Risk Ranking : An Example Process and Method www.STRUCTINT.com 877-4SI-POWER Nuclear Cable Workshop August 6-7, 2012 Richmond, VA Shane A. McManus Senior.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Slide 1 Insert your own content. Slide 2 Insert your own content.
Chapter 13: The Systems Perspective of a DSS
The 4 T’s of Test Automation:
Systems Security Engineering An Updated Paradigm INCOSE Enchantment Chapter November 8, 2006 John W. Wirsbinski.
Introduction to Product Family Engineering. 11 Oct 2002 Ver 2.0 ©Copyright 2002 Vortex System Concepts 2 Product Family Engineering Overview Project Engineering.
Integrating the NASP Practice Model Into Presentations: Resource Slides Referencing the NASP Practice Model in professional development presentations helps.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Best Available Techniques (BAT)
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Future strategy for e-submission as seen by industry Dr Michael Colmorgen, IFAH-Europe 2nd Veterinary Workshop on E-submission 4 Dec 2009, EMEA, London.
Phytosanitary Risk Analysis – the New Zealand Experience
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
0 - 0.
1 9 Moving to Design Lecture Analysis Objectives to Design Objectives Figure 9-2.
1 PHOENICS User Conference 2004 Applying CFD to Environmental Flows Eric Jal Connell Wagner, Melbourne, Australia 3-5 May Melbourne, Australia.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 14 Slide 1 Object-oriented Design 1.
Configuration management
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Effective Test Planning: Scope, Estimates, and Schedule Presented By: Shaun Bradshaw
Discrete Controller Design
S-Curves & the Zero Bug Bounce:
Testing Workflow Purpose
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
SOGAT 2012 The Shah Gas Development Project
Marketing Research and Information Systems
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
Environmental Management Systems Refresher
Risk The chance of something happening that will have an impact on objectives. A risk is often specified in terms of an event or circumstance and the consequences.
Slide 1 COST Action TU 1002 – Edinburgh, October 2011 THE EFFECTS OF DECISION-MAKING ON URBAN FORM, A TOOL FOR SUPPORTING PLANNING PROCESSES Matteo.
Occupational Health and Safety Workplace Inspection Training HS7_
A GIS-Based Decision Support System for Optimal Renewal Planning of Sewers INFRA November 2007 Québec Mahmoud Halfawy, Leila Dridi, & Samar Baker.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Internal Control–Integrated Framework
Prescriptive Process models
European Roadmaps for Research Infrastructures presentation by Hans Chang (chair ESFRI) (1st meeting ESFRI Steering Groups, autumn 2005)
PROJECT RISK MANAGEMENT
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Overview of Key Rule Features
Risk Management Chapter 7.
Software Engineering Metrics for Object Oriented Programming Developed by – Shrijit Joshi.
Copyright © 2007 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Benefits of an Integrated Compliance.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
DELIVERING SAFE & RELIABLE OPERATION
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Engineering Productivity Measurement Research Team Engineering Productivity Measurement Research Team Bob Shoemaker BE&K Bob Shoemaker BE&K CPI Conference.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
Risk Management for Technology Projects Geography 463 : GIS Workshop May
Ranga Rodrigo. The purpose of software engineering is to find ways of building quality software.
Management & Development of Complex Projects Course Code MS Project Management Perform Qualitative Risk Analysis Lecture # 25.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
SUSTAINING THE ANALYSIS Module 2 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Lecture 7 Risk Analysis CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Technical Support for the Impact Assessment of the Review of Priority Substances under Directive 2000/60/EC Updated Project Method for WG/E Brussels 22/10/10.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
BSBPMG508A Manage Project Risk Manage Project Risk Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG508A.
Failure Modes, Effects and Criticality Analysis
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Design Engineering 1. Analysis  Design 2 Characteristics of good design 3 The design must implement all of the explicit requirements contained in the.
Risk Management for Technology Projects
Flooding Walkdown Guidance
Risky Business Standalone ISO9001:2015 Risk-Based Thinking and Integration of Risk Management with ISO9001:2015.
Project Management Group
Distribution Integrity
Presentation transcript:

Risk Ranking : An Example Process and Method SI-POWER Nuclear Cable Workshop August 6-7, 2012 Richmond, VA Shane A. McManus Senior Engineer, SI

