Structuring Nuclear Projects for Success An Analytic Framework Presented by: Didier Beutier, Vice President for Economic and Prospective Studies, Areva.

Slides:



Advertisements
Similar presentations
Project Finance & PPPs A Mechanism of Optimising Private Sector Involvement in Infrastructure Investment Public-private partnership in Ukraine: opportunities.
Advertisements

Public Private Partnerships and Development Razvojni program ujedinjenih nacija.
Leaders in the design, implementation and operation of markets for electricity, gas and water. Portfolio Generation Investment Under Uncertainty Michael.
Bank Guarantees and Indemnities 26 th August 2013 Abdul Yassim Vice President Trade and Working Capital 1 Absa presentation title Date of presentation.
The Single Electricity Market in Ireland
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.
Offshore Transmission Giles Stevens Head of offshore electricity transmission.
Antitrust/Competition Commercial Damages Environmental Litigation and Regulation Forensic Economics Intellectual Property International Arbitration International.
PARTNERSHIPS OF GOVERNMENTAL AND NON-GOVERNMENTAL ORGANIZATIONS (ASSOCIATIONS) IN THE SPHERE OF TOURISM: RUSSIAN AND FOREIGN EXPERIENCE Moscow, Russian.
Milton Caplan Dr. Terry Thompson PBNC Vancouver, August, 2014 NEW NUCLEAR PLANT DEVELOPMENT - BALANCING LOCALIZATION WITH COMPETITIVENESS.
Center for Strategic and International Studies – CCS event 31 st March 2008 Rachel Crisp Deputy Director, Cleaner Fossil Fuels Unit, Energy Group.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Simon Par Keeling, Société Générale Paris
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
Nuclear Infrastructure Development Evaluation: Perspectives from the United States Dr. Marc A. Humphrey Office of Nuclear Energy, Safety and Security U.S.
The Ecofys Reports – key arguments to support energy efficiency in buildings EU STRUCTURAL FUNDS TRAINING DAY March 06, 2006.
UNRESTRICTED Financing of Nuclear Power Ala Alizadeh Atomic Energy of Canada Limited Nuclear Infrastructure Milestones Workshop November 2007 IAEA - Vienna.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
3 November 2005 GIE Conference Gas Market Developments in SEE Balázs SÁNDOR Chairman GIE ECSEE Study Group Athens - 3 November 2005.
Structure and Financing For Change Princeton, NJ November 6, 2009 Lee Davis Vice President, Development.
Presented By Robin Tayal Impact of Spot Trading on Project Finance.
Western States Energy & Environment Symposium October 27, 2009.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Overview Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO.
Public-Private Partnerships: State of Practice and Research Needs The 14 th Annual Public Private Partnership Conference World Bank, Washington, DC September.
Reducing emissions in the power sector Didier Sire Executive Vice President Strategy at GDF SUEZ Energy Europe April 25 th, 2013.
Financing Urban Public Infrastructure
INVESTMENT AND FINANCING OF RENEWABLE ENERGY PROJECTS
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
Mike Murray Chair of EFPIA EH&S AHG MPA Conference Uppsala
Sustainable Cities and Infrastructure –––––––––––––––––––––––––––––––––––––––––––– Low Carbon Manufacturing, Technology Innovation and the Quality Standard.
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
THE NUCLEAR POWER IN ROMANIA F. Glodeanu, G. Andrei New Cooperation Strategies in the Geopolitical and Economic European Space – UE 27 Thessaloniki, June.
NUCLEAR POWER PLANT FINANCING IAEA - Infrastructure Technical Meeting Vienna, November 2007 Fanny Bazile Forecast Director Nuclear Energy Division.
Financing of Infrastructure Projects:
Solution for Future Electrical Supply in the Middle Europe Nuclear Power Ivo Kouklík
Dr. Ion LUNGU AFEER President. DRIVERS FOR INVESTMENTS Demand; Fuel availability; Market signals; Production costs; Energy mix; Environmental concerns;
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
AB209 Small Business Management Unit 2 – Getting Started: From Idea to Business Venture.
GROUP 3:Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru, IAEA consultant Reporter:
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
Regulatory Institutions in Turkey. Regulatory Institutions Central Bank of Turkey Banking Supervision and Regulatory Institutions Capital Markets Board.
:: February 2005 :: :: presentation to :: Global Water PPPs : Meeting the Challenge Richard M. Temple Hogan & Hartson One Angel Court London EC2R 7HJ Tel:
Annual Results Presentation 27 August 2009 Jacob Maroga – Chief Executive Empowering the South African dream.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
Construction of Coal-Fired Generation: Evaluating the Utility Credit Implications Ellen Lapson, Managing Director Fitch Ratings, Utilities, Power & Gas.
ENERGY FOR THE 21 ST CENTURY the Potential for Nuclear Power Luis Echávarri Director-General, OECD Nuclear Energy Agency IAEA Scientific Forum at the General.
Selected Geothermal Resource Topics from a Utility Perspective Geothermal Power Generation Workshop May 11, 2003 Ken Dragoon PacifiCorp
Vogtle Nuclear Plant Update Moderator: Honorable Greg White, Michigan Panelists: Honorable Lauren “Bubba” McDonald, Georgia Public Service Commission Buzz.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
NS4054 Fall Term 2015 North America Energy Trilemma.
A road map towards low- carbon electricity Jean-Paul Bouttes, EDF Executive Vice President Strategy, Prospective and International Affairs CCICED Beijing.
Affordable Housing Delivery by the Private Sector Lessons from elsewhere Integrated Housing Delivery CfHE 2015 Symon Sentain Symon Sentain Associates.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Infrastructure Development Corporation Limited Risk Mitigation through Project Development Focus on Safer Airplanes in addition to better Parachutes Pradeep.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
Welcome Carol Berrigan Nuclear Energy Institute July 13, 2015.
Nuclear Power Economics and Project Structuring 2017 Edition
Company Selection: Integrating sustainability criteria
Malama Chileshe Energy Economist COMESA Secretariat
The Government Role in BOT
a. Financing b. Designing c. Construction d. Operating
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Rural Partnerships between Small Farmers and Private Sector
Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO
Presentation transcript:

