Modification Proposal 0192 – Draft Business Rules.

Slides:



Advertisements
Similar presentations
DRAFT Shipperless and Unregistered sites 3 November 2010.
Advertisements

Third Energy Package for Change of Supplier 2009/73/EC.
Application of User Pays Principles to Existing Service Lines 22nd November 2006.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
ISDA ® The New CDS Landscape Auction Settlement International Swaps and Derivatives Association, Inc. ISDA ® Copyright © 2009 International Swaps and Derivatives.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
18th May 2009 energynetworks.org 1 A PRESENTATION BY ERIKA MELÉN OF THE ENERGY NETWORKS ASSOCIATION Report from the ENA/ERA Theft of Energy Working group.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0192 National Grid Distribution Proposal 0182: “ Introduction of DNO obligations to facilitate resolution of unresolved USRVs”
Industry Dialogue on xoserve Services 14 th September 2007.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
SoS Report PAC – 13th December 2016.
User Pays User Committee 12th November 2013
David Addison / Steve Deery
Supply Point Register 7th December 2011
Supply Point Register 10th January 2012
Supply Point Enquiry Service
UNC Modification Proposal 0202 National Grid Distribution
Transmission Workstream 4th July 2007
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
UNC Modification 0663S Extending the data comprised under the definition of Supply Point Premises Data (TPD V5.18.1) and iUNC Modification 114 Extending.
Incentives 26 September 2018.
Connected System Exit Points Administration Options
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Chris Warner Network Code Manager
The Necessary Criteria for a UNC Modification Proposal
Chris Warner UNC Modification Panel 21 December 2017
Connected System Exit Points Administration Options
Transmission Workgroup 6th March 2014
Credit Modification Proposals Update
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Long Term Non Firm Capacity Update
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
Proposed Transitional Gas Exit Arrangements
Further Credit Modification Proposals
UK Link Replacement Programme additional supporting UNC modifications
Deferral of Retrospective Updates Functionality
Ofgem presentation to Gas Transmission Workstream
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
Information Provision for Transitional Exit Capacity
DNO Obligations to Facilitate Resolution of Unresolved USRVs
DN Interruption Phase II
Development Work Group 0209 Straw Man Update
Implementation Approach Distribution Workgroup – June 2014
Meter Read Rejections ..
Dis 1208: Mod The ability and requirement for Users and Transporters to raise issues to be considered by the Allocation of Unidentified Gas Expert.
Transmission Workstream 05 November 2009
Retail Energy Code - Data Access Schedule
Erika Melén, Senior Settlements Analyst Modification Proposal 141a
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Presentation transcript:

Modification Proposal 0192 – Draft Business Rules. Alison Chamberlain National Grid Distribution

Modification Proposal 0192 – Draft Business Rules. A ‘backstop’ period of 30 months would be applied. This would be from the date of the creation i.e. after the expiry of 30 months from the date of the creation of the USRV the DNO would assume responsibility for the resolution of the USRV. The User would still have the ability to resolve the USRV until such time as the DNO’s agent loads the resolution to the UK Link System. At the point when the DNO assumes responsibility for resolution the service would become chargeable; Resolution can occur without the need for the User to submit an RGMA flow although advice would be passed on to the User where there is a need to update asset information to avoid further USRVs. a ‘reasonable endeavours’ provision would be incorporated under which the DNO would be required to resolve a USRV. This means that the DNO would use reasonable endeavours to resolve the USRV using conventional methods/calculations and in the event that this is not possible, at the DNO’s discretion, a zero Reconciliation would be applied as resolution; The current User should provide any additional information (in their possession) which is reasonably required by the DNO’s agent e.g. Meter Readings. The current User should also facilitate access to the customer’s premises where requested for the purposes of enabling DNOs to obtain Meter Readings and Meter Information. The Reconciliation Quantity determined by the DNO would be binding on both parties.

Associated/Linked USRV Rules With effect from the 30th USRV Month after the User Suppressed Reconciliation Date (see E 8.3) the Transporter would take on responsibility to investigate and resolve the USRV using reasonable endeavours - this would include all liable items and non liable linked items. This may result in the Transporter resolving a liable item that has not yet reached 30 USRV months where it has associated linked items. Where a USRV is created and the meter reading period is longer than 30 months and where there are no linked items, the User shall remain responsible for resolution of the USRV, even if the start read of the meter reading period is approaching or past the “close out” date. If the USRV remains unresolved after 30 USRV months the above rules will apply.

Application to Multiple & Aged USRVs Mod 0728 – Ofgem rejected on the basis that movement of obligations did not facilitate the relevant objectives of the code (as defined in the GT licence). Ofgem drew analogy with the Interruptible contacts regime recognising that the quality of this information is good due to the incentives (penalties for failure to interrupt etc) and encouraged consideration of incentivisation of the provision of emergency contact info. Credit Mod Proposals – 9 in all (5 Transco, 4 User). Covers unsecured credit, third party provided cover, penalties for non payment and non rectification of credit position following downgrade, invoice amount set off, calculation of value at risk (code credit limit) Primes and Subs – National Grid position communicated externally re: ownership of downstream network. Ofgem acknowledge but ask Transco to evaluate options to enable User to withdraw from Primary Meter with no load. UKD Representation to Transmission Mods – (AR to add speaker note). Provision of Interruption information (DNs > UKT) Extension of sunset clauses (following delay to commencement of enduring regime) Emergency Cash Out SPAA – potential transfer of certain Supply Point related activities from UNC to SPAA, concerns over dual governance, I&C suppliers not signed on to SPAA etc. UNC Development Forum – monthly meetings held (from Aug 2005) to discuss gameplans for UNC change from a UKD perspective.