Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Advertisements

Mod 0273: 1 st Development Group Workshop 4 th February 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
Sunday, 04 October 2015 UNC Mod Action WG0505: Provide for discussion/development the potential categories of connection offer and associated timescales.
Mod 0273: 3 rd Development Group Workshop 4 th March 2010.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
UNC modification proposal 0407 : Standardisation of notice periods for offtake rate changes for all National Grid NTS Exit Users Transmission Workstream.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Mod 0273: Governance of Feasibility Study Requests to Support Changes to Network Exit Agreements – National Grid NTS Response.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Category Connection criteria Application for a new Minimum NTS Offtake Connection (exit) in a green-field site Application for any other category of new.
Review Group -140 Thoughts on additional information requirements.
Industry Dialogue on xoserve Services 14 th September 2007.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
IGT and Shipper Workgroup meeting 28 th February 2011.
1 Capacity and Congestion Management Duties of TSOs - Availability of infrastructure and capacities for shippers to fulfil their supply obligations - Guarantee.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Self-Generation Incentive Program (SGIP)
Background Current balance of LDZ System and Customer charges
Transmission Workstream 6 January 2011
CUSC Panel – 19th July 2016 Binoy dharsi
Wales & West Utilities Entry – Standard Special Condition D12
Transmission Pricing Options
Transitional Exit Capacity Proposals -Update
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
User Pays Funding – Potential Licence Mechanism
Grid Code Development Forum – 6 September 2017
Code Governance Review UNC Modification Proposals
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
Change Assurance Dashboard
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
UNC Modification Proposal 0373
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Chris Warner Network Code Manager
Amendment to NEA & NExA Measurement Provisions Change Process
Publication of Historical Gas Operational Data by National Grid NTS
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
Potential Alternative Proposal – Interaction with Electricity Capacity Market 23 January 2018.
DSR Volumetrics Workgroup 3 10 September 2014.
Cost Allocation review – CoMC update August 18
Joint Office Presentation for Modification 0678
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Review Group 166 End User Perspectives 20 September 2007 Julie Cox.
Flow Swaps at NTS / LDZ offtakes
MOD Deemed applications – User pays initial thoughts.
Proposed Transitional Gas Exit Arrangements
Richard Fairholme E.ON UK
Richard Fairholme Transmission Workstream 4th September 2008
Reinstatement of NTS Interruption
Richard Fairholme E.ON UK
Offtake Workstream : 19 March 2012
195AV “Future work” – system flexibility
Commercial Arrangements For Gas Quality Service – Introduction
Proposed Changes to UNC Section Q Emergencies - Mod 035
Transmission Workstream 05 November 2009
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

Richard Fairholme, E.ON UK Modification Proposal 0273 – “Governance of Feasibility Study Requests to Support Changes to Network Exit Agreements” Richard Fairholme, E.ON UK

What does the Modification Proposal cover? “Feasibility” / engineering studies conducted by Transporter to analyse impact of request by Shipper to changes to, or application for, a Network Exit Agreement (NExA) (e.g. increase to ramp rate / max. gas offtake rate). Shippers request (and fund) such studies from National Grid NTS / DNs. Can only move to formally agreeing (change to) NExA once engineering study process complete.

The Current Feasibility Study “Headache” How much will it cost? How long will it take? Delays bringing on new generation plant or capability Delays in meeting increased I&C customer gas demand Delays in bringing gas storage to market How many studies will I need?

Purpose of the Proposal Place reasonable time limits on the time taken by Transporters to deal with requests and complete studies. Ensure prices that Shippers pay for feasibility studies are cost-reflective Ensure expectations of both Shippers and the Transporters are clear from the outset Standardise the application process

What is Proposed? To support NExA applications / modification applications, it is proposed that: A standard application form to be used for submitting requests by Shippers. A standard set of terms and conditions where studies required to be made available by the Transporter(s). Fixed (or variable) costs for different categories of applications - varying according to size, type and location of project. Study supporting NExA change application to be completed within 3 months. If required, any additional studies to be completed within a further 3 months (i.e. a maximum of 6 months in total). Expected to apply to both National Grid NTS and the Gas Distribution Network Operators (above 7 barg connections).

What is NOT Proposed? Any amendment to existing “Siteworks” process for connections to DNs. - Covers connections less than 7 barg.

Benefits for Shippers of this Proposed New Process Less time spent negotiating with the Transporter. Able to bring projects to the market more quickly. Better able to plan projects & able to make more efficient decisions. Similarity to CUSC arrangements in electricity should make process easier to understand (particularly for new entrants). Ensures all Shippers are treated equally. Overall, less Shipper FTE requirement for progressing NExA applications / modification applications.

Any Questions / Comments?