HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Advertisements

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
MDT PS DCS for ATLAS Eleni Mountricha
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
SPD DCS Overview & FED Server
Production ad Quality control of RPCs for the CMS muon barrel system
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ATLAS MDT HV – LV Detector Control System (DCS)
Electronics for RPC Upscope
Barrel RPC Conditions Database
HV-LV, cabling & services
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
RPC’s HV-LV project Introduction HV and LV requirements
RPC HV&LV systems Introduction Detector description Requirements
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
RPC HV&LV systems Introduction Detector description Requirements
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
A. Boiano1, F. Loddo2, P. Paolucci1, D. Piccolo1, A. Ranieri2
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
The Online Detector Control at the BaBar experiment at SLAC
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
The IFR Online Detector Control at the BaBar experiment at SLAC
Alfonso Boiano1, Flavio Loddo2, Pierluigi Paolucci1, Antonio Ranieri2
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
RPC Detector Control System
RPC Detector Control System
RPC HV&LV systems Introduction Detector description Requirements
TPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
DQM for the RPC subdetector
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
RPC Detector Control System
on behalf of Barrel RPC Collaboration
RPC Detector Control System
Resistive Plate Chambers performance with Cosmic Rays
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

RPC Detector Control System Pierluigi Paolucci - I.N.F.N. of Naples http://www1.na.infn.it/wsubnucl/accel/cms/cms.html

What we want to monitor: Detector Control System I I.N.F.N. Naples What we want to monitor: HV and LV values  OPC server  30 Kbytes; FEB disc. Thresholds I2C  100 Kbytes; FEB pulse width I2C  100 Kbytes; FEB temperature I2C  25 Kbytes; Single Counting Rate I2C  to be calculated; Cooling system  ?  ? ; Gas system  ?  ? ; Ambient parameters  ?  ? . All data have to be logged into the Databases We can use different monitor rates to minimize the DB data rate 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

What we want to control: Detector Control System II I.N.F.N. Naples What we want to control: HV and LV systems; Cooling system; Gas system; What we want to load from the configuration DB: HV/LV setpoints FEB disc. thresholds; FEB pulse width; Status ON/OFF… Voltage V0/V1set Current I0/I1set Rump-up Rup Rump-down Rdown Trip time Trip How many subsets of HV setpoints do we need ? 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples RPC HV-LV connections I.N.F.N. Naples RB3/RB4 ALV1 DLV1 ALV2 DLV2 HV1 HV2 Bigap ALV1,ALV2,ALV3 DLV1,DLV2,DLV3 Bigap RB2 reference plane RB1/RB2in Bigap ALV1 DLV1 ALV2 DLV2 HV1 HV2 HV1 HV2 HV3 Two non adjacent gaps will be connected to the same HV channel in order to halve the # of HV channels “without” reducing the trigger efficiency. 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

SASY2000 project for RPC II Detector region Electronic house 256 I.N.F.N. Naples Detector region Electronic house 4 8 … 16 HV #1 HV #2 Branch controller #1 Complex ch. 1 256 Remote boards LV #1 LV #6 Branch controller #2 HV #1023 HV #1024 Complex ch. 512 LV #3071 LV #3072 … 256 Branch controller #16 What do we need ?? 26 ch * 12 sect * 5 wheels = 1560 LV 17 ch * 12 sect * 5 wheels = 1020 HV One mainframe is enough for the barrel

HV-LV architecture for a barrel sector I.N.F.N. Naples 26 LV channels 4 Remote Boards 17 HV channels 2 LV + I2C lines RB4 1 cc  4 LV 2 bi-gaps 2 bi-gaps 4 HV ch  2 cc 1 RB 2 LV + I2C lines 2 RB RB3 2 bi-gaps 2 bi-gaps 4 HV ch  2 cc 1 cc  4 LV 3 LV + I2C lines 1 cc  6 LV ch 3 bi-gaps 3 HV ch  1 cc RB2 1 RB 1 RB 2 LV + I2C lines 1 cc  4 LV ch 2 bi-gaps 2 HV ch  1 cc 2 LV + I2C lines 1 cc  4 LV ch 2 bi-gaps 2 HV ch  1 cc RB1 1 RB 1 RB 2 LV + I2C lines 1 cc  4 LV ch 2 bi-gaps 2 HV ch  1 cc Total Number 1560 LV channel 1020 HV channel 480 complex ch. 240 remote boards LVD channel HV channel LVA channel cc = complex channel RB = remote board EACH SECTOR 17 HV ch + 26 LV ch 8 complex ch. 4 remote boards 2 bigaps = 96 strips = 6 febs

