ATN 99 Service Technique de la Navigation Aérienne 1 ATN Activities & Plans ATN in FRANCE FOR SAFETY REASONS MAIN FUTURE DATA/LINK ATSC WILL BE ATN.

Slides:



Advertisements
Similar presentations
Direction générale de lAviation civile direction de la Technique et de lInnovation direction des services de la Navigation aérienne AGCFG meeting Brussels.
Advertisements

ATN-2000 AOC Migration Strategy Presented by Frank OConnor.
Presented by Jean-Yves PIRAM
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
Overview of the interoperability Regulation
Introduction to ATN Routers Mark A. Brown Oki Electric Industry Co., Ltd. © 2003 Oki Electric Industry Co., Ltd.
FAA AMHS Subnetwork Overview
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
ESA Iris Programme: status
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
European Organisation for the Safety of Air Navigation Helping AMHS Roll-out in Europe (HARE) SpeakerRichard Papior OrganisationEUROCONTROL Date and venueJuly.
Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
TCP / IP and ATN in Europe Danny Van Roosbroek, EATM/DAS/CSM
1 centre dÉtudes de la navigation aérienne COMMON METRICS FRAMEWORK FOR ATM PERFORMANCE ASSESSMENT AND MONITORING Almira Williams, CSSI Inc.
1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
Service Technique de la Navigation Aérienne NexSAT: Institutional aspects 20 may, 2003 STNA/31 The EGNOS example: the issue The good example: The Tripartite.
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
GROUND BASED AUGMENTATION SYSTEM System Overview Christophe DEHAYNAIN Direction Générale de l’Aviation Civile FRANCE.
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
The Future of PETAL Technology
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
Mission Trajectory Step 1 From planning to deployment.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Workshop on preparations for ANConf/12 − ASBU methodology
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Military Use of Data Link Phil Platt ATN2001, IEE, London
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B.
18-19 September 2001ATN2001 (London)1 A Commitment to ATN Implementing Aeronautical Data Link Today Presented by Kevin Wohlers ACI Program Manager.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
LINK2000+ Lifecycle Context Time Towards Implementation Standardisation Validation Trials Standards.
FAA/JCAB ATN & AMHS Trial Varadero, Cuba May 2002 Presentation ATN 3.2 by H. Tran.
BCI’s Aeronautical Telecommunication Network (ATN) Router
Network Management Management Tools –Desirable features Management Architectures Simple Network Management Protocol.
AMHS (ATS Message Handling System)
ATN Subnetwork Implementation:
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
NG/VITA Strategy & Architecture Tony Shoot
IPv6 integration with the ATN Tony Whyman Helios Information Services Ltd.
AMHS Interoperability
1 NORTHROP GRUMMAN PRIVATE / PROPRIETARY LEVEL 1 NG/VITA Strategy & Architecture NG/VITA Strategy & Architecture Tony Shoot December 19, 2006.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
Commonwealth of Massachusetts Executive Office of Health and Human Services EOHHS Infrastructure Consolidation and Rationalization October 2008.
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
ACP / WGN / SGN1 #7 th meeting March 2006 Migration of Surveillance Data to IP: An overview European Organisation for the Safety of Air Navigation Dimitris.
NG/VITA Strategy & Architecture Tony Shoot
AMHS (ATS Message Handling System)
ESA Iris Programme: status
Workshop on preparations for ANConf/12 − ASBU methodology
Presented by Thales Avionics ATN 2003 London, UK September 2003
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
International Cooperation
NG/VITA Strategy & Architecture Tony Shoot December 19, 2006
The Air Ground Datalink Server (AGDS)
Ground based ATN Router Requirements
European Training Needs
Presented at ICAO ACP WG-I By Robin Hughes
ATN Subnetwork Implementation:
ICAO ACP WG-N meeting Use of IP in ARTAS
P AIRPORT SURFACE DATALINK
Migration of Surveillance Data to IP: An overview
Presentation transcript:

