Draft procedure for ENC overlaps (IRCC6-08b)

Slides:



Advertisements
Similar presentations
IHB Report on IRCC-2HSSC-2. IRCC-2 Establish, coordinate and enhance cooperation in hydrographic activities amongst States on a regional basis, and between.
Advertisements

IHO INTER-REGIONAL COORDINATION COMMITTEE IRCC-6 Agenda item 10 Input from HSSC-5 IHB.
March Eliminating ENC Overlaps USCHC Case Study WENDWG5 – Agenda Item WWG5-05B.
SEVENTH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE INTER-REGIONAL COORDINATION COMMITTEE (IRCC7) WEND WG REPORT.
MACHC WENDWG 4 4 rd Meeting held March 18-19, 2014 Highlights Review of WEND principles and governance ENC Issues (Gaps and Overlaps) WEND Database.
SEVENTH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE INTER-REGIONAL COORDINATION COMMITTEE (IRCC7) ANNUAL REPORT 2014.
Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.
MACHC WENDWG 5 4 rd Meeting held March 3-5, 2015 Overlay Services (AIO) Update report on the study for overlapping ENCs Review of the WEND Principles.
IHO INTER-REGIONAL COORDINATION COMMITTEE IRCC-8 Agenda item 8 Input from HSSC-7 IHB.
Worldwide ENC Database Working Group
9TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Captain Fernando Angli Rodrideguez, Chair
9th MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Agenda Item SWPHC : Marine Spatial Data Infrastructure (MSDI)
Using Seven Reader-Centered Patterns for Organizing
NORDIC HYDROGRAPHIC COMMISSION (NHC)
Standards” and by the Council key Priorities
Report on IRCC9 Key Issues Relating to EAHC
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
International Centre for Electronic Navigational Charts
10th MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
IRCC work is guided by the IHO Work Programme 3
REPORT AND PROPOSALS FROM IRCC Reference Doc: C2-4.2A
Development and future provision of S-100 based Products
Nick Bonvoisin Secretary to the Convention on the
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
8TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Overlapping ENC data: IC-ENC Policy and progress IC-ENC Chairman – Capt Marc Van Der Donck IRCC9, June 2017.
Lecturers: OLGA LUCIA BONFANTE LOZADA PhD (c)
Add Commission and date Sept 17, 2018
IRCC 10 Outcomes Complete IRCC report available on the IHO website
BRIEF SUMMARY OF THOSE ITEMS FROM THE 2nd MEETING OF THE IHO COUNCIL
SC Budget/Commercial/C PAC Budget/Commercial/C
Worldwide ENC Database Working Group (WENDWG) Report
Arctic Regional Hydrographic Commission
WORLDWIDE ENC DATABASE WORKING GROUP
Arctic Regional Hydrographic Commission 8th Conference
France Application of the IHO Resolution 1/2018 Comment on IRCC report
Proposal on MIO and AIO NHC
MesoAmerican and Caribbean Sea Hydrographic Commission
WEND Update.
FISHERIES AND ENVIRONMENT
Agenda item 4 Self-assessment Reports by INT Charts/ENC Coordinators
MesoAmerican and Caribbean Sea Hydrographic Commission
SWPHC – 27 February 2015 Rarotonga, Cook Islands ---
Report from the 7th Meeting of the IHO Hydrographic Services and Standards Committee (HSSC7) to NCWG April 2016, IHB, Monaco.
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
Worldwide ENC Database Working Group (WENDWG) SWPHC16 Update
Operation of the Organization under IHO Convention and its supporting Basic Documents
IRCC work is guided by the IHO Work Programme 3
Agenda item 4 Self-assessment Reports by INT Charts/ENC Coordinators
IRCC-8 Agenda item 10 Update on the development of the IHO GIS IHB
Hydrographic Services and Standards Committee
4.1 Overlapping issues ENC Coverage
Workshop for Regional INT Charts / ENC Coordinators
Hydrographic Services and Standards Committee
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
WENDWG – WENSWG Progress Report
NORDIC HYDROGRAPHIC COMMISSION (NHC)
Region F ICCWG Report to MBSHC Montenegro – Wednesday 5 July 2017
Dr. Mathias JONAS, Secretary-General (IHO Secretariat)
MBSHC-21, Cadiz, Spain (11-13 June 2019)
Marine Strategy Framework Directive reporting: progress and next steps
11th MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Dr. Mathias JONAS, Secretary-General (IHO Secretariat)
North Sea Hydrographic Commission report to IRCC11
Report and Proposal from IRCC
Report and Proposal from IRCC
Presentation transcript:

Draft procedure for ENC overlaps (IRCC6-08b)

Draft procedure for ENC overlaps: A draft procedure to deal with overlaps after a ENC has been issued has been developed by the WENDWG Task Group and approved in its principles at WENDWG4. Today, it is limited to overlap issues, but, in the future, could be extended to other significant issues for mariners using ECDIS. The WENDWG has decided to investigate the possibility of taking up a pilot project to identify technical possible solutions for addressing overlapping issues in ECDIS. Lessons learned will be included in the procedure, if deemed necessary.

Draft procedure for ENC overlaps: IRCC is invited: to discuss and agree on the procedure to develop appropriate recommendations to take any other action as deemed necessary When implemented, periodic revision will be included in the WENDWG PoW

Draft procedure for ENC overlaps: 1. Criteria for assessing the risks: Geographical location and shipping density Size of the overlapping area Scale of the overlapping cells Shipping route patterns Differences in the overlapping data

Draft procedure for ENC overlaps: 2. Initial procedures for addressing the risks at the ENC producer MS level: Within its own coverage: should crop the cells Between producers: should take the initiative in discussing arrangements for cropping either or both cells Where eliminating overlaps is not possible: should examine the data with a view to ensuring, wherever possible, it’s the same. (Criteria for assessing the risk should be taken in account to define priorities) should align their updating regime in the overlapping area. Agreeing an exchange of data may be helpful to facilitate the cropping or comparison

Draft procedure for ENC overlaps: 3. Following procedures at the RHC level: The assessment of what may be navigationally significant should be guided by the best practices in this regard, acknowledged and approved, on a proposal by the WENDWG, by the IRCC. The RHC may seek the assistance of a Regional ENC Coordination Centre (RENC) to assist in the implementation of this risk assessment and should take a proactive approach with the ENC Producer MS, to resolve overlap issues within the region. (Source ref: Guidelines for the implementation of the WEND principles, §1.7)

Draft procedure for ENC overlaps: 3. Following procedures at the RHC level: To support this task, the RENC should use the following procedures: 1. On all new cells delivered and distributed through a RENC, an overlap check is to be performed (by the RENC). 2. An overview and assessment of the discovered overlap will be sent, by RENC, to the ENC producer MS or RENC. The release process will then be decided among the ENC Producer MS and the relevant RENC but it is expected that resolution of any such overlap should be done, when identified by a RENC, and before the new ENCs are released. It is also assumed that there should be no overlapping data by a MS with its own data. 3. In the cases where overlap is discovered from HOs who are non- RENC member nations, a standard text (provided in the procedure) can then be used in an email communication.

Draft procedure for ENC overlaps: 3. Following procedures at the RHC level: To support this task, the RENC should use the following procedures: 4. In accordance with §1.7.2 of the “Guidelines for the implementation of the WEND Principles”, RENC to inform the RHC Chair about the overlap discovered, and IHB. 5. ENC Producer MS should always confirm that they have received information about overlap issues. If possible, the RENC should be informed about plans for removing overlap. In accordance with §1.7.2 and 1.7.3 of the “Guidelines for the implementation of the WEND Principles”, and if agreed by the RHCs’ Chair, the RENC should inform directly the ENC Producer MS, the RHC Chair, the IRCC Chair, the IHB, if the overlap is not solved within 6 months.