Wellborn Underpass Update

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
14th Ave. S. at the South Park Bridge
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING March 5, 2014|3:00PM -5:00PM | ROOM 1E-113.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Electric Ductbank Project – Completed January 2010 New Brick Paver Sidewalk and Concrete Curb.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
2 Existing building 1 story metal 1972 Water Street CFA TechWorks! - Site Plan - Photo Index Number indicates photographer location Caption describes.
Update of Downtown Rail Improvements DFWI & Chamber Stakeholders February 26, 2014 Alonzo Liñán, PE, PTOE City of Fort Worth.
City/University Projects Fund Calendar Year 2012 Budget Request.
STREETSCAPE DESIGN REPORT: SOUTH HOLGATE STREET TO SOUTH KING STREET | ROMA DESIGN GROUP Project Update Seattle Design Commission April 3, 2008.
U-M Construction Forecast; April 2013 U-M Construction Forecast Spring – Fall 2013 As of April 25, 2013 Prepared by AEC Preliminary & Advisory.
Yorktown Civic Association Neighborhood Conservation Plan Update March 2006.
CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.
Organics Waste Processing Facility Construction Progress Update January 17, 2011.
Noise analysis- operations 6 ft. panel on west side of guide way 4 ft. panel on east side of guide way.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
Cycle Path Diversion Strategy Catford Stadium Barratt London Aldgate Author P.Willisr.
Comparative Resources, North and South, Comparative Transportation Systems, of 3.
DCCCD Brookhaven College City Council Presentation October 16, 2007.
STATION 1 THE AMERICAN SYSTEM. CLAY’S DREAM IS TO CREATE A UNIFIED NATION! Nationalism- Create a canal and road system to connect the west to the east.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
Fendering Update The following activities are anticipated over the next quarter: Review of alternate designs for fendering Meet key stakeholders and regulatory.
Shepherd University WV Route 480 Pedestrian Underpass August 3, 2011.
Winchester Medical Center Campus Expansion June 21, 2011.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Planning and Community Development Department Sierra Madre Villa Corridor Public Art Project City Council December 8, 2014.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Middle School Expansion August 11, Brick going up on north side next to classrooms.
HALL HIGH SCHOOL NEW SCHOOL PROJECT MARCH 28. Main entrance & cafeteria windows Main entrance.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
1 Eagle P3 Project Update FasTracks Monitoring Committee Dec. 2, 2014.
City of Prairie Village 75 th Street Mission Road to State Line Road.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Upper Middle Road Grade Separation Construction Project Status Update February 2009.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
San Marcos Landfill 1595 Questhaven Rd. San Marcos, CA AA-0008 Photos by Anthony Torres Page 1 of 3 October 3, 2012 The gravel bags leading to.
Directions to 2nd Street Gate
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Pilot Project Evaluation
Principles of a Grid Reference
Expressway update Infrastructure Committee, Waikato District Council
UL Stadium - Student Parking walk on S. Floyd St
February 12 – 19, 2018.
INDOOR BASEBALL / SOFTBALL FACILITY
Transportation Projects
Highway 169 Bridge Replacement & Pavement Resurfacing
Airport Air Quality Study Update
Thatch House (Plan) Fig.4.
Steam Plant Rehabilitation Building and Smokestack
Frames of reference and motion
August 28, 2018.
INFRASTRUCTURE RENEWAL AT NEW YORK PENN STATION
Lancaster Castle and church from the bridge, 2002.
北 N north 西 W west 東 E east south南 S.
SHERINGTON NEIGHBOURHOOD PLAN
February 14, 2019.
March 14, 2019.
Minuteman Vocational Technical Regional High School Progress
Harbour Island Force Main Replacement
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Avera St. Luke’s Therapy Addition January 2012 Update
115-Unit Mixed-Use Project (711 E
May 9, 2019.
UNITS OF TIME QUESTIONS.
Warm Up What is a continent? (look in your notes)
Presentation transcript:

Wellborn Underpass Update Transportation Services Advisory Committee March 6, 2013

Aerial View – February 2013 The RR structure is complete, only waterproofing and final ballast required

View Looking East from West Campus The last half of the Wellborn bridges will be poured this week

View looking Southwest from Main Campus

View Looking South along Wellborn Road The cantilever wall is being put in place which divides the pedestrian sidewalk from the vehicular underpass, on right of photo. The panel façade is being installed along the Old Main retaining wall. Brick will be installed as early as this month.  

Questions?