Application of a global probabilistic hydrologic forecast system to the Ohio River Basin Nathalie Voisin1, Florian Pappenberger2, Dennis Lettenmaier1,

Slides:



Advertisements
Similar presentations
Medium-range Ensemble Streamflow forecast over France F. Rousset-Regimbeau (1), J. Noilhan (2), G. Thirel (2), E. Martin (2) and F. Habets (3) 1 : Direction.
Advertisements

1 Verification Continued… Holly C. Hartmann Department of Hydrology and Water Resources University of Arizona RFC Verification Workshop,
Details for Today: DATE:3 rd February 2005 BY:Mark Cresswell FOLLOWED BY:Assignment 2 briefing Evaluation of Model Performance 69EG3137 – Impacts & Models.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Improving COSMO-LEPS forecasts of extreme events with.
Experimental Real-time Seasonal Hydrologic Forecasting Andrew Wood Dennis Lettenmaier University of Washington Arun Kumar NCEP/EMC/CMB presented: JISAO.
Alan F. Hamlet Andy Wood Seethu Babu Marketa McGuire Dennis P. Lettenmaier JISAO Climate Impacts Group and the Department of Civil Engineering University.
Ensemble Post-Processing and it’s Potential Benefits for the Operational Forecaster Michael Erickson and Brian A. Colle School of Marine and Atmospheric.
Global Flood and Drought Prediction Nathalie Voisin and Dennis P. Lettenmaier Department of Civil and Environmental Engineering University of Washington.
Experimental seasonal hydrologic forecasting for the Western U.S. Dennis P. Lettenmaier Andrew W. Wood, Alan F. Hamlet Climate Impacts Group University.
Tutorial. Other post-processing approaches … 1) Bayesian Model Averaging (BMA) – Raftery et al (1997) 2) Analogue approaches – Hopson and Webster, J.
Streamflow Predictability Tom Hopson. Conduct Idealized Predictability Experiments Document relative importance of uncertainties in basin initial conditions.
Center for Hydrometeorology and Remote Sensing, University of California, Irvine Basin Scale Precipitation Data Merging Using Markov Chain Monte Carlo.
National Weather Service Application of CFS Forecasts in NWS Hydrologic Ensemble Prediction John Schaake Office of Hydrologic Development NOAA National.
Global Flood and Drought Prediction GEWEX 2005 Meeting, June Role of Modeling in Predictability and Prediction Studies Nathalie Voisin, Dennis P.
Short-Range Ensemble Prediction System at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
Adjustment of Global Gridded Precipitation for Orographic Effects Jennifer C. Adam 1 Elizabeth A. Clark 1 Dennis P. Lettenmaier 1 Eric F. Wood 2 1.Dept.
Potential for medium range global flood prediction Nathalie Voisin 1, Andrew W. Wood 1, Dennis P. Lettenmaier 1 1 Department of Civil and Environmental.
Sources of Skill and Error in Long Range Columbia River Streamflow Forecasts: A Comparison of the Role of Hydrologic State Variables and Winter Climate.
Verification of ensemble systems Chiara Marsigli ARPA-SIMC.
Alan F. Hamlet Andy Wood Dennis P. Lettenmaier JISAO Center for Science in the Earth System Climate Impacts Group and the Department.
Nathalie Voisin 1, Florian Pappenberger 2, Dennis Lettenmaier 1, Roberto Buizza 2, and John Schaake 3 1 University of Washington 2 ECMWF 3 National Weather.
Common verification methods for ensemble forecasts
DOWNSCALING GLOBAL MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR FLOOD PREDICTION Nathalie Voisin, Andy W. Wood, Dennis P. Lettenmaier University of Washington,
VERIFICATION OF A DOWNSCALING SEQUENCE APPLIED TO MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR GLOBAL FLOOD PREDICTION Nathalie Voisin, Andy W. Wood and.
