Summary A well planned preparation for the review during pre-licensing phase is a key factor to a successful review. Plan for the review should be prepared.

Slides:



Advertisements
Similar presentations
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Advertisements

IAEA 1 The IAEA has revised the 1996 Safety Standards 50-C/SG-Q: QA Requirements and Safety Guides Published in 1996 Promotes structure: –Management –Performance.
1 of 23 From Qualitative Concept to Practical Implementation Evolution of the Data Quality Objectives Concept DQO Training Course Day 1 Module 1 15 minutes.
 COST OF PROJECT  CONTRACTS AND CONDITIONS  CHANGE ORDERS  SAFETY PROCEEDURES.
Update on progress with development of DS459
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
IAEA International Atomic Energy Agency. IAEA Outline USNRC IRRS Training - Preparations of Reviewers2 Learning Objectives To start with Advance Reference.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Azerbaijan.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
IAEA International Atomic Energy Agency. IAEA Outline Objectives and Participation Information Brochure Presentations Test Questions At the end of the.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ESTONIA.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.10 Documents to be Submitted to the Regulatory Body.
Regulatory Framework for Uranium Production Facilities in the U.S.
Dave Fennell, Imperial Oil Resources Overview: This package has been developed to help you create awareness for managers, supervisors, employees and contractors.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
International Atomic Energy Agency Irina Sanda Education and Training in the Area of Safety Assessment Irina Sanda Safety Assessment Section Division of.
Writing Executive Summary Sandra Sembel and Itje Chodidjah.
WHO Regional Workshop on Good Manufacturing Practices for Blood Establishments Dr Ana Padilla, Blood Products & related Biologicals Essential Medicines.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Bureau Regulatory Initiatives Ramona Chambus. Bureau Regulatory Initiatives Subchapter 19 – Radiologic Technology Subchapter 19 – Radiologic Technology.
Safety and Security culture C. Almeida National Commission for Nuclear Energy - Brazil September 2014.
10 Factors That Influence Risk Tolerance
PAG Manual Revision Update and Next Steps
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
CONTRACT ADMINISTRATION
Technical Oversight Working Group
Overview of Project Planning
MANCP Network Document on Performance Objectives & Indicators
DS477 Draft Safety Guide: The Management System for the Predisposal and Disposal of Radioactive Waste CS to develop the draft IAEA Safety Guide on the.
Abdulla Al Yammahi Specialist, Radiation Safety Inspection
Introduction to Project Management
NRC’s LLW Regulatory Program: Update of Emerging Issues
Request for Proposal (RFP)
STEP 8 - CLOSING PHASE: TRANSITION SUPPORT
WARM UP.
Warm Up Simplify 3
Consultants’ Meeting to develop a guidance document on management of large amounts of radioactive waste after an emergency situation 04, Feb. – 08, Feb.
Communication and Consultation with Interested Parties by the RB
Tom Wolf, Governor Patrick McDonnell, PA DEP Secretary
Warm up Factor the expression x – 5x2 2. x2 – 2x – 48.
USNRC IRRS TRAINING Lecture18
Research and Test Reactor Decommissioning Inspections
UNIT SELF-TEST QUESTIONS
Understanding and Planning Business Reports and Proposals
Development of a Process for Conducting review & Assessment of PSAR of a NPP Group I.
NRC Update of LLW Emerging Issues
Education and Training in the Area of Safety Assessment Irina Sanda
Group E1 - Improving financing NPP QUESTIONS / DIFFICULTIES
Technical Meeting on the Safe Disposal of Intermediate Level Waste –
SMR Regulators’ Forum Pilot Project Report
Land Management Framework Project
BASIC IRRS TRAINING Lecture 14
REGULATORY ASPECTS OF RADIOACTIVE WASTE MANAGEMENT IN TURKEY Dr
Stewardship in biotechnology
SMR Regulators’ Forum Mr. Stewart Magruder
Topic: Time Frame: Argument: Analyse: Concepts: Criteria: Conclusion:
Was the equipment purchased before 13th August 2005? No
QUESTION: Compare and contrast the policies of Alexander II ( ) and Alexander III ( ) of Russia. (May 2006) Topic: Time Frame: Argument: Analyse:
CDM v Asset Lifecycle Health and Safety Management
New Plant Configuration Management Development and Implementation Process John Maciejewski INPO June 29, 2009 EN MRM Standardization Model.
The Transport standards
Safety requirements for predisposal management
DRAFT ISO 10004:2018 Revision Overview Quality management — Customer satisfaction — Guidelines for monitoring and measuring ISO/TC176 TG 01.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Summary A well planned preparation for the review during pre-licensing phase is a key factor to a successful review. Plan for the review should be prepared and resources assured before the review. The review should be guided as detailed as possible. Completeness review before the detailed review phase outlines the scope of the safety case and identifies the shortcomings in it. Regulations that are up to date are of importance for this kind of new nuclear waste disposal concept. Mutual understanding on the regulatory guidance are essential for avoidance of any misunderstandings between the regulator and the license applicant. The review process revealed that more thorough discussions between the regulator and the license applicant before the review would have been needed. Especially more thorough discussions concerning the structure of the documentation and the level of details would have simplified and facilitated the review process. An active communication with the license applicant should continue during the review phase.