Severe accident management at Paks NPP

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Disasters: What We Plan For…. John F Bradfield, DVM, PhD, DACLAM Senior Director, AAALAC International.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Safety Implications of the Fukushima Nuclear Accident Sheldon L. Trubatch, Ph.D., J.D. Vice-Chairman Arizona Section American Nuclear Society.
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
1 ACPR Advanced, cost competitive, proven technology, and reliable The Third Generation Nuclear Reactor.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
Overview of Conventional 2-loop PWR Simulator. PCTRAN Dr
Generation Aino Ahonen CABABILITY OF APROS IN THE ANALYSES OF DIESEL LOADING SEQUENCES E. Raiko, H.Kontio, K.Porkholm, presented by A. Ahonen.
Outcome of the EU Nuclear Safety Stress Tests Andrej Stritar Chairman, ENSREG.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
Sergii Iegan Division on Safety Analysis of Nuclear Facilities
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
ERMSAR 2012, Cologne March 21 – 23, 2012 Post-test calculations of CERES experiments using ASTEC code Lajos Tarczal 1, Gabor Lajtha 2 1 Paks Nuclear Power.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Post-Fukushima Severe Accident Management Update Kim, Hyeong Taek KHNP- Central Research Institute July KINS Safety Analysis Symposium.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
Occupational Radiation Protection during High Exposure Operations
János Krutzler Hungarian Atomic Energy Authority
DCPP Performance Based on NRC Performance Indicators
STRESS TESTS and TAIWAN PEER REVIEW PROCESS
Radioactive waste repositories
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Flooding Walkdown Guidance
9.5 Nuclear Power Although nuclear power does not come from a fossil fuel, it is fueled by uranium, which is obtained from mining and is non-renewable.
Complementarity of deterministic and probabilistic approaches
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Armenia Training and Tutoring Feedback
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Communication and Consultation with Interested Parties by the RB
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Presentation to the EPREV Lessons Learned Workshop
Bringing safety performance of older plants on par with advanced reactor designs International Conference on Safety Demonstration of Advanced Water Cooled.
Session Name: Lessons Learned from Mega Projects
Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
Nuclear Emergency Planning and Preparedness
Legal and Regulatory Framework for Nuclear Installations in IRAN
Japanese Nuclear Accident And U.S. Response
Version 1.0, May 2015 SHORT COURSE
RSFs & categorisation 20 May, 2019.
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Regulatory system in Hungary
New Regulatory Requirements in Japan
Presentation transcript:

Severe accident management at Paks NPP 6-9. June 2017, Paks | Gábor Volent director of safety and security Severe accident management at Paks NPP

The MVM Paks Nuclear Power Plant the only nuclear power plant in Hungary belongs to the MVM Hungarian Electricity Company Ltd. designed in the 70’s, commissioned in the 80’s 4 x VVER440/V213 reactors 30 years originally designed lifetime the largest and cheapest domestic source

MVM Paks Nuclear Power Plant Unit 4 500 МW Unit 3 Unit 2 Unit 1 Start up of the unit Capacity upgrade 30-year life time 50-year life time Unit 1 14/12/1982 19/07/2007 2012 2032 Unit 2 26/08/1984 05/12/2008 2014 2034 Unit 3 15/09/1986 13/11/2009 2016 2036 Unit 4 09/08/1987 28/09/2006 2017 2037

Domestic electricity production 445,5 TWh electric power has been produced by MVM Paks Nuclear Power Plant since the date of the first connection of Unit 1 to the grid

Continuous safety enhancement The enhancement of nuclear safety had been started in Paks already before the commissioning of Unit 4 in 1987 1984 – 1987 Implementation of a full-scale simulator 1991 – 1994 AGNES Report (Advanced General and New Evaluation of Safety) 1996 – 2000 Plant Process Computer Reconstruction 1996 – 2002 Safety Enhancement Measures 1993 – 2002 Review of seismic hazards, plant reinforcement 1993 – 2004 Reactor Protection System Reconstruction 2008 – 2014 Sever Accident Management 2011 – Targeted Safety Review (TSR) and corrective measures

Review of seismic hazards, plant reinforcement During the technical design of Paks NPP, 0.025-0.05 g horizontal component was taken into account as earthquake intensity. Pursuant to the results of a comprehensive geological assessment the design basis earthquake has been set to 0.25 g for the horizontal and 0.2 g for the vertical components taken at 10-4/year frequency level on the weighted mean hazard curve. The reinforcement for design basis earthquake took place in the 1990s.

Plant reinforcement

Severe Accident Management (SAM) The evaluation of the plant safety from the aspect of large discharges was completed by the end of 2004. There are three key elements of the implementation of severe accident management: execution of technical modification belonging to SAM introduction of Severe Accident Management Guidelines modification of emergency preparedness

SAM technical modifications External cooling of reactor pressure vessel The approximate 1180 m3 water and the coolant from the primary circuit can be used to flood the 270 m3 reactor cavity. Measurement system for severe accident Certain primary circuit and secondary circuit parameters. Operable under severe accident conditions. Batteries and later mobile accident Mobile Diesel generator can supply electrical power to the measurement.