Risk Ranking: An Example Process and Method - SLIDE 2 Objectives Project Basis Cable Aging Management Tools Yard Cable Assessment Data Handling Risk Ranking Inspection Prioritization Concepts within a Building

Risk Ranking: An Example Process and Method - SLIDE 3 Determine Scope – Define which cable / connector components (MV, LV, Instrument, EQ and/or non-EQ, splices, etc.) are within the scope of the program at each plant. Data Collection/Integration – Relevant data, whether from existing databases (e.g., cable, operating experience, corrective action) or other sources are collected and organized. Risk Ranking – A risk assessment is performed to gain insights that best focus station resources in a way that mitigates the likelihood of failure and potential consequences of failure. Inspection Planning – Develop risk prioritized inspection walkdown scope and most appropriate tests based on environment, service conditions and materials of construction. Determine Scope Data Collection and Integration Risk Ranking Inspection Planning Baseline Phase – Scoping & Prioritization

Risk Ranking: An Example Process and Method - SLIDE 4 Project Basis NUREG/CR-7000 –Select cables to be monitored. –Develop database for monitored cables. –Characterize and monitor service environments. –Identify stressors and expected aging mechanisms. –Select condition monitoring techniques suitable to monitored cables. –Establish baseline condition of monitored cables. –Identify cable characteristics and aging effects being monitored by each selected condition monitoring technique. –Perform test and inspection activities for periodic condition monitoring of cables. –Periodically review and incorporate plant and industry experience. –Periodically review, assess, and trend the condition of monitored cables. –Identify degraded conditions and take prompt corrective actions.

Risk Ranking: An Example Process and Method - SLIDE 5 Cable Aging Management (CAM) Tools

Risk Ranking: An Example Process and Method - SLIDE 6 Yard Cable Assessment Example - GIS Tools

Risk Ranking: An Example Process and Method - SLIDE 7 Visualization of Cable Information A visual representation of cable database information (inspection & risk results, drawings, PDF or pictures) through a GIS interface can offer the following benefits. –Visual review and analysis of data allows for multi-variant analysis and the recognition of patterns not possible with tabular information. –Combinations of cable information (layers) can be selectively turned on by user. Simply clicking on a feature reveals a table of information relevant to the cables in that area. –View assets associated with a specific cable or other information near cables (pipes, equipment, tanks, etc.) that may potentially contribute to degradation, such as from leakage. –Data can help facilitate inspection planning. –For underground cable, the risk associated with accidental contact during excavations (associated with fencing installation, buried pipe excavations, monitoring wells and other modifications) can be minimized.

Risk Ranking: An Example Process and Method - SLIDE 8 SQL Database CAM Solution

Risk Ranking: An Example Process and Method - SLIDE 9 CAM Foundation and Design Inputs Raceway Cable Type Equipment

Risk Ranking: An Example Process and Method - SLIDE 10 Dynamic Segmentation

Risk Ranking: An Example Process and Method - SLIDE 11 Risk Calculations

Risk Ranking: An Example Process and Method - SLIDE 12 Risk Calculations

Risk Ranking: An Example Process and Method - SLIDE 13 Walkdowns, Inspections, and Testing Based on the raw risk data derived from the CAM Algorithms and the IsoRisk graphs a few observations were made: –MV submerged cables selected for testing and inspections per GALL AMP X1.E3. –Cables with the highest ROF values selected for walkdowns. Walkdown results dictated further inspections and testing. –Cables with the highest LOD selected for inspections. Overall COF was low. Did not impact plant operability. Located in more adverse environments. Sentinel concept implemented and results extrapolated.

Risk Ranking: An Example Process and Method - SLIDE 14 Building Interior Cable Concept

Risk Ranking: An Example Process and Method - SLIDE 15 Conclusions NUREG/CR-7000 CAM Program Elements Addressed –Select cables to be monitored. –Develop database for monitored cables. –Characterize and monitor service environments. –Identify stressors and expected aging mechanisms. –Select condition monitoring techniques suitable to monitored cables. –Establish baseline condition of monitored cables. –Identify cable characteristics and aging effects being monitored by each selected condition monitoring technique. –Perform test and inspection activities for periodic condition monitoring of cables. –Incorporate plant and industry experience. –Periodically review, assess, and trend the condition of monitored cables. –Identify degraded conditions and take prompt corrective actions.

Risk Ranking: An Example Process and Method - SLIDE 16 Questions?