Team member1 Team member2 Team member3 Team member4 October 2016

Slides:



Advertisements
Similar presentations
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Advertisements

Widget Project Update Team member1 Team member2 Team member3 Team member4 October 8, 2011.
Multidisciplinary Engineering Senior Design Project 05xxx Project Name 2005 Critical Design Review May 13, 2001 Project Sponsor: Team Members: Team Mentor:
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
What is a project? Project Management Institute definition
Chapter 5: Project Scope Management
EDGE™ A P D C Copyright © 2004 Dr. Edward Hensel P.E. and P.H. Stiebitz. All rights reserved. Technical Data Package & Team Notebook …what is it anyway?
1 Course Schedule Spring 2006 Exam 1 February 2006 Project Introduction(5pages)3/24/06 Project Testing 3/24-4/15 Exam 2 4/11/06 Presentation instructions:
1 Course Schedule Spring 2007 Exam 1 October 2007 Project Introduction(5pages)Oct – Nov Exam 2 November 2007 Project Testing Nov 26 - Dec4 Last Homework.
ME 4054 Advisor Meeting September 4, 2008 Prof. Thomas R. Chase Mechanical Engineering University of Minnesota.
Office Designs The Design Process at Work © MS Office Suite.
Requirements Specification: Smart Scheduling Client: Dr. Robert Yoder.
WRAP Technical Support System Project Update AoH Call October 19, 2005.
A brief overview of the project By Group 2 Barry Amir Bhumi Shubh.
A brief overview of the project By Group 2 Barry Amir Bhumi Shubh
Lecture for Senior Design Classes By Dr. Pam Estes Brewer Associate Professor, TCO Mercer University School of Engineering Brewer (Adapted from presentation.
Designing Written Reports Presentation for Senior Design Classes by Dr. George Hayhoe Professor, Technical Communication Mercer University School of Engineering.
21 August Agenda  Introductions  Logistics  Selecting a project  Working with a client.
Project Status Report Presenter Name Presentation Date.
CE442: Construction Administration Planning & Control Missouri Science & Tech Engineering Education Center Course Overview Dr. Bodapati Nov 20, 2013.
Latifa AlAbdulkarim King Saud University October,2009.
Widget Project Update Team member1 Team member2 Team member3 Team member4 October 2015.
Remote Pet Feeder Project Status Update Team member1 Team member2 Team member3 Team member4 9 February 2016.
Project management Topic 2 Product based planning.
3/21/20161 Project Title Team Name Team membership Customer (if you have a customer) EEL3923C Junior Design (S11) Date: Project #
TECM 3200 Dr. Lam.  Students will know how to complete a work breakdown structure (WBS)  Students will know how to complete a project schedule.
HNDIT23082 Lecture 10:Software Project Management
Presenter Name Presentation Date
Remote Pet Feeder Project Status Update
Writing the Progress Status Report
Project Points Software Specification Lecture 8
Presenter Name Presentation Date
Project Planning GCP 2008.
[Project Name] [Presenter Name]
WP5: Dissemination, studies, web portal and tools
VirtuLab: Web Based Flow Visualization Facility
Progress and Performance Measurement and Evaluation
Project Status as of March 26, 2012
Presenter Name Presentation Date
Team member1 Team member2 Team member3 Team member4 November 2018
Project Management.
[Project Name] [Presenter Name]
[Project Name] [Presenter Name]
Team member1 Team member2 Team member3 Team member4 17 September 2009
Multimedia Conversion of Room 203
COMD 4900 – AIR Department at City Tech
Team member1 Team member2 Team member3 Team member4 Feb. **, 2009
Presenter Name Presentation Date
[Project Name] [Presenter Name]
CS 490M Software Testing fall 2006 Project Title
Introduction to Software Engineering (CEN-4010)
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Remote Pet Feeder Project Status Update
Visual Studio Walk-Through PHASE 03 DUE THURSDAY
Focus on Quality Quality Improvement Tools
Project Plan MS Project Example (Optional)
Presenter Name Presentation Date
Presenter Name Presentation Date
Project Overview.
Project Kick-off <Customer Name> <Project Name>
Project Name TEAM MEMBER 1 NAME TEAM MEMBER 2 NAME TEAM MEMBER 3 NAME
Parent Night Wednesday, October 1, 2014
[Ballot code, contract number] [Project title]
[Ballot code, contract number] [Project title]
[Project name] [Presenter name]
PROJECT NAME YOUR LOGO PROJECT CODE: PROJECT MANAGER: DATE OF REPORT:
Project Model Otto Husby Cimple AS.
Internship Final Report title…..
Project LocatePortland Team Pistol River Pocket Gopher
Presentation transcript:

Team member1 Team member2 Team member3 Team member4 October 2016 Widget Project Update Team member1 Team member2 Team member3 Team member4 October 2016

Widget Project Brief 2 sentence description of project & deliverable. For example: Develop a prototype remote control widget that will allow dog owners walk their dog remotely via the web. Client: Dr. Smith (Supply a graphic or picture representative of your project)

Design Status Design status: incomplete. Feasibility Criteria: Complete. Specifications: 75% complete Design analyses & calcs: 80% complete Preferred design has been selected. Final drawings & documentation: 20% complete PDR scheduled: 16 Nov 2016 2:00PM, Room 204A

Favored Preliminary Design Include one overview of your favorite design approach (include 1 sketch) if you have one.

Current Project Schedule Is project on schedule? YES/NO If NO, Why? How will you meet your completion date? Show Gantt chart When did you last meet with your client? 5 days ago. When did you last meet with your Tech. Advisor? 12 days ago.

Current Issues Highlight any major problem that could delay design completion Do you need help or suggestions?