ATN 99 Service Technique de la Navigation Aérienne 1 ATN Activities & Plans ATN in FRANCE FOR SAFETY REASONS MAIN FUTURE DATA/LINK ATSC WILL BE ATN

ATN 99 Service Technique de la Navigation Aérienne 2 ATN Activities & Plans ATN in FRANCE Till Now –ATNP Participation –ProATN router developement, upgrade and testing –ATN Systems Management Studies –Implementations Plans

ATN 99 Service Technique de la Navigation Aérienne 3 ATN Activities & Plans The ProATN Router Developed from the Airtel/Eurocontrol TAR-TTS –by an STNA team in the frame of the DNA/Sofréavia partnership in ProATN Distributed by Sofréavia and Airtel STNA MEDIAS development methodology (consistent with RTCA DO178B document) Build 1 delivered in March 98 Build 2 delivered in March lines of C code man.days

ATN 99 Service Technique de la Navigation Aérienne 4 ATN Activities & Plans ProATN Router Build 1 & 2 Build 1 –compliant to ICAO "Phuket" ICS SARPs –Improvements to TAR-TTS : Configuration, Supervision & Operator tools Administrative interface SNDCF module enhancements Documentation General code enhancements Build 2 –compliant to ICAO DOC 9705, Ed. 1.0 –Performance enhancements (multi-process)

ATN 99 Service Technique de la Navigation Aérienne 5 ATN Activities & Plans ATN Systems Management Active participation to ATNP work –SM CONOPS Editor –MIB Definition No products yet, but –Study integration of ATN management in current DGAC systems supervision –Study of SNMP Agent on ProATN Router –Local Manager MIB Browser, Alarm notification, Performance monitoring, configuration tool, etc. –Integration of ACI NMA Agent & connexion to ProATN NMS in the frame of ProATN project –Validation of ATNP SARPs

ATN 99 Service Technique de la Navigation Aérienne 6 ATN Activities & Plans Implementation Plans ACCESS Project ( ) –NATS, DFS, STNA cooperation (CEC Project) –Complete technical definition of Target ATN Network in European Core Area –Transition Plan/Issues to an Initial Network based on ODIAC D/L services + AMHS Eurocontrol/EATCHIP ATNI-TF ( ) –Business Analysis –Institutional & Administrative Structures –European ATN Implementation Plan

ATN 99 Service Technique de la Navigation Aérienne 7 ATN Activities & Plans ATN in FRANCE Now Implementation Strategy

ATN 99 Service Technique de la Navigation Aérienne 8 ATN Activities & Plans Implementation strategy Def. ATN infrastructure to support SCALA plans based on ACCESS results –choice of router hardware platform –addressing plan –dependability issues –systems management & security solutions –network dimensioning –Implementation/Validation of Package 2 SARPS –Eurocontrol Link2000+ Programme ATNI-TF work follow-up focussing on short-term ATN implementation

ATN 99 Service Technique de la Navigation Aérienne 9 ATN Activities & Plans Broadmap of french ATN Data-link servers (front-end to application servers) in ACC with an ES ATN stack Ground-ground Subnetworks -RENAR for WAN interconnected with others Networks belonging to EAN -Ethernet and/or FDDI for LAN Air-Ground Subnetworks: -VDL2 stations operated by CSPs -AMSS after BIS ATN A/G and G/G

ATN 99 Service Technique de la Navigation Aérienne 10 ATN Activities & Plans Pending questions VDL scenario: A/G BIS ATN belonging to DGAC or CSPs ? (G/G BIS belonging to DGAC) AOC trafic supported by infrastructure: link with VDL scenario Performances Security Sites equiped with BIS or IS Router Reutilisation of current ISO routers

ATN 99 Service Technique de la Navigation Aérienne 11 ATN Activities & Plans CONCLUSIONS The technology is now ready for implementing ATN on ground side The results of ATNSI project will be decisive on airborne side ATN can be operational before 2005 if ATSOs and Airlines say alltogether « GO »