Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.

Slides:



Advertisements
Similar presentations
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
Advertisements

2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
Non Powell Bill Street Repair & Maintenance Strategies October 8, 2012.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
1 Town of Tillsonburg Lifecycle/Capital/Debt Strategy.
Montwood Street & Drainage Improvement Project Solicitation No November 26, 2012.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Air Estates/Bald Eagle Estates) Improvement Project December 13, 2010.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
STA Safety Project PID #76439 December 12, 2006.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
EA204 Environmental Technology Stormwater Management Lot Grading & Easements.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
Options to Address Stormwater, Road and Septic Issues.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Welcome Open House Public Information Session Reconstruction Project Brunswick Avenue (Guelph Street to Blucher Street) Guelph Street (Ellis Avenue to.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Town Road Improvement Project Plan
Board of Commissioners Meeting
Limited Service Agreements
2016 Mill and Overlay Project
2nd Street Drainage and Paving Improvements
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Agenda Updates to Driveway and Sidewalk specifications and permits
Roadway Pavement Management Plan
Roads Operations, Public Works
Town of Brighton, Department of Public Works
Welcome to the Libertyville Stormwater Master Plan Open House
Jefferson County SA Red Rocks Site Approval
General Road Construction Information
Location Map.
2017 Reconstruction of Northfield Street
City of Bloomfield Hills
Public Information Meeting NW 100th Street Reconstruction Project
Consolidated Plan Amendment Wednesday, May 10, 2017
City of Saginaw Curb Side Leaf Collection Update
Issaquah-Fall City Road
Dunleith Lane drainage Spring 2015
Participatory Road Program neighborhood meeting Donahoo 174th Street
SE 12th Street Roadway Improvements February 8, 2005.
Site Design •Project Site context Module 3: •Site Analysis
1200 West Widening and Reconstruction Project
Meadow Lake Boulevard Street Extension Project
Meadow Lane – Brandon Road Improvements Welcome!
Walker Street Reconstruction Project 25% Design Public Hearing
Robincrest/Elmgate/ Linneman Improvements Welcome!
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Larimer County: engineering
Presentation transcript:

Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018

Introduction and Meeting Format Introduce Project Staff Meeting Format: Presentation (About 10 minutes) Questions and Answers with Project Staff Handouts Project Questionnaire and Comment Card Sign-in Sheet (Important Contact Information) Construction Frequently Asked Questions

Project Overview Utility Improvements Road Construction Drainage Improvements

Utility Improvements Village is reviewing the condition of the existing sanitary sewer and water main and considering maintenance / reconstruction to be completed with the project. Sanitary sewer and water main maintenance / reconstruction is not currently assessed by the Village Policy.

Road Construction Existing roadways are in fair to poor condition. PASER ratings are from 3-4. Soil borings indicate inadequate base course depth and buried topsoil. No sidewalks are being considered at this time. New asphalt surface will be paved. Roadway resurfacing is not assessed per current Village Policy. Option #3 to reconstruct the roadways is the recommended option.

Ditching vs. Curb and Gutter Typical Sections

Drainage Improvements Existing Conditions Existing drainage is by roadway ditches and drainage ways between houses / along the backs of houses. Existing ditches have limited standing water, but some are shallow, causing heaved culverts. Sideyard / Backyard drainage ways – No improvements planned

Drainage Improvements Option #1 – Do Nothing Minimizes impact to properties, only roadway would be resurfaced. Any areas of standing water would not be addressed. Existing culverts that are heaved would likely heave again after roadway is resurfaced.

Drainage Improvements Option #2 – Limited Ditch Cleaning and Culvert Replacement This option would include replacing culverts that are heaved / in poor condition and ditch cleaning to a depth of 2’ per the Village Standard. Ditches with standing water would also be cleaned to drain. Culverts filled with sediment would be cleaned.

Drainage Improvements Option #3 – Ditch Reconstruction This option would include replacing most or all culverts . Ditches would be reconstructed to Village Standard depth of 2’. Would likely require temporary grading easements from residents. May require ditching along drainage ways between houses. Could impact trees, landscaping, etc. within right of way.

Drainage Improvements Option #4 – Curb and Gutter with Storm Sewer This option would include reconstructing the roadways with curb and gutter and storm sewer. Storm water treatment would be required. Costs for 100% of curb and gutter and 30% of storm sewer / 100% of mini-storm sewer would be assessed to property owners on a per lot basis per Village Policy.

Curb and Gutter Option Right of Way is 50’ – 60’ Wide Roadway is shown as 32’ from back of curb to back of curb per Village Standard

* = Cost Without Pond, ** = Cost With Pond Next Steps Drainage Improvements Preliminary Estimates (All Options Include Reconstructing Roadway) * = Cost Without Pond, ** = Cost With Pond Next Steps Complete and Return Questionnaire Ask Questions of Project Staff Option Preliminary Cost Assessment Per Lot Option # 1 – Do Nothing $405,000 $0 Option # 2 – Limited Ditch Cleaning / Culvert Replacement $500,000 Option # 3 – Ditch Reconstruction $825,000 Option #4 – Curb and Gutter with Storm Sewer / Pond $1,040,000 *$4,900 - $5,500 **$8,800 - $9,400

Project Timeline Public Informational Meeting – November 7, 2018 Gather Property Owner Questionnaires – November 2018 Utility Condition Review – November / December 2018 Village Board Determination of Project Scope – December 2018 Design – Winter 2018 / 2019 Bidding – Winter / Spring 2019 Board Budget Funding Approval – Spring 2019 Construction – Summer 2019

Updates and Contact Information How are you going to know what is going on? Village Website Direct Mailings Door Hangers Bi-Weekly Project Updates during Construction Stop into our office at W482 Clifton Road