Barrel HV-LV schema LV HV 26 LV ch/cable + 17 HV ch/cable per sector 1 I.N.F.N. Naples 26 LV ch/cable + 17 HV ch/cable per sector LV-HV 1 2 LV-HV LV-HV 3 4 LV-HV Settore -4 Settore -5 LV-HV Muon racks 2 RPC HV-LV crates Settore –6 LV HV 26 LV ch/cable 26 LV 17 HV LV-HV 5 6 LV-HV 7 8 Elect. house 17 HV 26 LV 17 HV ch/cable LV 48 remote boards/wheel  240 Remote Board 1 crates/rack  8 crates/wheel  40 crates 26 ch * 12 sect * 5 wheels = 1560 LV 17 ch * 12 sect * 5 wheels = 1020 HV HV

Pigi Paolucci, I.N.F.N. of Naples HV system Barrel I.N.F.N. Naples The barrel system consists of: wheel 1 2 3 4 5 TOT gaps 408 2040 hv ch. 204 1020 remote board 48 240 crates 8 40 racks 4*1/2 20*1/2 1020 hv channels  1 SY1527 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples HV system Endcap I.N.F.N. Naples Each endcap system consists of: station RE1 RE2 RE3 RE4 TOT # chambers 108 90 468 # hv ch. 216 180 756 # RDB 54 45 189 # crates 6 5 21 # racks 2 8 1512 gaps/hv ch.  1 SY1527 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples LV system description I.N.F.N. Naples BARREL 26 ch/sector * 12 sectors * 5 wheels = 1560 LV ch. 3 RDBs/sector  36 RDBs/wheel  180 RDBs. ENDCAP About 1200 LV ch corresponding to 100 RDBs The LV system needs less Remote Board than the HV system  1 SY1527 Mainframes is OK 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

Total number of data to monitor for HV/LV SYSTEM BRL ch. EDC ch. VALUES TOTAL HV 1020 1512 6 15192 LV 1560 1200 4 11040 We need different HV/LV setpoints loaded in the configuration database in order to have different configurations of the RPC system: Different background conditions; Efficiency .vs. HV; Electronic calibration (FEB and trigger) HV OFF. 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

More items about the HV/LV I.N.F.N. Naples What do we need to study the RPC efficiency versus the HV (plateau runs): At least 6 runs with the RPC at different HV; A trigger without RPCs (muon trig ?); Load different HV setpoints for each run: Build an automatic way to take these runs from the run control (state machine). Write data and analysis results in the database: Calculate the “new” working point for each RPC; Write them in the configuration database; Write the RPC efficiencies at the working point in the DB in order to use them in the simulation. 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

96 channels + 96 channels + 96 channels Electronic architecture for barrel sectors 4-10 I.N.F.N. Naples 5 MasterLinkBoards 10 SlaveLinkBoards 2 SLB 2 SLB RB4 96+96 channels 96+96 channels 1 MLB 1 MLB RB3 96 channels 96 channels 1 SLB 1 SLB 1 MLB 96 channels + 96 channels + 96 channels RB2 1 SLB 1 SLB 96 channels + 96 channels 1 SLB 1 SLB 96 channels + 96 channels RB1 1 MLB 1 MLB 96 channels + 96 channels 5 optical links bi-gap = 48 strips = 3 FEBs 96 channels = 6 FEBs

96 channels + 96 channels + 96 channels Electronic architecture for all the other barrel sectors 5 MasterLinkBoards 8 SlaveLinkBoards 1 SLB 1 SLB RB4 96 channels 96 channels 1 MLB 1 MLB RB3 96 channels 96 channels 1 SLB 1 SLB 1 MLB 96 channels + 96 channels + 96 channels RB2 1 SLB 1 SLB 96 channels + 96 channels 1 SLB 1 SLB 96 channels + 96 channels RB1 1 MLB 1 MLB 96 channels + 96 channels Box MLB SLB Sec 4-10 1 5 10 Other sec 8 Wheel 12 60 Barrel 300 500 5 optical links/sectors 60 optical link/wheel 300 optical link barrel

