“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Gas Balancing Alert Transmission Workstream – Oct 2005 Ritchard Hewitt.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Information provision for winter 09/10 Jenny Phillips – GNCC Strategy & Support Manager.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Mark Dalton 4 February 2010 Transmission Workstream Discussion slides.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Transmission Workstream 7th Dec 2006 Chris Logue
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Proposer: Matthew Hatch Panel Date: 20/10/16
Review of Demand Estimation Times for Modification Proposal 461
Review of System Alerts
Transmission Planning Code – Draft Document
System information provision
Transmission Workgroup 7th July 2011
Review of UNC Section Q “Emergencies”
UNC Modifications 061 & 062 – An Overview
Transmission Planning Code
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
Gas SO Incentives from April 2010
Proposer: National Grid NTS Panel Date: 17th April 2014
NTS Entry Charging Review Update
Annual Review - Methodology Statements
Exit Capacity Substitution and Revision
Gas Security of Supply SCR Proposals: Credit Implications for the GB Gas Market Introducing a new Transmission Workgroup Topic 4 October 2012.
Consideration of issues raised by UNC Modification Proposal 0244
Potential Alternative Proposal – Interaction with Electricity Capacity Market 23 January 2018.
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Development of Firm Monitor & GBA
Rebecca Hailes For 15 March 2018
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Development of Entry Capacity Substitution
Transmission Workgroup 6th March 2014
UNC Modification Proposal 0172 National Grid Distribution
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Transmission Planning Code Review
Review Group 0175: DM Supply Point Emergency Arrangements
Long Term Non Firm Capacity Update
Interruptible to Firm – NTS Supply Point Transition
DSR Workgroup 10 September
UNC Transmission Workstream 15th June 2005
Consideration of issues raised by UNC Modification Proposal 0244
CUSC “Alternate” Proposal process
Options for the Development of a Demand Side Response Mechanism
Reinstatement of NTS Interruption
Proposer: Debbie Brace Panel Date: 20th March 2014
Generic Revenue Driver Methodology
Open Letter - Summary of Responses
Review: Entry Capacity Transfer and Trade Methodology Statement
Gemini Code Contingency Review
195AV “Future work” – system flexibility
Commercial Arrangements For Gas Quality Service – Introduction
Implementation Approach Distribution Workgroup – June 2014
Proposed Changes to UNC Section Q Emergencies - Mod 035
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Capacity Access Review
Presentation transcript:

Review of System Alerts Transmission Workgroup 7th July 2011

Background GBA has been in place for 5 years Time to review current arrangements Builds on discussions had in the SCR workgroups, focused on Gas Deficit Emergency arrangements. Focus is on providing information to the market

What Is a Gas Balancing Alert (GBA)? National Grid have a UNC obligation to notify system users of a potential ‘significant’ end of day (EOD) supply / demand imbalance A GBA may be issued either day ahead or within day Or Aimed at prompting a market response to supply or demand

Day ahead GBA UNC describes the day ahead process as D-1 forecast demand being >= forecast total system supply. The D-1 GBA Trigger Level is based on typical supply levels and forecast demand. Consider: Reviewing name (change from a GBA) Clarifying assessment methodology Introducing the ability for NGG to recall What market response is expected?

Within Day GBA Consider: Market response versus SO action Introducing the ability to for NGG to recall Developing ability to signal a within day issue as well as EOD issue Information requirements From SO From industry Market response versus SO action

Next Steps… Work with the industry to develop proposals July Panel – request a review of the GBA process through the Request procedures National Grid to submit proposal/s in line with the review group conclusions.