LARP Phase II Secondary Rotatable Collimator

Slides:



Advertisements
Similar presentations
Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Advertisements

Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Make Tetris Using Java By bearzx.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
 Good  LARP has grown significantly in size since it started  Gained credibility both here and at CERN US Labs like it as a way to support work CERN.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
STATIC AND MODAL BEHAVIOUR OF THE CLIC MAIN BEAM BPM SUPPORT M. Esposito, EN-MME The research leading to these results has received funding from the European.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Summary of the technical stop activities on collimators (w17, 2012) O. Aberle – 07/05/12.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
LCWS11 WG4 Fully featured accelerating structure engineering design
Cryoplant Controls Installation
News and Introduction from CERN June 15th, 2005
Status of NA62 straw readout
Plans towards CC in the LHC a US – centric perspective
Procurement, Measurement and Installation of 2 Octupoles for ATF
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
LARP Phase II Secondary Collimator RC1
YE2 – YE3 distance Manual measurements
LHC schedule.
Review on collimator movement with stepping motors
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
Configuration Management and Layout Database ELENA Project
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Renovation of the 45-year old PS magnets
XFEL Vacuum System Commissioning
SLAC RC Status Report US LHC Accelerator Research Program
Review on collimator movement with stepping motors
Recommendations of 12/16/05 review committee & SLAC response
Planning Quality control - Manufacturing logbook Photos Conclusions
LARP Phase II Secondary Rotatable Collimator
23 April 2012 Tom Markiewicz/SLAC
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
Possible Methods for Reducing the Trapped Mode Effect in the SLAC Rotatable Collimator for the LHC Phase II Upgrade Liling Xiao 1.
Engineering Update E. Doyle 5/16/06
LARP Phase II Secondary Collimator RC-0 and RC-1
Hall C Dump Status Beam Resuscitation Review
LCLS-II Cryoplant Controls Workshop.
LCLS Personnel Protection System and Beam Containment System
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Presentation transcript:

LARP Phase II Secondary Rotatable Collimator 5 min. Status Report 1st March, 2010

Mounting first jaw (RC-0) on base plate Fake, plastic jaw Real Jaw

CMM results First Jaw (RC-1) CMM survey show flatness to well within 25 microns for majority of jaw but edges look to flair up a little. Lots of data just obtained from CMM group and not processed by us yet. Results to be documented, summarized and presented later

Oliver Aberle Visit Many useful discussions on installing our collimator into SPS Discussed: Acceptance and Interface Documents Commissioning tests and documentation Torque tests Survey and alignment Cooling tube pressure tests, etc… Details of design What we provide, what CERN provide for SPS installation Interconnections, hardware, supports, survey equipment etc… Provided 3 copies of full plan drawings Discussed drive table at great length Installed better rails Calibration and setting of limits switches, hard stops, etc… We believe we have a good mutual understanding of what will happen over the next year

Trapped Modes Numerous discussions with CERN and SLAC people on trapped modes. Have developed methods to mitigate the larger R/Q of current design. Some are very simple and already integrated Waiting on R/Q and Q budgets from CERN. See Liling Xiao’s talk later this meeting…