Optimism Bias in Major Infrastructure Projects Dr Eamonn Molloy

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Hugh Kelly Cohesion Policy evaluation – Cost and time estimates of major projects Warsaw 30 November.
Public Private Partnerships and Development Razvojni program ujedinjenih nacija.
The Case for a Business Case
Constructing Mobility Futures: The Case of HS2 Murray Goulden Robert Dingwall 1.
The Business Plan.
Construction Industry Council Economic Forum Stephen Dance UNCLASSIFIED.
The ISSUE Conference 11 th February 2014 The Local Authority View Challenges facing transport planners Ian Drummond Leicestershire County Council.
Project Management.
Introduction and the Context The Use and value of Urban Planning.
Macro-Fiscal Forecasting Sami Yläoutinen Fiscal Affairs Department (IMF) & METAC Workshop on MTFF December 16 th –19 th, 2014, Beirut, Lebanon.
Institute for Transport Studies FACULTY OF EARTH AND ENVIRONMENT The Economic Evaluation of Transport Projects Seminar Madrid, November 2010 Current.
Supporting people with a learning disability Introduction to Project Management Presenter: Steve Raw FInstLM, FCMI.
Chapter 7: Managing Risk
Model Building and Simulation Chapter 43 Research Methodologies.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Software Project Risk Management
The Importance of Economic Census Data for Federal Policy Katharine G. Abraham Member, Council of Economic Advisers Hi-Beams for the Economic Road Ahead.
Steve Paulone Facilitator Financial Management Decisions The financial manager is concerned with three primary categories of financial decisions:  1.Capital.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
Wales Infrastructure Investment Plan Gerald Holtham Adviser to Welsh government.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Risk Management - ACostE Kate Boothroyd FIRM Director, KB Risk Consulting Limited.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
McGraw-Hill/Irwin Strategic Management, 10/e Copyright © 2007 The McGraw-Hill Companies, Inc. All rights reserved. Logistyka w strategiach rynkowych Element.
1 TenStep Project Management Process ™ PM00.7 PM00.7 Project Management Preparation for Success * Manage Risk *
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
Transport Economics Resource Allocation in Transport.
Portfolio Management Unit – II Session No. 11 Topic: Investment Policy Statement Unit – II Session No. 11 Topic: Investment Policy Statement.
Risk and Procurement These slides have been added to the standard MRU PM Cert materials and are made available to students who have attended my class.
Demand in Business Forecasting Application of the law of demand is not simple or we would not be here. In a highly competitive world, successful application.
An introduction to smart investment solutions: the case of PPP Twinning project Public Agency for Rail Transport of Republic Slovenia Daniel Loschacoff.
Civilution Congress 2014 CESA: Break-Away Plenary Session Panel Discussion 1 Infrastructure Procurement Civilution : Best Practice Approach PROCUREMENT.
1 © 2013 HCL – Proprietary & Confidential HCL EAS delivers many transformational SAP projects across Europe  Over 1700 dedicated SAP specialists are based.
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
UNECE – SC2 Rail Security Analysis and economic assessment of rail transport security 1st October 2009 Andrew Cook.
TRAFFIC FORECASTING FOR PORT OPERATIONS. TRAFFIC FORECASTING The essence of port traffic forecasting is to attempt to forecast (predict): (a) What kinds.
Dolly Dhamodiwala CEO, Business Beacon Management Consultants
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
Daniel Loschacoff, Ministry of Finance, PPP Unit 20th of October 2005 PPPs in the Netherlands, policy and practice.
THE SUPERVISOR AS A FINANCIAL MANAGER
Roland Gilbert BSc MRICS; Prince 2 Practitioner
Uncertainty Analysis in Capital Investment Planning and Execution
1.5 Entrepreneurs and leaders Role of an entrepreneur
Explain the step-by-step process of rational decision making
Contents Targets and investment needs Defining climate finance
PUBLIC POLICY AND EFFECTIVE CITIZEN PARTICIPATION
Changes and Benefits brought from Modern Procurement to Bridge the Infrastructure Gap Remo Bucci, P.Eng Infrastructure and Capital Projects October 27,
EWG Study Tour, Galway, 18/09/2006
Can banks de-risk programmes?
Project risk management
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
HUMAN RESOURCE GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE
RISK MANAGEMENT IN MUNICIPALITIES
Software engineering Lecture 21.
Master Budget and Responsibility Accounting
Project Management for Developing Countries
MARKET RESEARCH.
Roy Endré Dahl, Sindre Lorentzen, Atle Oglend, Petter Osmundsen
Intro to Financial Management
Project Risk Analysis and Management: L3
Construction Projects
2009 Minnesota MPO Conference August 11, 2009
THE SUPERVISOR AS A FINANCIAL MANAGER
RISK MANAGEMENT MARKET & SOCIAL RESEARCH
Uncertainty Analysis in Capital Investment Planning and Execution
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Optimism Bias in Major Infrastructure Projects Dr Eamonn Molloy Presentation to: International Consulting Economists Association London 18th January 2010

