Mechanical/Thermal Systems

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
Advertisements

© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
GLAST LAT ProjectLAT Mgr’s Meeting LAT Planning Meeting Mechanical/Thermal Systems March 17, 2005 Marc Campell.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
NRL Pathfinder Planning Meeting1 GLAST LAT Project07 September 2005 NRL Pathfinder Planning Meeting Dynamics Testing Update NRL Pathfinder Planning Meeting.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST Calorimeter Monthly Cost / Schedule / Mission April 2004 Naval Research Lab Washington DC wnjohnson 1 Monthly Cost/Schedule/Mission Review GLAST.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.3 Fab & Assy Plans 1 GLAST Large Area Telescope:
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
Mechanical Integration
Environmental Test Planning
0.0 Instrument Suite Name Presenter’s name
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
2K CB FDR Overview:  Agenda, Charge, Review Process
GLAST LAT System Engineering
GLAST Large Area Telescope:
GLAST LAT System Engineering
LAT Pre-Environmental Test Plan
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
Design Integration and Analysis
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope:
Environmental Test Planning Meeting
GLAST Large Area Telescope
LAT Environmental Test Planning and Design Review
Introduction and Overview
Design Integration and Analysis
GLAST Large Area Telescope:
Presentation transcript:

Mechanical/Thermal Systems LAT Planning Meeting Mechanical/Thermal Systems June 15, 2005 Marc Campell

Status SLAC Grid 2 is in inspection at Tapemation Delivery to SLAC ECD: 7/1/05 Static Load Test awarded to National Test Systems (NTS), Santa Clarita, CA LAT Transporter RFQ issued 6/13/05 Continue investigation of refurbishing NRL container

Grid 2 Machining complete

Status (cont) Lockheed Martin - X-LAT Completed X-LAT thermal cycling test Key is to demonstrate that there is no change in the X-LAT heat pipe bonds before and after the test. Ultrasonic inspection used to map disbonds Pre and post-test results 12 changes most approximately +/-0.1” (probe is .12” dia) 3 significant changes on heat pipe 0 .3 x 1.2 to .3 x1 .7 .3 x 1.2 to .3 x 1.7 .3 x .25 to .3 x 1.2 8 new one areas ~.2 x .2” Total disbonded area still within limits Next steps Proceed with Weight and CG measurements Re-measure this heat pipe 0 Need to return to MRB with final results summary and recommendation

Status (cont) Lockheed Martin - Radiators Fabrication of both Radiator panel is complete less instrumentation installation. ECD 6/24 MLI design finalized (interfacing velcro locations) LM SCD to be revised Environmental test preps moving forward Vibration testing Acoustic and Sine vibe fixtures complete TRR held 6/14 9 action items – key ones are need more details from pre-test analysis and additional details into procedure Acoustic facility is being repaired (ECD 6/24) SBIRS still on Vibe table (ECD 6/24) Delta TRR to be held upon closure of action items, flight hardware complete and procedure released

Status (cont) Lockheed Martin – Radiators cont. Thermal Vacuum testing Thermal vacuum test plan in review Test fixture design 90% complete MLI test blankets available SLAC provided EGSE console is 90% complete ATP for console in review

MECH Milestones

Threats to RFI LM X-LAT & Radiator delivery have no float. X-LAT Conclusive story on disbonds Radiator Potential cost over runs in testing Vibration/Acoustic tests Instrumentation requirements to qualify Radiator interface Final test plan for thermal vacuum. Lots of test prep work to go here Timely resolution of test anomalies. Pre-ship reviews Closing all of the paperwork