EVALUATION OF A GLOBAL PREDICTION SYSTEM: THE MISSISSIPPI RIVER BASIN AS A TEST CASE Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier Civil and.
A medium range probabilistic quantitative hydrologic forecast system for global application Ph.D. defense - Nathalie Voisin March Civil and Environmental.
Long-lead streamflow forecasts: 2. An approach based on ensemble climate forecasts Andrew W. Wood, Dennis P. Lettenmaier, Alan.F. Hamlet University of.
Figures from “The ECMWF Ensemble Prediction System”
National Oceanic and Atmospheric Administration’s National Weather Service Colorado Basin River Forecast Center Salt Lake City, Utah 11 The Hydrologic.
Evaluation of TRMM satellite precipitation product in hydrologic simulations of La Plata Basin Fengge Su 1, Yang Hong 2, and Dennis P. Lettenmaier 1 1.
Improving Numerical Weather Prediction Using Analog Ensemble Presentation by: Mehdi Shahriari Advisor: Guido Cervone.
Long-Range Streamflow Forecasting Products and Water Resources Management Applications in the Columbia River Basin Alan F. Hamlet, Andy Wood, Dennis P.
Latin American and Caribbean Flood and Drought Monitor – What it does and does not do Figure showing current system Coarse resolution 25km, daily Satellite.
Nathalie Voisin1 , Andrew W. Wood1 , Dennis P. Lettenmaier1 and Eric F
Upper Rio Grande R Basin
5th International Conference on Earth Science & Climate Change
A few examples of heavy precipitation forecast Ming Xue Director
Hydrologic Considerations in Global Precipitation Mission Planning
Issues in global precipitation estimation for hydrologic prediction
THE POTENTIAL FOR MEDIUM-RANGE GLOBAL FLOOD PREDICTION
Verifying and interpreting ensemble products
Precipitation Products Statistical Techniques
Question 1 Given that the globe is warming, why does the DJF outlook favor below-average temperatures in the southeastern U. S.? Climate variability on.
POTENTIAL AND CONSTRAINTS TO IMPROVE EARLY WARNING
With special thanks to Prof. V. Moron (U
1Civil and Environmental Engineering, University of Washington
Dennis P. Lettenmaier, Andrew W. Wood, Ted Bohn, George Thomas
Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier
Application of satellite-based rainfall and medium range meteorological forecast in real-time flood forecasting in the Upper Mahanadi River basin Trushnamayee.
Hydrologic ensemble prediction - applications to streamflow and drought Dennis P. Lettenmaier Department of Civil and Environmental Engineering And University.
Modeling of land surface processes in La Plata Basin
THE POTENTIAL FOR FLOOD AND DROUGHT PREDICTION
Kostas M. Andreadis1, Dennis P. Lettenmaier1
Hydrology and Water Management Applications of GCIP Research
Analysis of NASA GPM Early 30-minute Run in Comparison to Walnut Gulch Experimental Watershed Rain Data Adolfo Herrera April Arizona Space Grant.
Overview of Models & Modeling Concepts
Long-Lead Streamflow Forecast for the Columbia River Basin for
Probabilistic forecasts
Advances in seasonal hydrologic prediction
The Importance of Reforecasts at CPC
A. Wood, A.F. Hamlet, M. McGuire, S. Babu and Dennis P. Lettenmaier
N. Voisin, J.C. Schaake and D.P. Lettenmaier
Verification of COSMO-LEPS and coupling with a hydrologic model
Andy Wood and Dennis P. Lettenmaier
Global Flood and Drought Prediction
Christoph Gebhardt, Zied Ben Bouallègue, Michael Buchhold
Evaluation of the TRMM Multi-satellite Precipitation Analysis (TMPA) and its utility in hydrologic prediction in La Plata Basin Dennis P. Lettenmaier and.
SWFDP Key Issues for GIFS-TIGGE
Short Range Ensemble Prediction System Verification over Greece
Ryan Kang, Wee Leng Tan, Thea Turkington, Raizan Rahmat
Presentation transcript:

