Community Path Project

Slides:



Advertisements
Similar presentations
Ukraine, Кyiv, 2013 Presentation of LLC SERVICE-NS: Reliable and uninterrupted technical service of filling stations and petroleum storage depots, providing.
Advertisements

Earth Control Measures at Project Detail Site Location Marina Barrage.
Mashpee Land Stewards Program. Goals of the Mashpee Conservation Department To protect our water resources, plant and wildlife habitat and to preserve.
Leasehold Forum Landscape Services 22 January 2015.
Tree Planting MMXI.
ANTHONY INDEPENDENT SCHOOL DISTRICT Al Flores Jr., Director Maintenance and Operations Department 620 Sixth Street, Anthony Texas, Phone: (915)
Safety hazards common to pruning. Objective To help workers recognize, prepare for, and prevent hazards common to pruning SAFETY SCHOOL > Information.
With Good Flow Data: Greater control Decisions grounded in facts Needs clearly prioritized Remove the risk from planning.
Exterior Lighting Exterior Lighting Preventing Injuries and Increasing Security By Maintaining Effective Lighting.
Irish Amateur Rowing Union Applications for Sports Capital Grants.
Standard of Care California Health & Safety Code § § Consumer Product Safety Commission (CPSC) Pub. No. 325 –Handbook for Public Playground.
Risk Management Presentation CEIST Conference September 2010 Adrian Sutton, Sutton Health and Safety Services.
SQF ISO FSSC GMP Programs
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
SA Power Networks Strategic Vegetation Management Alexandra Lewis, Vegetation Strategy Lead LGA Roads and Works Conference – 28 August 2014.
 1 Supervisor  1 EOIII  1 EOII  2 EOI  2 Maintenance Worker  Total Annual Labor Cost: $324,845  Includes Overhead.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Tree Inspection & Maintenance of Highway Trees Al Smith Corporate Services Manager L.B.Camden.
GREEN BUDGET SCRUTINY KEITH GARLAND OPERATIONAL MANAGER PARKS AND HORTICULTURAL SERVICES.
Highway Maintenance – Lengthsman and other options Andy Stevenson Highways and Drainage Manager.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Dog Fouling – CFYA Services Craig Willows – Service Development Manager.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
The Pipeline Safety Trust “Restoring Trust In Pipeline Safety” New Orleans, LA November 2-3, 2006 Nate Muehl Damage Prevention & ROW Relations Manager.
Maintenance 14 chapter. Maintenance as a Management Function Maintenance as a management function can be a critical contributor to facility use. If not.
Service Level Planning Protection of Assets and You Shane Walden Wyndham City Council.
Identifying Specialized Hand Landscape Tools & Their Functions
Optimising Stormwater Management BH:
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
1958  Construction began on a new fire hall, adjacent to property known as Fireman’s Park.  The City entered into a contract to construct a firehouse.
Chapter 14 Maintenance. Maintenance as a Management Function Maintenance as a management function can be a critical contributor to facility utilization.
Exterior Maintenance and Cleaning
Inspection Davenport IA
Jason Gates and Andy Jennings Bureau of State Risk Management
Disaster Mitigation Techniques for Householders
Management and Maintenance of the Local Path Network
Recreation and Burial Committee
7.2 Coping with crop conserving machine equipment
SAVANNAH AT TURTLE ROCK
20th National Trails Symposium
How can you Maintain an Acrylic Sports Surface
FIELDCRAFT RECRUIT Created by LCDT Stewart. FIELDCRAFT RECRUIT  State the AAFC Environmental Management requirements and country code of conduct  Describe.
LINE CLEARANCE TREE TRIMMING OPERATIONS Quad State Instructors, Inc.
Works and Services Supervisor
Management of Change Report Errors to Management.
Ageing Management Session Name: Principles of Ageing Management
With Good Flow Data: Greater control Decisions grounded in facts
Safety is part of our culture at Halliburton
Safety hazards common to pruning
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
Community Path Project
2007 Hurricane Season Preparedness Briefing
Fairlington Green Association
Joint Finance Committee/ Council May 21, 2018
FY 2020 Community Grants Training
Line Clearance Tree Trimming Operations
Exterior Maintenance and Cleaning
AVOIDING ROADWAY AND PARKING HAZARDS
SAVANNAH AT TURTLE ROCK
Session 2-B Applying for and Implementing a Grant
Repair And Maintance of Buildings
Hints & Tips for Completing Grant Applications
Workshop: Equipment June 29, 2006.
Friends of Saintbridge Pond Annual General Meeting 2016
Estate Worker – Home Park – Windsor
Estates and Neighbourhood Services
Alpena School District Academic Facilities Partnership Program
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

Community Path Project Marywell Community Path Project David Younie Birse & Ballogie Community Council

Planning and building the path Sourcing the funds Ballogie Estate willing to offer in-kind support (path materials, shrub clearance) Planning gain funds Ballogie Community Association own funds Commercial donations via Birse & Ballogie Community Council Awards for All (Scotland) grant of £10000 Total funds confirmed: £24,712 incl. in-kind contributions Total cash funds confirmed (i.e. excl. in-kind contributions) £19,096

Future proofing the path Make sure it is well designed and constructed

Future proofing the path Make sure it is well designed and constructed Public liability insurance Included in Ballogie Community Association public liability insurance Maintaining the path Maintenance protocol essential for public liability insurance Community path maintenance group formed

Maintaining the path

Path Maintenance Schedule Annual Maintenance Tasks Frequency Detail Responsibility 1. Path Survey and inspection 9 Inspect path to monitor implementation of routine maintenance schedule and identify any un-programmed work due to unforeseen circumstances e.g. weather impacts, vandalism etc BCA 2. Path edges 2 0.5m strip either side of path edge cut by strimmer/ scythe June and September 3. Path surface Once every 2 years Spray with approved herbicide to maintain 2m path width, between May and September (or when necessary) 4. Trees 1 Inspection of trees within falling distance of path by suitably qualified person for safety and take appropriate action where required. Once yearly but especially following high winds. BEE 5. Litter and dog fouling Monitoring undertaken as 1 above. Appropriate action where required. 6. Drains Inspection undertaken as 1 above. Clear and repair where required. 7. Boundary structures (fences/walls and gates) 8. Site signs and barriers Every 3 years Rolling programme of preventative maintenance. Replacement as and when required. 9. Pathside tree, bushes and shrubs Every 5 years Rolling programme of trimming and pruning overhanging branches to maintain 3m wide path corridor.

Weed control BCA has recently been awarded a grant of £1500 from ‘Paths for All (Scotland) for purchase of maintenance equipment Strimmer/brushcutter/shrubcutter Leaf blower Secateurs and pruning shears Knapsack sprayers Protective clothing

Thank you for your attention