The Asset Reinvestment Logic Diagram

Slides:



Advertisements
Similar presentations
Audit Committee Risk Management Training September 2010 John Allsop Marcus Richards.
Advertisements

Appendix H: Risk training slides (sample). What is Risk? “ Risk is the effect of uncertainty on objectives ” AS/NZS ISO31000:2009.
I can plot coordinates. Given the equation of a straight line, I can complete a table of values. From a table of values, I can draw a straight line. Given.
Aspire Executive Committee Self-Evaluation Retreat – June 29, 2005.
Slide 1Fig. 22.1, p.669. Slide 2Fig. 22.3, p.670.
Slide 1Fig. 17.1, p.513. Slide 2Table 17.1, p.514.
Binary Decision Diagrams1 BINARY DECISION DIAGRAMS.
Mgt 20600: IT Management & Applications Databases Tuesday April 4, 2006.
CORPORATE RISK MANAGEMENT & INSURANCE BY R P BLAH D.G.M. INCHARGE THE ORIENTAL INSURANCE COMPANY LIMITED REGIONAL OFFICE BHUBANESWAR.
ENGINEERING 1181 College of Engineering Engineering Education Innovation Center Problem Solving with Excel Class Preparation.
Copyright © Texas Education Agency, All rights reserved. 1 Web Technologies Website Development with Dreamweaver.
Feasibility Analysis By: Professor Wilmer Arellano.
HIT Accessibility HHS HIT Policy Committee Meeting September 14, 2010 David Baquis, U.S. Access Board.
Financial Sustainability of Water, Waste Water, and Watershed Management THE TOOLS OF THE TRADE.
Total Item Price: $ Dollars. Website: Price: $60.00.
Website Development with Dreamweaver
Presented at: 1998 DFA Seminar July 13-14, 1998 Presented at: 1998 DFA Seminar July 13-14, 1998 lmn Dynamic Financial Analysis: Objectives & Design Gerald.
2. What is the prime rate?. 1. What is the short-term effect of an increase or decrease in the money supply?
Feasibility Analysis By: Professor Wilmer Arellano.
M&E TRAINING MODULES Different tools for different applications.
RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.
CEDR TD Management PG2 – Planning the Network Task M3/M8 Status Report for Executive Board 19 June 2008.
Nick Fish, Commissioner | Michael Stuhr, P.E., Director Portland Water Bureau May 3, 2016 Briefing for the Portland Utility Board Asset Management at the.
Chapter 11 Capital Budgeting Techniques: Certainty and Risk Lawrence J. Gitman Jeff Madura Introduction to Finance.
Award Criteria KA1 and KA2 projects are assessed using award criteria. Proposals must score a min 60 points And at least half of the maximum points awarded.
IT 210 Complete Class To purchase this material link 210-Complete-Class. For more courses visit our website
Project Planning: Scope and the Work Breakdown Structure
Level of Service and Risk: What’s the Connection?
Risk Tolerance Factor # 10 Role Models Accepting Risk
Participant and Leader Training
11.1 Plan Risk Management The process of defining how to conduct risk management activities for a project Detailed risk planning enhances the overall probability.
Has end of service level/capacity life been reached?
Athletic Training Management
APWA Asset Management Workshop
Please read and then delete this slide
The RCA Process Getting Started
continued on next slide
HUMAN RESOURCE GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE
Risk Assessment Program
one sasol SHE excellence approach
Asset Governance – Integrated Strategic Asset Management
The Asset Reinvestment Logic Diagram
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
استراتژی های مدیریت تغییر
Project Management Fundamentals
The Asset Reinvestment Logic Diagram
VeNí Service-focused Approach
Problem Trees I want to plan a project
The Asset Reinvestment Logic Diagram
PowerPoint Create charts and tables
Risk Management and Mitigation
4.2 Identify intervention outputs
The Strategic Prevention Framework
Дизајн на високо ниво на супервизијата заснована на оценка на ризик Џон Ашкрофт 1/16/2019 Поддршка на Агенцијата за супервизија на капитално финансираното.
,. . ' ;; '.. I I tI I t : /..: /.. ' : ····t I 'h I.;.; '..'.. I ' :".:".
The Asset Reinvestment Logic Diagram
COSO I COSO II. Meycor COSO, a Comprehensive Solution for Enterprise Risk Management (ERM)
Understanding the current Public Sector landscape from an risk management point of view Applying the ethical responsibility to the Triple Bottom-line:
Chapter 28 – Modified by Fleck
Risk Appetite What is risk appetite?
WHAT SHALL WE DO WHEN WE ALL GO OUT?
Developing Asset Management Capacity
The Risk Management Process
Question? Discussion points pg 82.
continued on next slide
The Asset Reinvestment Logic Diagram
October 29, 2017 MKTG 5604.
continued on next slide
Presentation transcript:

The Asset Reinvestment Logic Diagram End of Asset Life Reinvestment Decision Support Tool

Example of consequence of failure table Note! While much can be said about scoring the consequence of failure (see the Fundamentals of Asset Management training material on the USEPA website as referenced on the last slide of this Tool), in this example, a triple bottom line approach is presented. Note particularly the monetized consequences impact row highlighted in the slide. This row ties directly to the tolerable risk discussion in Step 1. What level of monetized community impact is the policy board willing to accept as the maximum level of consequence? Once that level is determined in dollars, then all failures, whether plant based or pipe, can be viewed from a level playing field. The illustration used in this slide comes from WERF’s Business Risk Exposure Tool. Example from WERF Strategic AM Project – Business Risk Exposure Tool End of Asset Life Reinvestment Decision Support Tool