Application of a global probabilistic hydrologic forecast system to the Ohio River Basin Nathalie Voisin1, Florian Pappenberger2, Dennis Lettenmaier1, Roberto Buizza2, and John Schaake3 1 University of Washington 2 ECMWF 3 National Weather Service – NOAA European Geophysical Union General Assembly , May 5 2010

Background Existing Flood Alert Systems in mostly-ungauged basins Limpopo 2000 Early Flood Alert System for Southern Africa (Artan et al. 2001) South Asia 2000 Mekong River Commission – basin wide approach for flood forecasting Bangladesh 2004 (Hopson and Webster 2010)* Horn of Africa 2004 (Thiemig et al. 2010, EU - AFAS)* Zambezi 2001,2007,2008 (EU-AFAS, in process)* Message: 1. existing flood alert system in developed countries : many use ensemble weather forecasts, most important they use in-situ data: rain gauge station observations, radars, river flow gauge etc. And they are for one basin in particular 2. in ungauged basins: - usually financed by international organization following desastrous events - case by case basis Some are ensemble some are not - basin dependent - maintenance issue : educated people leave AND expensive 3. Goal here: - develop a system hydrological forecast that would use ensemble weather forecast - for large domains : not one basin at a time but a continent ( except for flow ) -global approach for calibrating the weather forecasts - using only globally available tools, and can be run remotely to avoid cost and maintenance to population TOO LONG Global application i.e. have one consistent system over entire Africa and South East Asia run at once remotely: -> main interest: reduce the financial burden of maintenance and operation  cover entire continent instead of being on a basin per basin basis ( AFAS like) * Ensemble flow forecasting

Objective Develop a medium range probabilistic quantitative hydrologic forecast system applicable globally: Using only (quasi-) globally available tools: Global Circulation Model ensemble weather forecasts High spatial resolution satellite-based remote sensing Using a semi distributed hydrology model applicable for different basin sizes, not basin dependent flow forecasts at several locations within large ungauged basins Daily time steps, up to 2 weeks lead time Reliable and accurate for potential real time decision in areas with no flood warning system, sparse in situ observations (radars, gauge stations, etc) or no regional atmospheric model. Note that similar to EFAS

Forecast scheme Today Initial State Voisin et al. (2010, in review) Explain the scheme and state how it differs from the existing systems in ungauged basins ( global application) Today Initial State

Science Questions What is the forecast skill of the system? What are the resulting hydrologic forecast errors related to errors in the calibrated and downscaled weather forecasts? Is the forecast skill different for basins of different size?

Ensemble precipitation forecast calibration and downscaling Shows snapshots of two observed events: First one is the TMPA largest basin average precip day in the 2002-2006 period -> interpolation-like for RMSD and RMSDmean because….. -> unrealistic spottyness for BCSD - Second is a day with significant precipitation (upper tercile ) but without interpolation substitution in RMSD and RMSDmean All look more realistic than interpolation method : higher precipitation values in specific grid cells, precipitation patterns. Analog method vs interpolation: - maintained resolution & discrimination slightly lower predictability BUT largely improved reliability smaller mean error more realistic precipitation patterns

(substitute for observations, Climatology) Forecast – Reference (substitute for observations, Climatology) Forecast – Clim & null Precip 4 15-member ensemble, 15-day daily forecast: Day 1-10: ECMWF EPS fcst Day 11-15: Zero precip. 1 Deterministic 15-day daily fcst Day 1-15: - Zero precip. ECMWF analysis fields: with TMPA precipitation Daily, 2003-2007 period, 0.25 degree 2 3 ECMWF EPS fcst Interpolated to .25o ECMWF EPS fcst Calibrated & downscaled ( analog method) … Initial hydrologic state VIC 2003-2007 period VIC 15-day simulation … Daily 2003-2007 simulated runoff, soil moisture, SWE Substitute for observed runoff 15-member ensemble 15-day distributed runoff forecast deterministic 15-day distributed runoff forecast … Initial flow conditions Routing model 15-day simulation Routing model 2003-2007 period … 15-member ensemble 15-day flow forecast at 4 stations with different drainage areas 15-day deterministic flow forecast at 4 stations with different drainage areas 2003-2007 simulated daily flow Substitute for observations

