Mississagua Lake Levels To June 20, 2017 & The New Mississagua Dam

Slides:



Advertisements
Similar presentations
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 8, 2009 RECLAMATION Managing Water in the West.
Advertisements

Andy Wood Univ. of Washington Dept. of Civil & Envir. Engr. Statistics related to the merging of short and long lead precipitation predictions in the continental.
Historical Texas Drought Update LCRA Firm Water Customer Meeting October 27, 2011 Bob Rose, LCRA Meteorologist.
2015 SPRING FIRE POTENTIAL OUTLOOK EASTERN AREA PREDICTIVE SERVICES.
THE DESERT BIOME BY: KARIS. TEMPERATURE/ SEASONS o Desert fluctuate from day to night. Winter temperatures are lower than usual in the spring and summer.
Mississagua Lake Levels and the 2015 Priorities of the Coalition for Equitable Water Flow (CEWF) Presentation to the Cavendish Community Ratepayers’ Association.
The Trent Severn Waterway (TSW), our Lake Levels, and the Coalition for Equitable Water Flow (CEWF), Presentation to CCRAI June 23, 2012 By Ted Spence.
Conservation Action Committee April 17, 2014 Drought Watch 2014 Lake Oroville, 2014.
Trent-Severn Waterway National Historic Site of Canada Water Management Program.
National Weather Service Steve Gohde WFO Duluth Observing Program Leader Craig Schmidt WFO Twin Cities Service Hydrologist January 6, 2015.
Idaho Water Supply Outlook IDWR State Water Supply Meeting Jan 12, 2012 Current Conditions & New Normals Maybe new normals also means new peaks and new.
National Weather Service Diane Cooper MPX /DLH Service Hydrologist Steve Gohde DLH Observations Program Leader December 13, 2011.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 9, 2008 RECLAMATION Managing Water in the West.
EFCC Weather Outlook 5 June 2012 Fire Season Key Elements From NWCC Below normal snowpack Early snowmelt Early snowmelt Long term drought Long term drought.
George A. Galleher, PE Hydro Fleet Operations Duke Energy Carolinas NC Drought Management Council Duke Energy Update March 24, 2011.
International Osoyoos Lake Board of Control International Osoyoos Lake Board of Control Public Meeting Osoyoos Lake Water Science Forum October 8, 2015.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Task Five By Marie Summers and Ryan Jimenez. Countries differ in climate depending on how far they are from the equator or what their latitude is. THESIS.
Afghanistan Area Weather and Climate Products cpc. ncep
Intended Nationally Determined Contributions (INDCs)
“Estimated” Corn Field Drying
John Lewis, Senior Forecaster National Weather Service
Mississagua Lake Chain Levels To August 19, 2017 & Projections for Climate Change in the TSW Reservoir Area Presentation to the Cavendish Community Ratepayers’
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 8/31/2017
Learning objectives To understand the water balance
Baltimore.
COSMO Priority Project ”Quantitative Precipitation Forecasts”
ROD'S WINTER FORECAST Rod's Winter Outlook 1 1
Average Monthly Temperature and Rainfall
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 9/7/2017
Water Level Management on Mississagua Lake Chain Winter and Spring 2013/2014 Ted Spence CCRAI Representative to Coalition for Equitable Water Flow (CEWF)
Constructing Climate Graphs
ND Weekly Drought Update
2018/2019 School Calendar July August September October November
India’s Summer and Winter Monsoon Seasons
CORPUS CHRISTI CATHOLIC COLLEGE – GEOGRAPHY DEPARTMENT
FAY Dates School Year Traditional Fall 4x4 Spring 4x
Public Meeting Agenda – June 21, 2014
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 6/29/2017
PBIS Update November 2005.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
April May April May June July July June August Sept August
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 6/19/2017
PBIS Update October 2005.
HOW TO DRAW CLIMATE GRAPHS
Saraju K. Baidya Department of Hydrology and Meteorology Nepal
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 7/17/2017
FAY Dates School Year Traditional Fall 4x4 Spring 4x
A Climate Study of Daily Temperature Change From the Previous Day
Adnan Akyuz, Ph.D. NDSU, AES State Climatologist Updated 7/20/2017
South Carolina’s Climate
©G Dear 2010 – Not to be sold/Free to use
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
Births as per Civil Registration System,
MEDITERRANEAN CLIMATE
Month Rainfall (mm) Temp Jan Feb March 34 April 38 May June July
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
John Lewis, Senior Forecaster National Weather Service
Objective - To make a line graph.
Belem Climate Data Table
Presentation by Brian Houle
Presentation to CCRAI June 22, 2013 By
2010 Trial Results 2010 Perennial Results 2010 Annual Results
PLAYMATES LEARNING CENTER CALENDAR
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Calendar Overview – Phase I – REVISED April 2019
Calendar Overview – Phase II – REVISED April 2019
Overview of the TSW And Review of 2019 Winter and Spring Weather and Water Management Across the TSW Reservoirs with Focus on Mississagua Lakes CCRAI Meeting.
Moisture Situation Update
Presentation transcript:

Mississagua Lake Levels To June 20, 2017 & The New Mississagua Dam Presentation to the Cavendish Community Ratepayers’ Association Inc. – CCRAI June 24, 2017 Ted Spence – CEWF Chair, CCRAI Board member, and Professor Emeritus in Environmental Studies, York U cewf.ca

Mississagua Lake Levels 2016 Outstanding water management with extreme drought May to Mid-August

2016-2017 Winter/Spring Precipitation Haliburton Month Ppte Total mms Rain mms Snow cms Normal Monthly Total mms Actual as % of Normal 2016 Nov. 53 42 10 116 46% 2016 Dec. 153 19 134 87 176% 2017 Jan. 82 29 100 82% 2017 Feb. 45 55 73 137% 2017 March 83 69 14 75 111% 2017 April 144 131 13 192% 2018 May 175.6 174.6 1 93 189% 3 3

Trent Basin Precipitation Totals April 30 to May 6, 2017 Rainfall Totals April 30 to May 6, 2017 Haliburton April 30 to May 6 130 mm 5 inches Peterborough April 30 to May 6 117 mm 4.6 inches Trenton April 30 to May 6 164 mm 6.5 inches 4 4

Kennisis Lake 2017

Minden Wednesday May 10, 2017 (Source: The Highlander)

Mississagua Levels to June 21, 2017

Cewf.ca Links to TSW and CEWF News, TSW Water Levels, and Water Level Forecasts

Mississagua Dam Replacement June 15 2017

Site April 2017

Winter 2017

Winter 2017

Winter 2017

April 2017 East Spillway

East Spillway in Operation April 30

Construction on West and Centre Spillways May/June 2017

Mississagua Dam June 15, 2017

Mississagua Dam June 15, 2017

Next Steps Completion of the Centre and Western Spillways and west side weir. Construction of new deck across all three spillways (June/July 2017) Project Substantial Completion in early fall. Site demobilization in fall. Repairs to side weir possibly delayed until winter 2017/18

Questions and Discussion