Projected infrastructure spending by region - US$ ’000bn, 2005-2030 9.2 6.5 0.9 15.9 7.5 1.1 Source: Cohen & Steers Global Infrastructure Report 2009: The $40 Trillion Challenge

Planned UK infrastructure investment 2010 -11 to 2014 - 15 Total 195 Source: HM Treasury, Infrastructure UK (values in 2008-09 prices)

Characteristics of major infrastructure Inherently risky Technology and design often non-standard Decision-making, planning, management are complex Project lock-in or capture at early stage Scope and ambition changes over time Budget and contingencies often inadequate Misinformation about costs, benefits and risks is the norm, including business case Cost overrun and benefit shortfalls during implementation

Inaccuracy of transportation project cost estimates by type of project (in constant prices) No. of cases Avg. cost overrun % Standard deviation Rail 58 44.7 38.4 Bridges & Tunnels 33 33.8 62.4 Road 167 20.4 29.9 For transportation mega-projects… 9 out of 10 projects have cost overrun Overrun is found across 20 nations and 5 continents Overrun is constant for the 70-year period of the study Cost estimates have not improved over time Source: Flyvbjerg, 2007

Inaccuracy of forecasts of rail passenger and road vehicle traffic Type of project No. of cases Avg. error % Std dev Rail 25 -51.4 28.1 Road 183 9.5 44.3 84% of rail passenger forecasts are wrong by > +/- 20% 9/10 rail projects overestimate traffic 50% of road traffic forecasts are wrong by > +/- 20% No. of roads with overestimated and underestimated traffic is about the same Inaccuracies are global Inaccuracies are constant over last 30 years Source: Flyvbjerg, 2007

Why is this a problem? Cost overruns and benefit shortfalls are a problem because: Leads to a pareto-inefficient allocation of resources, i.e. waste Leads to delays and further cost overruns and benefits shortfalls They destabilize project management The problem is getting bigger because projects are getting bigger

Garbage in = Garbage out Example: Channel Tunnel Longest underwater rail tunnel in Europe, connecting France and UK At IPO, Eurotunnel told investors: “10% would be a reasonable allowance for the possible impact of unforeseen circumstances on construction costs.” Actually… 80% over construction costs, 140% over for financing. Revenues half of those forecast, IRR at -14.5% Economy would have been better off if the Tunnel was never constructed Solution: Fire the forecasters?

Explanation 1: Technical Imperfect forecasting techniques Inadequate data Honest mistakes Inherent uncertainty in predicting the future Lack of skills, knowledge, experience of forecasters Solution: develop better forecast models, better data, training forecasters and PM’s.

Explanation 2: Psychological: Planning Fallacy and Optimism Bias Managers make decisions based on delusional optimism rather than rational weighting of gains, losses and probabilities Overestimate benefits and underestimate costs Spin scenarios of success and avoid considering potential mistakes and miscalculations Ubiquitous cognitive bias Solution: Simple reality checks

Explanation 3: Political Economic Planners and promoters deliberately and strategically overestimate benefits and underestimate costs This increases the likelihood that their projects, not competitors will be selected Emphasize success scenarios and downplay failure scenarios Lying and corruption pays off… Solution: Accountability

Survival of the Un-fittest… underestimated costs overestimated benefits + = funding

The Outside View: Reference Class Forecasting Identify a relevant reference class of past projects Broad enough to be statistically relevant, narrow enough to be directly comparable Establish a probability distribution for the selected reference class Needs credible, reliable data Compare project with reference class distribution Establish most likely outcome for the project Source: Flyvbjerg and Cowi, 2004  

Inaccuracy of construction cost forecasts for rail projects in reference class. Source: Flyvbjerg, 2007

Example: Edinburgh Tram Line 2 (2004) Initial cost estimate of £320M made by planners was adjusted for optimism bias and acceptable risk using a probability distribution. Resulted in revised cost estimate of £400M Included contingencies to insure against cost overruns at the 80% level (i.e., 20% risk of cost overrun) If Scottish Parliament accepted a 50% risk of overrun then cost estimate including contingencies could be lowered to £357M Approach now being applied on other projects, e.g., Crossrail London, estimated £16 Billion.

Summary Major Infrastructure / Mega Project spending set to increase globally Effective delivery is crucial – failure has major economic consequences Optimism bias and Strategic misrepresentation a significant contributory factor in overestimation of benefits and underestimation of costs Reference class forecasting and the outside view can mitigate this when supported by appropriate governance and accountability

Thankyou eamonn.molloy@pmb.ox.ac.uk