Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
LHC Status Tue Morning 22-Aug
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Day :00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Monday 21st January & night
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 11/07: Recovery Plenty of accesses.
Coordination: G. Arduini, E.B. Holzer, J. Jowett
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Overview LHC Operation Week 47
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Thursday morning 09:30 Dump of pPb fill.
Summary of Week 16 G. Arduini, J. Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
LHC Operations overview Week 28 – Getting back
Week 35 – Technical Stop and Restart
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Friday 23rd March 08:00 Access
Programme for Saturday 10 July
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary week 18 Intensity ramp up & production
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday – Morning Energy matching at injection with H CODs
Programme for Friday 9 July
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Cold compressor speed S45
LHC Status Tue Morning 22-Aug
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Friday morning 08:00 Stable beams with 840b.
LHC Morning Meeting - G. Arduini
Wednesday 23/2 Thanks CRYO!!!.
LHC Status Fro Morning 9-Sep
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday – Morning and Evening
RAMP FOR COLLIMATOR SETUP
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Saturday 26 November 2011.
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Monday Morning – recovery from cryo. 11:00 Injection, orbit FB gain test @ 450 GeV, test dump. Ramp for test dump and orbit FB test @ 3.5 TeV Beam lost on RF trip M2B1, line 7B1 cathode klystron current too high. 14:00 Back at injection – trip of undulator. Lost cryo conditions in matching section L4. 15:30 Performing a ‘pre-cycle with beam’ (2 bunches) of the matching section. 16:15 Orbit FB gain tests at 3.5 TeV. 17:00 Again beam lost on RF, this time M1B2. Loss of communication with PLCs. 1/1/2019 LHC 8:30 meeting

Orbit FB test - motivations Orbit transients at the ‘matched points’ (where we pass a matched optics) – issue for tight collimators. Transients are due to mis-match of the Xing and separation bumps due to optics interpolation between matched points. LHCb Xing bump of 250 urad is driving source ! Simplest cure: faster orbit FB for better damping… Beam 1 Squeeze to 1.5 m 1/1/2019 LHC 8:30 meeting

OFB gain – response to a kick – 450 GeV Default Gain x 5 Gain x 10 1/1/2019 LHC 8:30 meeting

OFB gain – response to a kick – 3.5 TeV Default Gain x 5 Gain x 10 IR 1+5 at 1 m, with Injection optics 1/1/2019 LHC 8:30 meeting

Monday PM 18:30 Filling for physics. 20:30 Ramp and squeeze. LHCb blocking again injection after PM… 20:30 Ramp and squeeze. Feedback gain increased by a factor 10 (machine coordinator clearly said no more than 5 !) First squeeze very good but then…. Feedback diverges in the IP2 squeeze where the RT corrections are larger. Dump by losses in DS of IR7, B2. So far ~ no feed-forward done on this part (due to ‘technical’ issues). Larger RT trims and larger optics differences may have conspired as trigger. 1/1/2019 LHC 8:30 meeting

The good… IR1+5 to 1 m 40 um Gain x 10 40 um 1/1/2019 LHC 8:30 meeting

The bad… RT trim oscillations IR2 to 1 m 1/1/2019 LHC 8:30 meeting

The ugly… orbit instability in IR2 squeeze Beam1 40 um Beam2 400 um 1/1/2019 LHC 8:30 meeting

Night ‘Lot de consolation’: the RT trims for the first squeeze could be fed forward now as a test to suppress the spikes without FB… needs some SW changes. OFB gain set back… 21:30 Refilling 23:30 Stable beams fill 2314, 4E26 cm-2s-1. 23:50 Fill dumped, quench loop RB.23 opened. 02:30 Re-injecting… intensity slightly down. 04:30 Stable beams fill 2315, 3.5E26 cm-2s-1. 1/1/2019 LHC 8:30 meeting

ALICE polarity – next Monday. This week Physics… Source refill – Friday ALICE polarity – next Monday. Requires some preparation work this week. 1/1/2019 LHC 8:30 meeting