construction and tests

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
1 March 27, 2007 IHEP RPC Bakelite Resistivity in-Situ Test Results and Strip Plane Considerations W. Sands, C. Lu and K. McDonald Princeton University.
Status on the VELO sensors in the vacuum chamber Gwen & Ray 08/14/2007.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Measuring Leakage Current on Singles and Ladders P. Riedler and S. Ceresa, August 2005 Sensor Chip Manipulator Needle for sensor back side contact Probe-card.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Update on the new reconstruction software F. Noferini E. Fermi center INFN CNAF EEE Analysis Meeting - 14/09/20151.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
First detection of extensive air showers with the EEE experiment CRIS 2010, Catania, September  Introduction to EEE project  The MRPC detector.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Tests of RPCs (Resistive Plate Chambers) for the ARGO experiment at YBJ G. Aielli¹, P.Camarri¹, R. Cardarelli¹, M. Civardi², L. Di Stante¹, B. Liberti¹,
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
Preliminary search for long distance correlations in EEE
University of Wisconsin
(On Behalf of CMS Muon Group)
Extreme Energy Events collaboration
Dept. of Physics and Space Sciences, Florida Institute of Technology
Quality Control Chamber Production
Production ad Quality control of RPCs for the CMS muon barrel system
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Meeting at Erice Great success!
Preparation of the EEE telescope for Forbush decrease observation
Gas system Commissioning procedures and status
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
HF Test station at P5 A.Mestvirishvili.
Plots for the performance paper
Analysis and paper on chamber and telescope performance
Plots for the performance paper
Mini-Tower test results
GRPC activity for EuDHCAL in IHEP-Protvino
Multigap Resistive Plate Chambers (MRPC)
Same geometry, but different size of the rim
Update on coincidences
Study of Chinese oil-less chamber
Multigap Resistive Plate Chambers for EAS study in the EEE Project
Typical Arc Spray Installation
MRPC -High Time Resolution Detector R&D at USTC CHINA Chen, Hongfang 2001/Oct. Oct.2001, Beijing MRPC,USTC.
Clicker #1 Is the pressure in the larger balloon greater than, less than, or equal to the smaller balloon? A) greater than the smaller balloon B) less.
Clicker #1 Is the pressure in the larger balloon greater than, less than, or equal to the smaller balloon? A) greater than the smaller balloon B) less.
Clicker #1 Is the pressure in the larger balloon greater than, less than, or equal to the smaller balloon? A) greater than the smaller balloon B) less.
Clicker #1 Is the pressure in the larger balloon greater than, less than, or equal to the smaller balloon? A) greater than the smaller balloon B) less.
SEM Calibration in H6 Beam Line, 20cm Cupper Target
Clicker #1 Is the pressure in the larger balloon greater than, less than, or about equal to the smaller balloon? A) greater than the smaller balloon B) less.
EEE telescope simulation
Clicker #1 Is the pressure in the larger balloon greater than, less than, or equal to the smaller balloon? A) greater than the smaller balloon B) less.
I.I.S. Alessandro Volta, Lodi
(On Behalf of CMS Muon Group)
Resistive Plate Chambers performance with Cosmic Rays
Spare Chambers Proposal: send them at INFN Bologna
DRAFT IVECO DAILY Tachograph DSRC antenna installation requirements basic info for Body Builders
DRAFT IVECO DAILY Tachograph DSRC antenna installation requirements basic info for Body Builders
DRAFT IVECO DAILY Tachograph DSRC antenna installation requirements basic info for Body Builders
Status report MEG DC 20/6/06 Test in COBRA Hajime,Matthias,Johny Peter : beam, Wataru : COBRA Necessary Modifications in DC.
DRAFT IVECO DAILY Tachograph DSRC antenna installation requirements basic info for Body Builders
DRAFT IVECO DAILY Tachograph DSRC antenna installation requirements basic info for Body Builders
A DLC μRWELL with 2-D Readout
Risk Management Student Powerpoint
Liceo Scientifico “A. Volta”
Presentation transcript:

construction and tests EEE Upgrade 2018: construction and tests

33 MRPCs built All of them 6 gaps 250 um + 5 glasses 280 microns 20170222001 LAMP-01 20170223002 LAMP-01 20170225003 LAMP-01 20170314004 GENO-01 20170316005 GENO-01 20170317006 GENO-01 20170405007 SIEN-02 20170406008 SIEN-02 20170407009 SIEN-02 20170425010 CARI-01 20170426011 CARI-01 20170427012 CARI-01 20170509013 TORI-05 20170510014 TORI-05 20170511015 TORI-05 20170523016 LODI-03 20170524017 LODI-03 20170524018 LODI-03 20170719019 spare – ROMA-01 20170921020 spare – FRAS-01 20170926021 CAGL-04 20170927022 CAGL-04 20170928023 spare 20171026024 spare – COSE-01 20171121025 BOLO-05 20171123026 BOLO-05 20171124027 BOLO-05 20180221028 CAGL-04 20180222029 spare 20180227030 spare 20180228031 spare 20180320032 spare 20180322033 spare All of them 6 gaps 250 um + 5 glasses 280 microns

Test during the constructions: Tests flow Test after constructions: Gas tightness Efficiency Dark rates Dark currents Test during the constructions: HV strips Delivery If any problem

Tests during the constructions HV The good quality of HV contact on electrodes is ensured by carbon tape (black) between contact and glass. The upper electrode is the negative. The electrodes are properly labeled for avoiding mistakes during the telescope installation

Tests during the constructions Flat cables are prepared in advance. Right orientation is taught and checked during soldering. Unused twisted pair are tied. Strips Solderings are checked both for 1. mechanical strength 2. right order several times and by different people

Tests during the constructions Good electrical connections are tested on both sides. The test is repeated: 1. with dummy connectors before closing the chamber 2. after laying the chamber within the chassis 3. after chassis closing Strips

Gas tightness tests The gas tightness test is performed as follows: 1. 100 ml of air are injected during each step up to 2 mbar of overpressure 2. Volume vs Pressure curve is measured 3. the chamber is closed and the Pressure variation vs time is measured 4. corrections for volume variation due to Temperature are applied 5. the volume time derivative is the estimated leakage 100 ml syringe Differential Manometer

Gas tightness tests

Gas tightness tests Extraction of the leakage flux: pressure decrease vs time exponential behaviour allows to measure the chamber leakage at ΔP~1 mbar close to operating conditions

Gas tightness tests: trends LAMP-01 GENO-01 SIEN-02 CARI-01 TORI-05 LODI-03 S CAGL-04 S BOLO-05 S S S

Gas tightness tests: Leak distribution L/h

Efficiencies/Dark Rate/Dark Current Efficiency is measured for the 3 chambers laying on CERN-01 (green). Chambers are fluxed 4 days before measurements. The trigger is the CERN-01. The data sent to DAQ come from CERN-01 bottom and middle chamber and one of the chambers under test. By reconstructing tracks triggered by CERN-01, hits on tested chamber are searched. 74 64 54 Data 44 Trigger (OR 24) 44

Efficiencies/Dark Rate/Dark Current A typical 3 chamber-set parameters