LBA05 ops meeting Tasso Tzioumis

Slides:



Advertisements
Similar presentations
Software for Engineers EG1003: Introduction to Engineering and Design.
Advertisements

Individual Learning Plan for Kentucky. Background: Data Integration State-wide unique student identifiers are used to link information from a number of.
Basic Response Letter Last Updated Basic Response Letter The response redesign in SERFF 5.6 introduces the concept of inline schedule item.
EG1003: Introduction to Engineering and Design Software for Engineers.
Windsor Solutions, Inc. State and Local Emissions Inventory System (SLEIS) WV DEP Regulated Community Training Tuesday, December 4 th 2012.
Information Technology IBM DB2 Content Manager “Lunch N Learn” 03/14/2007.
Managing a Club A club is trying to persuade more people to take part. Some features of the club are: Open to all ages Takes part in competitions and.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
1 Information Gathering (Requirements Elicitation) Remember: distinguish “requirements” from “design” (big issue here?) Requirements are about “black box”
RECRUIT Overview November 29, 2005 Academic Personnel Systems 1 Academic Personnel Systems: RECRUIT Please silence cell-phones.
Adding a Syllabus Link. Let’s add the syllabus to the homepage. Return to the homepage Click “Add File” To get to the homepage, click the Course Content.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
Developing an IOOS Data Management Plan that Satisfies NOAA’s Requirements and IOOS Certification Requirements John Ten Hoeve 9/11/13.
LBA Correlator & Operations LBA’05 Ops mtg Hobart 8 Feb 2005 Tasso Tzioumis.
Office of the Faculty Secretary www:webs.uidaho.edu/facultycouncil Faculty Senate Website 8/10/09 1.
MDECA SECURITY UPDATES Update & Review for Security Changes!
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
1 TDTWG Update to RMS Wednesday March 11, Primary Activities 1.Reviewed ERCOT System Outages and failures 2.ERCOT update of browser support for.
Accreditation system WG Improvement to accreditation  Compact online forms  Option to import input data via excel files  Inclusion of IF Passport.
15 Maintaining a Web Site Section 15.1 Identify Webmastering tasks Identify Web server maintenance techniques Describe the importance of backups Section.
1 California State University, Fullerton Chapter 8 Personal Productivity and Problem Solving.
ACSP Report – Review of Open Suggestions Nate Davis.
Site Restructure and Expansion. Background Magnaflux is a leading worldwide supplier of equipment and chemicals used in nondestructive testing The magnaflux.com.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
How to Adapt existing Archives to VO: the ISO and XMM-Newton cases Research and Scientific Support Department Science Operations.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
Thomas C. Stein PDS Geosciences Node Washington University in St. Louis 1MS Supporting Active Surface Missions and Adding Value.
2003 LBA Ops meeting Tasso Tzioumis. Previous LBA ops meeting 3 April 2003, Hobart Minutes on
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
Restructuring Mergers and CHANGE! Recordkeeping Advice Alice Patterson, Senior Advisor Government Recordkeeping Programme.
Communications Subcommittee Status July 12, 2004 Leldon Kelly, Chair Jim Fillerup, Acting Chair Sandy Wallace James Clarke Michel Berdoyes Francesca Lillo.
SUPPLEMENTAL B An Overview of The General Ledger Architecture.
Access and Query Task Force Status at F2F1 Simon Miles.
An Overview of The General Ledger Architecture.  Files are used to store data and processing instruction. The two types of files computer users use most.
VLBI Facility report - Mar 2003 Tasso Tzioumis ATNF CSIRO.
The New DRS Introduction. What is DRS? Digital repository for preservation and access – Maintains integrity of deposited content – Preserves content for.
Copyright 2010, The World Bank Group. All Rights Reserved. Testing and Documentation Part II.
Pipeline Basics Jared Crossley NRAO NRAO. What is a data pipeline?  One or more programs that perform a task with reduced user interaction.  May be.
WHAT ARE THE ELEMENTS OF ART?
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama OCR Etiquette Jimmy Whitaker.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
WfMS and external systems Katarzyna Bylec PSNC. Agenda Introduction Pre-corelation ▫ North Star ▫ NRAO SCHED ▫ Vlbeer FTP ▫ Log2vex ▫ drudg Correlation.
GLAST Science Support Center November 8, 2005 GUC Action Item #15 AI#15: Pre-Launch GI Proposal Tools David Band (GSSC/JCA-UMBC)
The overview of Hotel Management System Currently at the Okinawa International hotel, routine procedures like; vacant room inquiry, reservation and cancellation.
COMET Working Group Progress Report 11/13/03
NASA Earth Science Data Stewardship
Internet Made Easy! Make sure all your information is always up to date and instantly available to all your clients.
Laboratory 1: Software for Engineers
Software Application Overview
Software Overview Sonja Vrcic
NSIDC DAAC Accessioning and “De-commissioning” Plans
Request a Content Change for Novartis.com
Section 15.1 Section 15.2 Identify Webmastering tasks
Producer Toolbox User Guide
GLAST Large Area Telescope:
PMI Shelter Manual Review
Report from the GSICS Data Management Working Group
Software for Engineers
Software for Engineers
Gustaaf van Moorsel September 9, 2003
Producer Toolbox User Guide
Welcome Traceability Software Integrators
“PERFORM: Let’s Get Started”
CHAPTER 6 ELECTRONIC DATA PROCESSING SYSTEMS
Updates of GDWG Recommendations for GSICS Action Tracking Tool
ISSUE MANAGEMENT PROCESS MONTH DAY, YEAR
USOAP Continuous Monitoring Approach (CMA) Workshop
INAF Long Term Preservation
Presentation transcript:

LBA05 ops meeting Tasso Tzioumis LBA Web pages LBA05 ops meeting Tasso Tzioumis

Web background Most of LBA web pages are old No significant resources Could spend a lot of effort Must define: Minimum necessary information Desirable information Extras Must balance against available effort

LBA homepage Overview + Documents + Observing + LBA Correlator + Reports + People X ? Research X ? Schedules + Meetings X ? Other VLBI + ?more? New * Status of Active Proposals * Standard LBA modes (draft) * Novice's Guide to Using the LBA (Postscript format) * Note on Calibrators * Casual VLBI Correlator Operator vacancy

Significant pages -1 Documents Observing & Correlator info Telescope information - Updated More needed? Tape lists Operational Guides Software guides Observing & Correlator info What needs to be added?

Significant pages -2 Scheduling Reports Scheduling information Schedules Kept up-to-date (Jim, Chris, Simon) Reports Included in original format directly.

FTP pages FTP pages exist for ALL observations Schedules for observing Observational logs Correlator logs and plots Primary archive of metadata available via Web Include FULL cal info? ANTAB files Scripts exist but need full implementation

Changes/additions? Mindful of “balance” - effort vs resources Sensitivity calculator? Volunteer? Electronic proposals - ATNF will implement Ensure suitable for VLBI More VLBI links? Please input suggestions and/or volunteer to implement Critical items - I will implement?!