Calibration of the hydrology and routing models → Use “simulated observed flow” as reference (ECMWF Analysis and TMPA precipitation) →Focus on weather forecasts errors No flow observation uncertainties No hydrology model and routing model ( structure, parameter estimation) uncertainties Re-explain briefly why the application is over the Ohio River Basin ( previous work)

Verification of ensemble runoff forecasts Ohio River Basin 2003-2007 1826 15-day forecasts (10 day fcst, +5 days 0-precip) 848 0.25o grid cells CRPS is a great measure for probabilistic fcst: Handy because get a measure for one forecast BUT very sensitive to the size of the ensemble spread ( range)

Ensemble flow forecasts verification

Ensemble flow forecasts verification Ensemble reliability at Metropolis and Elizabeth

Conclusions A preliminary probabilistic quantitative hydrologic forecast system for global application was developed and evaluated: Skill for 10 days for spatially distributed runoff Skill for 1-12+ day forecasts depending on concentration times at the flow forecast locations For small basins : skills for 10 days, with good reliability for short lead times For larger basins: for 10 days + concentration time Ensemble weather forecasts need to be calibrated: for better hydrologic probabilistic forecasts ( reliability ) For better forecast accuracy in sub basins locations Will incorporate PUB and HEPEX results and ideas. ( PUB: Predictions in Ungauged Basins HEPEX: Hydrologic Ensemble Prediction Experiment)

Thank you – Questions?

Forecast Verification Which forecasts? Spatially distributed ensemble runoff forecasts Ensemble flow forecasts at 4 locations Verification: Deterministic Forecast Skill Measures: Bias ( accuracy, mean errors) RMSE (accuracy) Correlation (accuracy, predictability) Probabilistic Forecasts Skill Measures: Continuous Rank Probability Skill Score (accuracy, reliability, resolution, predictability) Rank Histograms ( ensemble spread i.e. probabilistic forecast reliability) For forecast categories: What can I expect when a forecast falls in a certain forecast category? ( oriented for real-time decision )

Calibration of the hydrology and routing models -Differences between TMPA and observed precipitation -Daily flow fluctuations due to navigation, flood control, hydropower generation Uncertainties in VIC and routing models physical processes, structure and parameters Re-explain briefly why the application is over the Ohio River Basin ( previous work) → Use “simulated observed flow” as reference →Focus on weather forecasts errors

Ensemble forecast verification Relative Operating characteristic (ROC) Plot Hit Rate vs. False Alarm Rate for a set of increasing probability threshold to make the yes/no decision. Diagonal = no skill Skill if above the 1:1 line Measure resolution A bias forecast may still have good discrimination.

Ensemble Forecast Verification Ensemble reliability: Reliability plot: PROBABILISTIC fcsts Choose an event = event specific Each time the event was forecasted with a specific probability ( 20%, 40%, etc), how many times did it happen ( observation >= chosen event). It requires a sharpness diagram to give the confidence in each point. It should be on a 1:1 line. Talagrand diagram (rank): PROBABILISTIC QUANTITAVE fcsts Give a rank to the observation with respect to the ensemble forecast ( 0 if obs below all ensemble members, Nmember + 1 if obs larger ) Is uniform if ensemble spread is reliable, (inverse) U-shaped if ensemble is too small (large), asymetric is systematic bias.

Continuous Rank Probability Score Probabilistic quantitative forecast verification measures the difference between the predicted and observed cumulative distribution functions: resolution, reliability, predictability For one forecast(gridcell, lead time, t): d1 d2 d3 dNmember magnitude Prob Fcst ∆P12 ∆PN2 1 forecast is best. 1 1 1