BARREL: ENDCAP: FEB monitor/control data I I.N.F.N. Naples BARREL: 78 FEB/sector * 12 sectors * 5 wheels = 4680 FEBs 9360 Threshold + 9360 width + 4680 temp. 13 I2C lines/sector = 780 I2C lines ENDCAP: 2544 FEBs (4 chips)  336 I2C lines 10176 Threshold + 10176 width + 2544 temp. TOTAL number of FEB variable to monitor: 19536 Threshold + 19536 width + 7224 temp. 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

FEB monitor/control data II I.N.F.N. Naples Barrel FEBs are equipped with 2 front-end chips (8 strips each) and 1 temperature sensor corresponding to the following parameters to monitor and control: 2 threshold values (hardware defaults of 200 mV); 2 width values (hardware defaults of 100 ns); 1 temperature value. How many operations/bytes do we need to read/write this parameters ?? Read width/thresh.  2 write + 1 read  5 bytes Read temperature  2 write + 1 read  5 bytes Write width/thresh.  3 write  5 bytes 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

FEB monitor/control data III I.N.F.N. Naples To monitor all the barrel FEB parameters we need: 46800 bytes (width) 46800 bytes (thresh.) 23400 bytes (temp.) To write a “new” width and/or threshold we need: 46800 bytes (thresh.); How often do we need to monitor them ? We are discussing about  How often do we need to modify them ? High background To reduce the dead time 117 Kbytes 94 Kbytes 50 KB/h  1.2 MB/day 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples More DCS items I.N.F.N. Naples Gas system: The Gas system group will provide us also the slow control system to integrate in our DCS. Cooling: The slow control for the cooling will be developed with the DT people. Ambient: The ambient temperature and pressure will be monitored using the DT system. We are discussing about the humidity monitoring. Single rate (under discussion): Measured by link board, can be monitored per chip (8 strips), per FEB (16/32 strips) per chamber (6/12 FEBs). 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

Strip and front-end board summary I.N.F.N. Naples Barrel Sectors RB4 …… 120 chambers RB3 …… 120 chambers RB2 …… 120 chambers RB1 …… 120 chambers Total number of FE Channels: 180 x 192 = 34.560 (RB1i , RB1e , RB2) 60 x 288 = 17.280 (RB2-special) 240 x 96 = 23.040 (RB3, RB4) -------------------------- Total = 74.880/16 Ch. = 4.680 FE boards x 1.2 ( spare)  5.600 FEBs 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

Single Rate and strip occupancy I.N.F.N. Naples Strip occupancy: Monitor through histograms the FEB/chip/strip occupancies using the features provided by the LinkBoard. Single rate: The LinkBoard will provide also a single rate monitor per FEB/chip/strip. The histograms parameter and time window will be programmable thought the I2C line. The total number of channels are: 4.700/9.400/80.000 General questions: How many bytes ? What is our monitor rate ? What is our loading rate into the DB ?. 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

Warning, Alarm and more I I.N.F.N. Naples The monitored channels will be organized in “categories” following a “risk criteria”: High Risk  HV, LV and GAS Medium Risk  Cooling, FEB Temp and Single Rate Low Risk  Ambient param, width and thresh. Every channel will have more warning/alarm levels: … < LL < L < Imon (HV) < H < HH < …. (example) A combination of the warning/alarm level and the “risk category” will generate a different operation to perform during the data tacking. 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

Warning, Alarm and more II I.N.F.N. Naples EXAMPLE I The HV variables belong to the High Risk category. Suppose that the current drown by a gap (Imon) will have 2 upper limits: A single Imon alarm do not have to stop the run but it has to generate and temporary voltage reduction. If we have (# .gt. X) of Imon alarms we should stop it. EXAMPLE II A LV trip will not stop the runs. An HV/LV RDB crate trip will stop it . warning alarm Imon < 10 mA < 15 mA 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples

Pigi Paolucci, I.N.F.N. of Naples Conclusion I.N.F.N. Naples The HV/LV system prototype is under test in Bari and in Naples (May 2002). A PC running PVSS II is in Naples and we are waiting for a SY1527 mainframes to begin to develop some DCS code. Some items are still under discussion but I hope to freeze them for the september 2002. A collaboration with the DT and CSC group is now very important in order to define a uniform and consistent DCS muon system minimizing the effort of these groups. 01/01/2019 Pigi Paolucci, I.N.F.N. of Naples