Test Flow: Acceptance & defect criteria The First half RUP summary This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during your presentation In Slide Show, click on the right mouse button Select “Meeting Minder” Select the “Action Items” tab Type in action items as they come up Click OK to dismiss this box This will automatically create an Action Item slide at the end of your presentation with your points entered. Test Flow: Acceptance & defect criteria The First half RUP summary Box Leangsuksun Fall 2002 : CSC 532
How to make decision: Readiness of your project Requirement & Test Plan Objective and Criteria Entrance Criteria Exit Criteria Quality Model and Measurement (Software Metrics)
Failure/Defect Severity Classification—System Example by Capability Impact excerpted from Musa 1998 book Class System capability impact 1 Basic service interruption 2 Basic service degradation 3 Inconvenience, correction not deferrable 4 Minor tolerable effects, correction deferrable
Acceptance Chart by FIO
RUP First half summary Source: P. Kruchte, What is the RUP? http://www.therationaledge.com/content/jan_01/f_rup_pk.html