SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Advertisements

Joint Defra/EA FCERM R&D Programme: Strategy and Policy Development Theme overview.
Robert Goldstein Senior Technical Executive, Water & Ecosystems WSWC–WGA Energy–Water Nexus Workshop Denver, April 2, 2013 Water Prism: Decision Support.
Adapting the city. Water Infrastructure & Climate Change Chris Matthews.
WHAT IS GREEN INFRASTRUCTURE ? Khris Dodson, Environmental Finance Center November 17, 2010.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
October 20-21,2009 Agenda Item 6a.. Ohio River CSO Communities Pennsylvania – 10 communities West Virginia – 10 communities Ohio – 10 communities Kentucky.
Spokane River Forum 26 May 2013 Spokane’s CSO Reduction Status.
Welcome to The Expert Community Forum 19 November 2007.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
Do You Know Where Your Peak Flow Is?. - OR – Why Everyone Needs to Know About Blending Presented at BACWA Wet Weather Management Workshop May 28, 2008.
Wastewater Collection System Optimization An Innovative Approach to Capital Improvement Planning COPYRIGHT – OPTIMATICS PTY LTD
Innovative and effective approaches to climate change: Experiences from the Global Climate Change Alliance Brussels 12 th -14 th September 2012 Thematic.
Shaping the Future of Care Together 4 th November 2009 David Behan Director General for Social Care, Local Government and Care Partnerships.
Supporting Development of Organisational Knowledge Management Strategy NHS Librarians Meeting 3 rd June 2010.
1 Bringing Global Thinking to Local Sustainability Efforts: A Collaborative Project for the Boston Region James Goldstein Tellus Institute.
Pilot workshops Alcohol Commissioning Learning Programme 21 & 22 September 2010, City University London.
Presentation to Overview and Scrutiny Committee Introduction2 mins Salford PCT Project Plan3 mins Developing and assessing our options What has our visioning.
One Water LA is a collaborative approach to develop an integrated framework for managing the City’s watersheds, water resources, and water facilities in.
Study region: Moreton Bay catchments in eastern Australia - most rapidly expanding population in Australia – Brisbane area Development of partnership (science,
Using Analysis and Tools to Inform Adaptation and Resilience Decisions -- the U.S. national experiences Jia Li Climate Change Division U.S. Environmental.
Future Earth workshop – Kuala Lumpur Breakout session 2: Research priorities and opportunities to strengthen capabilities within Future Earth in Asia and.
Health and Wellbeing Programme Director
Solid Waste Draft AMP 2018/2021.
James Palmer, HBRC The Future of Our Water; Community Symposium
Climate Change Policy in Victoria
Update on PI Modeling and Nitrogen Removal at Blue Plains
Marine SDI Initiatives
Areas Separate Approaches Parallel Approaches Joint Approaches
Global Best Practice Examples for Integrated Water
STATUS OF LAKE VICTORIA ENVIRONMENTAL MANAGEMENT PROJECT II
A47 / A12 Corridor Improvement schemes
Optimising Sludge Dewatering – Benefits from Shared Water Services
WAgriCo An NFU Perspective
Air Pollution Prevention
Climate and Green Plan Town Hall Toolkit
KEYNOTE STAGE SPONSOR.
Loddon Campaspe Integrated Transport Strategy
Asset Governance – Integrated Strategic Asset Management
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Bolton Palliative and End Of Life Care Strategy
Presentation to Islands Trust Council December 6, 2017 – Victoria, BC
All-Party Parliamentary Health Group – Case Study from Solihull Care Economy (ICASS) Tuesday 15th November 2016.
North Durham CCG and DDES CCG Governing Bodies in Common County Durham & Darlington Community Services Mobilisation and Transformation 18th September.
Overview of working draft v. 29 January 2018
Loddon Campaspe Integrated Transport Strategy
CRUE – The Way Forward Vicki Jackson
Animal Welfare EU Strategy
The Commission Communication on implementation (COM (2012) 95) in relation to Water Industry Directives (Urban Waste Water Treatment, Drinking Water,
Shaping better health for our population
No Yes Yes Yes No No No Yes Yes No
POLICY PROJECT: DESIGNING SOLUTIONS FOR HOMELESSNESS IN AUCKLAND
Project proposal BRENTFORD SUSTAINABLE COMMUNITY STRATEGY
What’s a WQIP and what can they achieve?
Investing in Source Water Protection
Fitness Check EU Water Policy
Scottish Government Responsible for environment & flooding issues
WWater reuse SCG Water Reuse 1/10/2014 Dagmar BEHRENDT KALJARIKOVA
Stormwater PNRP Implementation
Purpose of the Strategy
“Balancing Gray and Green Infrastructure”
Hidden Capacity How Proper Maintenance and Cleaning of Sewer Systems Can Have Huge Benefits! Presentation by the Jersey Water Works CSO Committee For the.
Report on the Asia Pacific Energy Leaders’ Summit
New Biogeographic process
Next steps for scenarios 9 February 2017
Waterway Investment prioritisation
DATA FOR NOW STAKEHOLDERS MEETING July 2019 #DATA4NOW
Te Awarua-o-Porirua Whaitua Implementation Programme
Lower Laguna Madre Estuary Program
Post Point Treatment Plant Resource Recovery Project Update
Presentation transcript:

Porirua Pilot Project Background: Porirua WWTP consent to discharge treated wastewater and wet weather overflows/bypasses to the coast expires in 2020.  Increased frequency of bypass discharges during wet weather events. Need for GWRC to understand the issues impacting decision making around WWTP upgrades and consenting requirements was discussed with senior management WWL in November 2015.  Emerging regulatory framework i.e. PNRP Need to build relationships with WWL and key stakeholders PPP was created early 2016 using Twyfords ‘Power of Co’ model – a method for committing to work collaborating, co- designing and creating solutions together, having a shared long term vision and using an integrated option approach (i.e. assessing the network and treatment plant as a whole) Who’s involved: GWRC, PCC, WWL, Regional Public Health, Ngati Toa.  Wider public consultation to follow.

PPP covers both: Network overflows i.e. pump station discharges and popping manholes discharges to stormwater, freshwater and coastal environments; and Treatment plant discharges i.e. dry weather and wet weather discharges to the coast, including bypass (milliscreened-only) discharges and overflow (untreated) discharges. Refer: screenshot of WWL diagram showing known discharge locations in the Porirua catchment Source: WWL’s global stormwater consent application   WWTP discharge point

Where are we up to: workshops to look at long list options for network overflows and treatment plant/outfall upgrades. Short- listing options at present. Long list options include: Network - BAU, rapid treatment and discharge to harbour, greater conveyance to WWTP, storage to reduce peak flows and a cross-harbour pipeline, in differing combinations. WWTP - existing shoreline outfall, existing/higher standard of treatment, new location for shoreline outfall, new offshore ocean outfall, discharge to land, storage of peak flows and discharge on outgoing tides, in differing combinations. Next steps: Discuss preferred options with stakeholders, determine preferred solution, consenting requirements for various discharges. Key points: The PPP is to produce an integrated solution in an emerging regulatory framework Collaborative process to gain a better understanding of each other’s drivers and constraints (e.g. financial constraints) Shared long term vision for Porirua’s wastewater network that will result in improved environmental and public health outcomes Consents are only part of the solution/outcome – PPP is not just focussed on consenting, but the regulatory requirements provides a basis to build a broader conversation / process around it. Solutions may potentially be both regulatory (driven out of a consenting process), and non-regulatory (for instance network improvement strategies). PPP brings in key stakeholders into process early to co-define the problem, co-design the process to work through problems, and co-deliver the solutions – so it also becomes highly linked with a wider set of drivers (Iwi values, Whaitua processes, LTP planning priorities and the PNRP)