Upscaling Basic Sanitation for the Urban Poor (UBSUP)

Slides:



Advertisements
Similar presentations
Inspect Water Distribution EO Air Gaps, Vacuum Breaker, and Back Flow Preventers TP 8 50 min.
Advertisements

Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Introduction to Septic Tanks John R. Buchanan, Ph.D., P.E. University of Tennessee.
STEAM TRAPS.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
BS9990 : 2015 Updates and/or Changes
Improvement of the Capacity of Drinking Water Treatment Plant in East Quantara (Case Study) Dr. Eng. Ibrahim Khaled El-Sayed Chairman 1North & South Sinai.
CE HYDRAULICS ENGINEERING
Reciprocating pump Pumps are used to increase the energy level of water by virtue of which it can be raised to a higher level. Reciprocating pumps are.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
Plan Review Required Materials [ARM (3)] – (a) a plan view and a sectional view of both the pool, spa, or other water feature or related facility,
1 II. Sewer Networks and Facilities Topic II.2. Sewerage Systems:Kinds and Features Kinds of Sewerage Systems Combined Sewer System (CSS) 1 - combined.
Sources of water (RAIN)
Bioreactors for the Reduction of Nutrient Transport.
GIDC DEGREE ENGINEERING COLLEGE BRANCH- CIVIL ENROLLMENT NO PATEL SHARADKUMAR KIRITBHAI SHARMA TANISHQ SHAH ASHIT.
Lec.16 Underground pipeline irrigation system - structures for underground pipelines.
1 I. Water Supply Networks and Facilities Topic I.4. River Water Intakes: Kinds and Structures Water Intake Kinds General classification: I. According.
FEDIAF Guide to Good Practice for the Manufacture of Safe Pet Food TRAINING PACKAGE Module V Plant design and maintenance Based on Version 9, 2009 of the.
M.K. PANDEY/P. Jenssen Centralised –Decentralised transportation system.
Water Services Trust Fund Sanitation Team Training workshop  What is sanitation?  The Sanitation Value Chain  Sanitation in urban Kenya  Main sanitation.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
SafiSan Projects: Payments and Incentives for Toilet Emptying, Sludge transport and Treatment A step-by-step approach for WSPs Prepared by the UBSUP Team.
Upscaling Basic Sanitation for the Urban Poor Involvement of Stakeholders in the UBSUP Programme and its SafiSan Projects By the UBSUP Team 26 th - 27.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
SETA Water treatment plant maintenance
Job Performance Requirement Soft-Sleeve Hydrant Connection.
ME444 ENGINEERING PIPING SYSTEM DESIGN
UBSUP & SafiSan: Key Characteristics Prepared by the UBSUP Team 1 UBSUP, SafiSan, plot & household level sanitation, demand-driven approach, UDDTs, the.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
CHINESE CIRCULAR HATCHERY
Ice Energy Extraction Unit. Throttling Valve Ice Tank PVC piping Radiator Drain Valve Plexiglas Fan mounted against back of radiator Overall View Plywood.
Water supply definitions Water supply definitions Four Basic components of a water supply system Four Basic components of a water supply system Methods.
GUJARAT TECHNOLOGICAL UNIVERSITY (GTU) Mahatma Gandhi Institute Of Technical Education and Research Center, Navsari Affiliated with GTU Presentation on.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Unit 209: Drainage systems
Simple Sanitation Technology For Egypt Villages Prepared by Sameh Seif Ghali Executive Director Together Association For development and environment R.
VALVES IN PIPE LINES.
CONSTRUCTION OF A DTF DO’s and DON’Ts.
Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components.
THE DTF CONCEPT.
Lukhdhirji Engineering College
LEVELLING This deals with the determination of the relative heights of points on the earth’s surface. The process of this determination is either direct.
Sanitation is Business
Groundwater-Surface Water Interactions
Maintenance of the On-Lot Sewage System
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
KINEMATICS 1. A nozzle is so shaped that the velocity of flow along the centre line changes linearly from 1.5 m/s to 15 m/s in a distance of m. Determine.
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Private Septic Systems
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
UBSUP Technical Options
Decentralised Treatment Facility (DTF)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Septic System Construction and Location
Private Septic Systems
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Water Sector Trust Fund
Construction of toilets and septic tanks
TECHNICAL SPECIFICATION AND REQUIREMENTS
What to Expect When You’re Inspected
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Construction of toilets and septic tanks
SETTING OUT OF THE DTF MODULES.
Presentation transcript:

Upscaling Basic Sanitation for the Urban Poor (UBSUP) Preparation of final design Technical Drawings Plan View 1/1/2019

Content Questions you might to ask yourself: What is the context of this session? How do potential DTF layouts looks like? What has to be considered during layout preparation? 1/1/2019

What is the context of this session? The SafiSan Toolkit This session 1/1/2019

How do potential DTF layouts looks like? VFCW SDRB ABR ST CA RB/BT Storage 1/1/2019

How do potential DTF layouts looks like? VFCW SDRB ABR ST CA RB/BT Storage 1/1/2019

How do potential DTF layouts looks like? VFCW ABR ST SDRB RB/BT CA Storage 1/1/2019

How do potential DTF layouts looks like? VFCW CA ABR SDRB ST RB/BT Storage 1/1/2019

Baseline data collection - Boundaries Mark corners (e.g. with metal rods) Ensure sufficient distance (riparian) to water bodies as per NEMA 1/1/2019

Design - Boundaries 1/1/2019

Baseline data collection - Raster levelling Take levels according to a fix raster (20-30 points) ► To consider the existing ground level/ topography during the proper arrangement of the modules! 1/1/2019

Design – Raster Levelling 1/1/2019

Baseline data collection - Arrangement Arrange all required modules in an operational manner Consider space for manoeuvring of exhauster trucks Consider access for exhauster trucks to ST and ABR for de-sludging Consider access to all treatment modules for O&M Ensure proper arrangement of pipes, bypass pipes and inspection boxes ► To determine in the BoQs the number of inspection/bypass chambers! 1/1/2019

Excursion: How are ST and ABR de-sludged? To avoid a fixed pumping station (requires energy) exhauster trucks can be used to de-sludge the DTF modules Exhausters pump sludge from bottom of ST and ABR (pump head approx. 3m) Exhausters discharge sludge by gravity on top of SDRB (via hose) ► SDRB surface must be constructed slightly lower than discharge valve of exhauster truck ► SDRB outlet pipe must be constructed slightly higher than the inlet of the receiving treatment module (according to the DTF layout either the RB or ST or ABR or VFCW) ► To be considered in preparation of cross-section 1/1/2019

Design - Arrangement Operation Regular Maintenance VFCW Operation Regular Maintenance Occasional Maintenance CA ABR SDRB ST RB/BT Storage 1/1/2019

Baseline data collection - Distances Determine distances: VFCW outlet to final discharge point Outlet of ABR-BT to VFCW ST outlet to ABR inlet Outlet of RB/BT to ST inlet Drainage pipe from SDRB to ABR/VFCW (Bypass pipes) (Site boundaries) ► Required to determine in the BoQs the length of PVC pipes (connection & bypass)! 1/1/2019

Design – Distances A Examples: A: 40m B: 7m C: 9m B D: 4m E E: 4m C D VFCW Examples: A: 40m B: 7m C: 9m D: 4m E: 4m B E CA ABR C SDRB ST D RB/BT Storage 1/1/2019

Do you have any questions, remarks or suggestions? 1/1/2019