SAM technical modifications Severe accident Diesel generators Supply electrical power to measurement system and the actuation of certain valves. One for each Unit (100 kW, 0,4 kV). Two independent connection points at the outer wall of each unit. Hydrogen management Sixty (30 pairs) NIS type passive autocatalytic severe accident recombiners. The burning of H2 already starts at normal temperature.

SAM technical modifications Reinforcement of cooling circuit of spent fuel pool Reinforcement against loss of coolant due to pipeline rupture. Prevention of containment long term over-pressurization The slow overpressure is caused by steam produced during the external cooling of the reactor pressure vessel. Consequently, the relevant accident management guideline requires the reduction of the pressure in the containment.

Severe Accident Management Guidelines Westinghouse severe accident management guidance documentation. SAMGs cover different operational status of Unit under operation shut-down cooling pool severe accidents Entry to the SAMG criteria in symptom-based operational instruction, shut- down symptom-based operational instruction and cooling pool instructions core outlet temperature dose rate (open reactor vessel with fuels) dose rate (cooling pool) .

SAM - Emergency Preparedness Creation of Technical Support Centre TSC was established at Emergency Response Centre Equipped with Severe Accident Monitoring System Multiunits severe accidents

Targeted safety reassessment („stress test”) In the frame of post Fukushima actions, MVM Paks NPP performed a targeted safety re-assessment taking into accounts ENSREG requirements. Reassessment covered: design basis regarding external sources of hazards safety margins prolonged loss of electric power supply and ultimate heat skin severe accident management site emergency provisions

External natural hazards Earthquake Re-design, re-qualification of critical systems, and where necessary their reinforcement took place in the 1990s within the frame of a comprehensive review programme. External flooding The icy flood is 96.07 m, while the level of open river flood may be 95.51 m. The level of site is 97.15 m. Low water level of the Danube The value is 84.65 m. The essential service water pumps can be started and operated up to 83.5 m. Other external hazards The other external hazards do not challenge the safety of the plant more seriously than acceptable.

External natural hazards - conclusion Paks NPP is safe and no further immediate action is necessary. However, further safety improvements are possible. Seismic reinforcement of conventional parts of the plant (400 kV and 120 kV substations, the fire brigade barrack, shelters). Appropriate fixing of tools and appliances, used during outages and stored at the units. External flooding may flood the pump rooms. Wall penetrations must be isolated in essential service water pump building. It should be ensured that the pipeline trenches are applicable to receive and drain the discharged water. .

Electric supply and ultimate heat sink From the aspect of assessment of beyond design basis margins the only external event that can be evaluated is the earthquake. There is no certainty that the systems of electric power supply and ultimate heat sink functions will be impaired even after a beyond design basis earthquake, but the probability of loss of function is increased with the strength of the earthquake.

Electric supply/ultimate heat sink - conclusion Alternative and justified off-site electrical power supply routes are available to supply electrical power to the safety consumers of the nuclear power plant. However, the assessment identified further alternative solutions. The existing mobile severe accident Diesel generators on the management of severe accidents, are not suitable. Independent accident Diesel generators have to be therefore installed. The high-voltage substations are non-safety systems and, therefore, they are not qualified seismically. Seismic qualification and/or reinforcement of the substations shall be carried out. Creation black-start capability to gas turbine (an off-site gas turbine located remotely).

Ultimate heat sink - conclusion The design of the Paks NPP provides a very low probability of such events; at most it might happen due to a beyond design basis external event or rather due to combinations thereof. The demineralised water tanks in Units 3 and 4 are installed alongside a laboratory and service building. The tanks must be protected against the impact of the falling wall. Alternate water supply from fire water system An appropriate solution might be the creation of mobile water extraction from the demineralised water tanks, the River Danube or from the fishing lakes near the plant. An appropriate design change must be implemented to access the additional cooling water at a quantity of ~ 2x2,000 m3 from the closed section of the discharge water canals of Units 3 and 4.

Emergency preparedness The preparedness for emergencies is good, thanks to the earlier performed modifications in the frame of SAM. However some further improvements are possible. Radiation-shielded vehicles and other necessary tools A severe accident simulator must be built for training Extension of the functionality of the ERC and BERC Preparation for severe accidents involving several units simultaneously Emergency procedures for the management of liquid radioactive wastes resulting from a severe accident

SAM - Tasks Modification Unit 1 Unit 2 Unit 3 Unit 4 External cooling of reactor vessel Implemented Measurement system Severe accident Diesel generator Hydrogen recombiners Reinforcement of cooling circuit of spent fuel pool TSC in Emergency Response Centre Introduction of severe accident management guidelines Prevention of containment long term over-pressurization 2019

Targeted safety reassessment - Tasks

Summary The safety improvements has a long history at Paks NPP. The enhancement of nuclear safety had been started in Paks already before the commissioning of Unit 4 in 1987. The core damage frequency decreased by one order of magnitude as a results of safety improvement projects. The implementation of severe accident management was started and partly performed at Paks before Fukushima accident. By now, the elements of SAM have been performed, except of the prevention of containment long term over-pressurization.

Summary The Targeted safety reassessment did not revealed any such deficiency at Paks NPP, which may question the adequacy of its design basis and may require any urgent intervention. Much of the tasks decided were met. Some tasks delay mainly because their complexity; and long-lasting public procurement procedures

Thank you for your attention!