PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.

Slides:



Advertisements
Similar presentations
14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Advertisements

Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
James Robnett EVLA M&C Hardware PDR March EVLA M&C Hardware PDR Voice Communications.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES CRITICAL DESIGN REVIEW.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
S. SrikanthEVLA Feed/FE PDR February 12-13, 2002 EVLA FEEDS DESIGN S. Srikanth NRAO/Charlottesville.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Bill SahrNSF Review May , EVLA Monitor & Control.
Planning of the EUSO-BALLOON project Sylvie Dagoret-Campagne on behalf of the JEM-EUSO collaboration, EUSO-BALLOON project manager LAL/France EUSO BALLOON.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
EVLA Availability - or - When Can I Use It?
EVLA Project Peter Napier
Choice of Cassegrain Geometry
Committee Charge Fred K.Y. Lo
Correlator Installation Plans
Monitor and Control Software
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA – Polarizers for X, Ku, K and Ka Bands
EVLA NSF Mid-Project Review System / Antenna Status
Obs2script Bryan Butler.
Water Vapor Radiometer
Budget, Schedule, Contingency
EVLA System PDR System Overview
Software Requirements
Rick Perley National Radio Astronomy Observatory
EVLA M/C Software PDR, 14 May 2002
VLA to EVLA Transition Plan
EVLA Receivers PDR Transition Planning Author Daniel (Mert) Mertely
EVLA Advisory Committee Meeting
Science Commissioning
EVLA Advisory Committee Meeting System Status
Software Requirements
Charge to the Review Panel
EVLA Monitor & Control System
Gustaaf van Moorsel September 9, 2003
Software Requirements
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA M&C Components Observation Executor, Interim & Final Obs2script
Correlator Growth Path
EVLA Construction Status
Transition Observing and Science
Presentation transcript:

PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem complete and adequate? Have the correct design solutions been selected for study and development during the EVLA Design Phase? Are there important alternate solutions that are not being studied. Has an adequate procurement plan been identified for the subsystem? P.Napier EVLA Feed/FE PDR, 12 Feb 2002

Project Schedule Install prototype EVLA system on EVLA Test Antenna(s) Q2 2003 Start EVLA electronics production Q4 2003 Start retrofitting 7 antennas/year with new electronics system Q2 2004 Start observing in “transition” mode Q2 2004 Test of prototype correlator on 3 or 4 antennas Q4 2005 Start outfitting new correlator room Q2 2006 Start tests of first correlator subset at VLA Q4 2006 First “shared-risk” science with new correlator subset Q2 2007 Last antenna retrofitted to EVLA design Q1 2008 New correlator declared “operational” Q1 2009 Last EVLA receiver installed Q1 2010 P.Napier EVLA Feed/FE PDR, 12 Feb 2002