Reconciliation of Shipper and Supplier Theft Data – April 2018 PAC

Slides:



Advertisements
Similar presentations
1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
Advertisements

12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
1 Modification 422 Creating the permission to release data to Meter Asset Provider organisations A presentation by the Community of Meter Asset Providers.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
1 Project Nexus Requirements Definition Phase Steve Nunnington.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
PN UNC Workgroup Read Validation 4 th October 2011.
Mod Proposal Prevention of "Timing Out" of Authority decisions on Modification Proposals Nick Reeves.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal February 2010 Karen Kennedy ScottishPower.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Performance Assurance Framework Risk Register Consultation Summary
Action 0002: Meter Error Notifications
Revised registration for unregistered sites
Smart Metering Consequential Changes
PAF Risk Register and PARR mapping
UK Link Programme ChC - PIS Approach Overview
iGT Agency Services Background
UNC User Representatives Process
Modification th July 2008.
Connected System Exit Points Administration Options
Gas Performance Assurance
Rolling AQ Review Group 177.
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
COR1072 Enduring Transfer and Trade Arrangements
XRN 4695 Supporting Document High Level Plan
Theft on Shipper-less Sites
Connected System Exit Points Administration Options
Background MDD is currently managed within SPAA
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Gas Long Term Vacant (LTV) Proposal April 2010
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
UIG Task Force Progress Report
xoserve Theft of Gas Team
TOG Review Group UNC245 Xoserve Actions.
Performance Assurance – Consideration of Discussions to date
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
UNC User Representatives Process
Deferral of Retrospective Updates Functionality
Procurement of NDM profiling data
MOD 640 INVOICING VALIDATION RULES
Modification 421 – Updates and Benefits Case
Options for Procurement of Gas Meter Temperature Lab Tests
Review Group 208 / Development Modification Group 194
Modification Proposal 136
Actions Updates Action 0282/006 – Exclude from AQ process
Background At the February TEG Experian presented a list of data recommendation identified through the analytical element of the 2018 Performance Assurance.
Joint Office UNC Elections
UNCC - PAC Proposal for the Election Process to the PAC
Customer Issue Management CoMC Update for April & May 2019
Joint Office UNC Elections
Enabling Large Scale Utilisation of Class 3
Joint Office UNC Elections
Xoserve Draft UIG Incentives Modifications 20 May 2019
Customer Issue Management Dashboard CoMC
MDD Reconciliation - CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

Reconciliation of Shipper and Supplier Theft Data – April 2018 PAC Michelle Simpson

Background to the Reconciliation of Shipper to Supplier Reported Thefts The Performance Assurance Committee (PAC) sought to gain clarity on the quantities of energy identified through TRAS which would have an impact on the allocation and settlement process in UNC and how this would impact risk PACR001, Theft of Gas in connection with SPAA and TRAS. PAC would like to understand the quantities of energy related to gas identified by TRAS and if there are any assumptions around the levels of theft and any associated mitigation of risks, so that they can then prioritise this risk against other settlement risks. PAC would also like to understand the quantities of energy (gas), to see if this then mirrors the levels identified through UNC process to ensure settlement is held whole and if reports are required to getter a better view of Shipper performance. ElectraLink has carried out reconciliation to aid with the scoring of risk, comparing: Shipper valid cases of theft with kWh – Gas Governance data Supplier confirmed thefts (excluding zero kWh energy thefts) – TRAS data, source Experian

Shipper v Supplier Confirmed Theft Charts Observations/Notes: c 1800 more confirmed thefts registered by Suppliers than Shippers in period. c 11m kWh more energy registered by Shippers than Suppliers. There is potential time lag between supplier and shipper theft reporting, therefore increasing the date range could be considered. Shipper only identified theft could be the balancing kWh figure; merit in identifying this and adding to TRAS thefts so as to conclude reconciliation. Insights from PAC welcome to understand why thefts reported to Xoserve and Experian differ.