CC DEVELOPMENT PROGRESS and SCHEDULE

Slides:



Advertisements
Similar presentations
XFEL 2D Pixel Clock and Control System Train Builder Meeting, UCL 11 May 2010 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing,
Advertisements

XFEL 2D Pixel Clock and Control System. 2 OUTLINE June meeting at DESY June meeting at DESY C&C Hardware structure C&C Hardware structure C&C Firmware.
XFEL Meeting, Hamburg September 2010 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing XFEL 2D Pixel Clock and Control System.
XFEL Meeting, DESY 5 May 2011 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing XFEL 2D Pixel Clock and Control System.
XFEL Meeting, RAL 20 January 2011 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing XFEL 2D Pixel Clock and Control System.
GCT Leaf Card. Overview Based on existing double PMC board Based on existing double PMC board Satellite processor prototypeSatellite processor prototype.
02/06/2014James Leaver Slink Transition Card. 02/06/2014James Leaver Slink Transition Card Simple 6U board: –Provides interface between FED and Slink.
New Corporate Identity Poster Design Department of Physics and Astronomy, University College London Erdem Motuk, Martin Postranecky, Matthew Warren, Matthew.
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
RGB LED Cube Team 15: C an’t U ndo B ad E lectrons Luke Ausley BSEE Joshua Moyerman BSPE Andrew Smith BSPE Sponsored by Stellascapes.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
AGATA Pre-processing team report AGATA Week, July 2008.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
2 4 Dec 2008C+C Crate Layout CC Master TCLKA TCLKB RX17 TX17 RX18 TX18 RX19 TX19 RX20 TX20 (wired-OR) Bunch Clock FE Clock (99MHz) Trig (Start) EncClock.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
BEE3 Updates June 13 th, 2007 Chuck Thacker, John Davis Microsoft Research Chen Chang UC Berkeley.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Status of shaper prototype production B.G. Cheon (Hanyang U)‏ Dec. KEK 1 st open meeting of the Super KEKB Collaboration.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
XFEL In-kind Review Committee Meeting, 11 May 2009 Parliament British Museum XFEL clock and control system In kind contribution proposal Development and.
Clara Gaspar, April 2014 ECS (Marseille+Annecy+CERN) 1 FPGA CCPC Firmware DIMServer Mini DAQ Test UIHW Description UIOperation UI Control PC WinCC-OA PCIe.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
1 Hardware Tests of Compute Node Carrier Board Hao Xu IHEP, CAS.
Status Report of the PC-Based PXD-DAQ Option Takeo Higuchi (KEK) 1Sep.25,2010PXD-DAQ Workshop.
HCAL upgrade FPGA FW: tasks and issues 12 May2016 Tullio Grassi, Univ. of Maryland.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Chris Booth Sheffield 29th March 2006
Boom Electronics Board (BEB) Engineering Peer Review Oct
Status report from PANDA Beijing Group
CLAS12 DAQ & Trigger Status
CCS Hardware Test and Commissioning Plan
Off-detector electronics: what could be a generic module?
TDC Testing Status Edge Detector test for up to 7 hits per channel:
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
The ELENA BPM System. Status and Plans.
The University of Chicago
XFEL Clock and control system in-kind proposal
Next steps - with notes from during the meeting 24 March 2016
CALICE/EUDET Electronics in 2007
Digital Sub-System Dorothy Gordon.
ATLAS: Level-1 Calorimeter Trigger
ECAL electronics schedule
XFEL 2D Pixel Clock and Control System Train Builder Meeting, UCL 11 May 2010 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing,
Games Design Yr2 Term 2 - Introduction.
FEE Electronics progress
Status of the EUDET Prototype
April May April May June July July June August Sept August
TSF Upgrade Project Overview Resources Plans and Timetable
State of developments on Readout interface of European DHCAL
Krzysztof Czuba ESS LLRF Quarterly Meeting
RPC FEE The discriminator boards TDC boards Cost schedule.
Sector Processor Status Report
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Plans for the 2004 CSC Beam Test
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

CC DEVELOPMENT PROGRESS and SCHEDULE PC3461M test card (Daughterboard for the development board) The manufactured boards are received. 8 boards in total. Initial test carried out - boards are in working order. Used for telegram and FAST data transmission tests. Initial test ok. Stress testing is carried out to verify the AC coupling circuitry. Initial test ok. (Testing to be completed first week of April) Available to detector developers. (Providing one channel clock/command) RTM prototype Schematic design and packaging finalised. The design is with the RAL for layout. - Expected to finish early May The production. - Expected June Testing – June-August

Firmware debug/development Joined to DESY-wide effort for DAMC2 FPGA development - for standardisation Initial development with DESY provided PCIe and IIbus blocks. CC specific blocks to be modified to use IIBus structure. - Expected to be finished late April Telegram transmit/receive  - Now partly developed by P Gessler's team Driver for the board being developed by DESY  - CC related modifications possible if needed xTCA in-crate testing DAMC2 board is in the crate. Powers up ok. Can be programmable. PCIe link works with a test firmware and driver. Current TR firmware from the SVN will be compiled and loaded to TR FPGA.  - There is a firmware with some functionality. – Late April DAMC2 firmware (generated by integrating the blocks) will be tested along with the driver. – Early May