Friday 14th December - morning

Slides:



Advertisements
Similar presentations
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Advertisements

LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday 11/07: Recovery Plenty of accesses.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Saturday 30th June - Sunday: Rocky !
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Monday – recovery from MKI flashover
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Scrubbing progress - 10/12/2012
LHC Morning Meeting - G. Arduini
Mike Lamont, Jorg Wenninger
Friday March 4th 08h32: Access for beam dump system.
Saturday 4.12 Beam in the SPS at 09:30 Beam in the LHC at 10:00
LHC Morning Meeting - G. Arduini
Week 35 – Technical Stop and Restart
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Chromaticity can make a difference…
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Friday Morning 7:30 injection for fill 2908
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
LHC Morning Meeting - G. Arduini
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary week 18 Intensity ramp up & production
Saturday 3rd November - morning
Scrubbing progress - 08/12/2012
Thursday – Morning Energy matching at injection with H CODs
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Friday 15th February - morning
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 10th December - morning
Wednesday 26 October 2011.
Thursday 2.12 Cryo recovery…. Access… RF cavity check (noise) Cav4B1.
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Presentation transcript:

Friday 14th December - morning Waiting for a repair of the RBIH400107 power converter in TT40. RBIH400107 has been moved to the spare power converter with relevant interlocks but the PC does not follow the reference correctly. Verification of injection timing of h=9 beam with TEDs in 11:00 Repair of TT40 power supply Fill for loss maps – 12b (ADT gain in ramp increased) (Started WBTN and Diode-Orbit ACQ accuracy tests. RS) 12:30 loss maps end of squeeze 13:10 loss maps in collision 24-11-12 LHC status

Increased ADT bandwidth in the "wideband mode" which is used for the 25ns (and during the squeeze for 50ns) operation should allow to reduce the blowup or cleaning window to a single bunch without interfering with the neighbour bunches. A test to prove this was conducted at the end of the loss maps. A train of 12 bunches spaced by 25ns was circulating at 4TeV (used for loss maps). The cleaning window was reduced to one single bunch slot and the blow up excitation was activated for the bunch in the slot #50. The bunch blew up and lost intensity, while bunches in the neighbour slots did not suffer any measurable losses. The test was then repeated for bunches in the slots #47 and #48. Daniel 24-11-12 LHC status

Bunch sculpture 24-11-12 LHC status

Friday afternoon 13:30 end loss maps Finish validation of h=9 beam 24-11-12 LHC status

H=9 B2H 16:00 Injection of h=9 beam 24-11-12 LHC status

LHC Morning Meeting - G. Arduini Friday evening Restarted for 25 ns MD at 16:30 after Loss maps and h=9 injection test Injection of 804 bunches with reduced bunch intensity (0.9x1011 p/b) for heat load comparison at different bunch intensity for benchmarking purposes First ramp lost due to SW interlock (several BPM not returning data) Difficulties in filling again (octupoles not set correctly, unexplained BPM trigger at injection) 21:50 Finally at flat-top after an UFO (67% of dump threshold) during the ramp 31/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Heat load 0.9x1011 p/b 1.15x1011 p/b 31/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Saturday 15th morning 23:04 beams dumped due to loss of communication with a few access elements in point 6 Patrol lost in a few sectors in point 6 Ready for injection at 03:00 Inject trains of 288 bunches. Dumped by injection losses in point 2 at 05:10 when we had 1884 bunch/beam. Heat load not yet stabilized. Fill the machine with trains of 72 bunches (2100 bunches with a stop at ~1000 bunches) for benchmark purposes. Let the heat load to stabilize. During filling (06:30) problem with TDI in point 2. OK after piquet intervention. 31/12/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini 31/12/2018 LHC Morning Meeting - G. Arduini

SEY of the beam screen Preliminary estimation of present SEY situation in the arcs. Detailed analysis to reconstruct SEY history is ongoing. An important benchmark for our model is to check the consistency of the heat load with different filling patterns (e.g. 72b vs. 288b). Last steps after 4 TeV tests.

LHC Morning Meeting - G. Arduini Next step: Fill with 4 trains of 288 bunches to get final reference for heat load in steady state (~1 hour) Then go for physics (BCMS) 2*48b – short fill as test 25ns_396b_372_348_372_96bpi5inj 31/12/2018 LHC Morning Meeting - G. Arduini

Sunday Global aperture measurement at 450 GeV (MG – 4 hrs) Ralph Steinhagen – 1hr RF: longitudinal feedback and fast BQM ~ 2 hrs 19:00 start access for BI (attenuators BPMS point 6 (and schottky) Pre-cycle Verification of BPMS pA MD until 06:00 24-11-12 LHC status