WECC August 2017 Reliability Workshop James Merlo, PhD

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

WECC TRD/NERC TADS Webinar
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013.
Reliability Challenges White Paper Victoria L. Ravenscroft Senior Policy Analyst W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
RPEWG Report Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014 RS Meeting 1.
Mandatory Reliability Rules Implementing the Electric Reliability Organization David W. Hilt Vice President & Director of Compliance APPA Reliability Symposium.
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Support Systems and Tools Brittany Power Data Coordinator.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting.
Review of TADS Data for 2012 Voltage Class Name Metric AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Black-Start in a Market Howard F. Illian, President Energy Mark, Inc. July 23, 2002.
Enforcement 101 Rachael Ferrin Associate Process Analyst.
Misoperations Reduction Strategy
NERC Reliability Readiness The Next Steps
NERC: Essential Reliability Services
MOPC Meeting Oct , 2016 Little Rock, AR
Modeling DER in Transmission Planning CAISO Experience
NERC Lessons Learned Summary
Transmission Planning in ERCOT- Overview
Compliance Report to ERCOT BOD December 2006
IG BASED WINDFARMS USING STATCOM
Phase Angle Limitations
Inverter Disconnects During Transmission Disturbances
Updated ERO Enterprise Guide for Internal Controls
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Reducing “Unknown” Misoperation Causes
ERCOT Technical Advisory Committee June 2, 2005
Compliance Report to ERCOT TAC February 2007
Workshop Session 2: Forms
Reliability Assessment Committee Reliability Workshop Priorities
GMD Data Request NERC Rules of Procedure Section 1600
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Impacts and Actions Resulting from the August 14, 2003 Blackout
Cascading Failure Working Group of
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
CMPLDWG Composite Model with Distributed Generation Approval
Workshop Session 1: Overview
Value of Trending: Application Exercise
Workshop Session 1: Overview
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
WECC August 2017 Reliability Workshop James Merlo, PhD
Value of Trending: Application Exercise
2019 Draft Budget Overview Jillian Lessner – Chief Financial Officer
Misoperations Reduction Strategy
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Reliability Assessment Committee Reliability Workshop Priorities
Reliability Assurance Initiative (RAI) 101
CMPLDWG Composite Model with Distributed Generation Approval
Support Systems and Tools
2019 Draft Budget Overview Jillian Lessner – Chief Financial Officer
CMEP Technology Project
Reducing “Unknown” Misoperation Causes
Compliance Monitoring Strategy
Presentation transcript:

WECC August 2017 Reliability Workshop James Merlo, PhD Vice President, Reliability Risk Management August 29, 2017

Events Analysis Process Capturing Faint Signals 13 lessons learned published In 2016, there were 85 non-EMS brief reports submitted to the ERO. This was a substantial increase when compared to 50 non-EMS reports submitted to the ERO in 2015. 77 of these 85 events were Category 1 events, 6 were Category 2 events and 2 were Category 3.a events in ERCOT. Subsequent to January 1, 2017, the two Category 3.a events in ERCOT would be classified as a Category 1.g event to more accurately reflect the risk associated with these events.

Event Severity Remains on Good Glideslope

Continued Decline in Average Transmission Outage Severity

Misoperations by Cause Code

Misoperations Rates Continuing to Decline

Misoperation Rate by Year

Sustained Outages Table B.14: TADS Sustained Outages 100 kV+ (2015) Sustained Cause Code Number of Outages Average Outage Duration (Hours) Median Outage Duration (Hours) Maximum Duration (Days) Failed AC Circuit Equipment 1248 56.9 12.8 161.4 Failed AC Substation Equipment 813 25.8 2.8 48.8 Weather- excluding lightning 796 14.3 1.1 107.8 Unknown 727 4.7 0.1 19.0 Other 682 7.0 0.4 49.8 Misoperation 565 11.1 0.9 34.5 Foreign Interference 411 10.0 2.1 25.6 Lightning 405 5.8 37.6 Human Error 344 4.2 0.2 18.9 Power System Condition 326 29.4 0.3 111.9 Vegetation 321 23.1 8.7 25.3 Fire 88 33.3 2.9 52.9 Contamination 76 8.9 1.6 5.6 Environmental 38 32.1 3.9 21.7 Vandalism- Terrorism- or Malicious Acts 5 6.1 5.5 0.7 Grand Total 6845 21.6 1.7

Sustained Outages Table B.14: TADS Sustained Outages 100 kV+ (2015) Sustained Cause Code Number of Outages Average Outage Duration (Hours) Median Outage Duration (Hours) Maximum Duration (Days) Failed AC Circuit Equipment 1248 56.9 12.8 161.4 Failed AC Substation Equipment 813 25.8 2.8 48.8 Weather- excluding lightning 796 14.3 1.1 107.8 Unknown 727 4.7 0.1 19.0 Other 682 7.0 0.4 49.8 Misoperation 565 11.1 0.9 34.5 Foreign Interference 411 10.0 2.1 25.6 Lightning 405 5.8 37.6 Human Error 344 4.2 0.2 18.9 Power System Condition 326 29.4 0.3 111.9 Vegetation 321 23.1 8.7 25.3 Fire 88 33.3 2.9 52.9 Contamination 76 8.9 1.6 5.6 Environmental 38 32.1 3.9 21.7 Vandalism- Terrorism- or Malicious Acts 5 6.1 5.5 0.7 Grand Total 6845 21.6 1.7

System Dynamic Character is Changing Retirement/displacement of conventional generation Variable energy resources Rapid penetration of electronically-coupled resources Essential Reliability Services Reduced inertia Frequency Reponses Voltage Support Ramping and flexibility needs Rapid penetration of new loads System controls and protection coordination Modeling and simulation constraints Increasing interface with distribution-centric resources

Human Error

Which Direction?

Work as Planned

Work as Executed

Human Capital

All Trying to do the Right Thing

Sometimes it is a Human

Your Artifacts Help Define You

Risk versus Consequences

Event Analysis and Compliance Report (EA Process) Improved Reliability Review Refine Cause Analysis Trend Analysis Incentives and Credit Event Self assessment RISK? Monitor High Emphasis on Data and Analysis Less than adequate Refine with entity Trend Analysis Improved Information to Industry Quality Compliance Assessment Investigate Spot Check Data Submittal Add to Audit No action Reconciliation of data, trend analysis; Conduct GAP analysis on Standards and Compliance Monitoring Program Improved; Lessons Learned, Guidelines, Standards, Monitoring, Education, Training Report PV as necessary No Report Risk Fair Treatment Registered Entity Regional Entity Quality Review and PV Screen NERC Support and Oversight Decision Point

Questions and Answers