Structuring Nuclear Projects for Success An Analytic Framework Presented by: Didier Beutier, Vice President for Economic and Prospective Studies, Areva Milton Caplan, President, MZConsulting Inc. Co-chairs WNA Economic Working Group WNA Annual Symposium September 5, 2008

Introduction Economics of Nuclear Plants has now been demonstrated Many studies completed Documented in WNA Report The New Economics of Nuclear Power dated 2005 Next step in the nuclear renaissance is to focus on how to structure these projects to make them happen

Nuclear Project Characteristics Nuclear Project are large complex projects Capital intensive Long project schedules Complex regulatory environment Subject to extensive public scrutiny

Project Structure Utilities are generally risk averse For new nuclear projects utilities have to take –Project delivery risk –Operations risk –Financing risk Past experience with new build has been difficult Utilities want successful projects They will not risk the company on one project!

What are the Utilities Saying? we were able to negotiate a power purchase agreement with the government of XXX. They gave us a very significant cost-sharing for capital cost overruns in the project, and that was very important to us And youll have to determine whether youre willing to pay the price for certainty (from the vendor) we would not make the long-term commitment until we got to a point with the NRC where we were highly confident we were going to have the license theres a lot of financial risk that needs to be managed. And you have to have very, very confident recovery methods to preserve your credit… I think it is more of a negotiated deal - its more moving forward together, understanding the risks very clearly, as opposed to one side pointing fingers at the other side (working with the regulator)

