FNAL LT Testing Status Modules 30200020008741 – 8797 were tested during Aug 2 – Aug 9. 6 LT runs were performed. 1 run had K-Mux error – not during the readout => all data looks OK. Module 8778 has bad pulse shapes – needs to be retested. Modules 8725, 8732 and 8735 were retested and look good. Weekly: 60 modules – LT tested, 59 were graded A, 1 module – to retest.
FNAL LT Testing Status Cumulative Weekly 99.45% 2 1067 20 59 Total 0.00% R7 R6 00 R5S R5N 99.44% 1 698 3 L56p 99.33% 2357 56 L34p L12sd L12su 100.00% 12 L12pd L12pu % Pass fFail Pass Fail Cumulative Weekly