ELCITA UPDATE September 2016
Estate Management Skywalk E – Toilets 16 e-toilets operational. M/s mayaPRAXIS have submitted the draft report - Preliminary Feasibility Study on Skywalk system for Electronics city phase 1. E – Toilets 16 e-toilets operational. Estate survey Roads & common area survey completed for Phase 1& 2. Plot Inventory of the Industries 100 % completed. GIS Web Application Software Installed in ELCITA server. Testing work in progress.
Road Works – Completed Wipro Neeladri Road – Under Progress Concrete Pavements along Doddanagamangala Village Road
Drain Works – Under Progress Drain Work towards Goa Estate Drain Work along TCS Road
Drain Works – Under Progress Kerbstone work for 300KLD STP Road RCC Culvert Opp MSME Building
6KL capacity Sump in KIADB Ecity East Phase Drain Works – Under Progress 6KL capacity Sump in KIADB Ecity East Phase Doddathogur Drain
Drain Works – Under Progress Drain work at Celstream RCC Drain work at Ramsoft Road
Drain Works – Under Progress Sewer line work Opp Canara Bank. Pavers/Drain work at Amphenol
Drain Works – Under Progress Drain work at Ramakrishna Hospital SSM Drain work along Rajakaluvae to continue the Footpath
Drain Works – Under Progress Drain work at JP IT Park Road Kerbstone Raising work at KSSIDC Complex
Drain Works – Completed Drain Work From Wipro Gate 5 to Wipro Gate 16 Drain Work in front of CDac
Drain/Footpath Works – Completed Removing the existing pavers & laying the new Pavers at Salarpuria Info Zone Police Station Drain
Misc Works – Completed Petty Shop Removed and covered at Tech Mahindra road Barbed Wire Fencing at Pump House
Misc Works – Completed Road Widening from RS Electronics to Flextronics Road Widening at Pumphouse
Misc Works – Completed Replacing the existing chamber cover with RCC heavy slab with Chequer Plate.
Pot Hole Filling Works – Completed
Painting Works – Completed Kerbstone Painting along Velankani Road, HP Avenue & Wipro Avenue etc.,
Sustainability Projects RWH works – Under Progress SI.NO DESCRIPTION NO OF PITS STATUS 1 RAIN WATER HATVESTING PIT 47 COMPLETED 2 WORK IN PROGRESS
20 feet deep well Rainwater Harvesting Pit at Various locations
Estate Management Contract Awarded Providing and laying of Asphalting using 60/70 grade bitumen along Café Corner & JP IT Park Road MSME Entry Gate to Exit Gate for 300KLD STP KSSIDC Complex Road Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs along TCS Road
Estate Management Contracts on Anvil Providing House Keeping Services to ELCITA within Ecity Industrial Area. Providing Security Services to ELCITA within Ecity Industrial Area. Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along XIME Road Petrol Bunk Road & Golden Tulip Road Landscaping work below fly over (Phase 1 & 2) Providing UGD to connect industries in cluster 2 & 3 to the 300 KLD STP. Construction of 500 KLD STP in KIADB Land, Electronics City Phase 2
Thank You