Structuring Nuclear Projects for Success

Outline of Report Risks Project Structuring Financing Role for Government

Nuclear Project Risk Matrix

Risks Regulatory –Safety is paramount –Investors need predictability –Stability in regulatory process is vital –Public interest is served by regulatory certainty and smooth procedures Project Delivery –Design –Equipment supply –Project management –Construction –Commissioning –Standardized design reduce risks

Risks Operations –Technology issues –Staffing issues –Management issues –Global fleet is operating extremely well –Increased staff training –Sharing of information (WANO/INPO) Decommissioning –Potentially open ended liability –Rules set by government –Norm is for funds to be set up to cover Electricity Generation and Carbon Pricing –Need a market for the output –Nuclear operates as base load –Can be regulated or in non-regulated environment –Carbon pricing is likely to apply –Need market assurance

Project Structuring: beyond the basics…

…to the key: risk control and allocation Prime participants –Government, in charge of energy policy and regulatory framework –Electricity customers, wanting electricity at a competitive price –Utility, ultimately responsible for the complete project achievement –EPC contractor, responsible for delivery according to budget and schedule –Vendors, responsible for equipment supply –Safety Authority, protecting public safety and the environment Total project cost and risk of failure will be minimised if each kind of risk along project development is allocated to the most capable party with equitable reward sharing prospect

Phase 1 Development Risk categoryRisk Control Examples Technical Internationally-accepted designs Building on existing nuclear sites Business Case Build business case on various demand scenarios Seek investment from major power users Societal and Political Public debates and hearings Gaining cross party political support Emphasize environmental advantages of nuclear Develop waste management policy with government Government and Utility at the forefront

Phase 2 Construction Risk categoryRisk Control Examples Technical Develop sound contractual arrangements for involved parties Invest in supply chain infrastructure Invest in transport infrastructure near the site Previous construction experience Strong project management Business Case Stick to standardized designs Use good mix of permanent and contract staff Societal and Political Public debates and hearings Utility, contractor and vendor at the forefront

The Role of Government: framing, ruling and enabling Long Term Energy Policy: combining security of supply, environmental protection and competitiveness Electricity Market Design: aiming at reliable and cost efficient supply, encouraging long-term investment Climate Change Policy: penalizing carbon emissions Licensing and Local Planning System: towards predictable, streamlined processes Nuclear Liability: legal framework defining the respective insurance responsibilities Safety Regulation of Operations Radioactive Waste Management and Used Fuel Management: deciding radwaste disposal policy, used fuel recycling or not Decommissioning: regulating and enforcing timely funding by plant operators

Market/Ownership Model : quite different situations resulting in diverse exposure to risk Regulated utility –Monopolistic, low market risk –Cost-of-service rate regulation –Unexpected costs, once authorized, can be passed onto customers Merchant plant –No direct outlet to end-user customer –High price risk in liberalized competitive markets Hybrid –Oligopolistic market –Vertically integrated companies, combining generation and direct supply outlet to market –Large asset base

Influence on Project Finance Regulated utility –High security for investors and lenders, lower WACC value (5%) Merchant plant –High risk to be rewarded: high WACC value (11%) –Request for low debt/equity ratio in project financing –Mitigated by US 2005 Energy Act Hybrid –Capacity to finance heavy investments on balance sheet –High credit rating –Moderate WACC value (8%)

Examples of financing routes for on-going nuclear projects Regulated utility –Vogtle 3-4 in Georgia (USA) Merchant Plant with project financing –South Texas Project 3–4 in the USA Hybrid: Balance sheet financing by large utility groups –e.g. Flamanville 3 in France Public-private Joint Venture –Cernavoda 3-4 in Romania Power user investment –e.g. Olkiluoto 3 in Finland

Conclusion Nuclear power plants have unique characteristics –Capital intensive and long schedules –Relatively low and stable operating costs To successfully implement new build nuclear projects requires attention to the project structure Risks must be allocated to the stakeholder in an equitable fashion that encourages each stakeholder to fulfil its responsibilities Government has an important role to play to create the appropriate framework for success