly Production from NCS 2018 compared with prognosis and 2017 Updated to July

Production July 2018 Production July 2018 1,525 1,911 348,6 0,652 Oil Sum liquid Gas Total mill bbl/d MSm³ /d MSm³ o.e/d Production July 2018 1,525 1,911 348,6 0,652   Forecast for 1,567 1,943 328,9 0,638 Deviation from forecast -0,042 -0,032 19,7 0,014 Deviation from forecast in % -2,7 % -1,6 % 6,0 % 2,2 % June 2018 1,487 1,847 309,6 0,603 Deviation from 0,038 0,064 39,0 0,049 Deviation in % from 2,6 % 3,5 % 12,6 % 8,1 % July 2017 1,622 1,998 342,2 0,660 -0,097 -0,087 6,4 -0,008 -6,0 % -4,4 % 1,9 % -1,2 %

Oil production 2018

Liquid production 2018

Gas production 2018