FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.

Slides:



Advertisements
Similar presentations
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
Advertisements

TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
CMS week – December 8-12, TOB sensor quality Regina Demina University of Rochester.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the TOB Group Tracker General Meeting December 7, 2005 Slides.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 Hybrid & Module Testing Status Week of 6/6-6/10.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
Test Results Highlighted Material Batches tested 6WA –263(1) 230(1) 265(2) 272(1) 273(3) (3) 305(1) (6) (2) 6WB –278(1) 279(9) 282.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
I CAN LEARN.  All problems on all tests, quizzes, and homework should be written legibly, in order and numbered.  All that you might be tempted to call.
1 TPC online  offline calibration November 2002.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
>>=Is there any problem connecting
Should Kids Play RATED M GAMEs
Using local variable without initialization is an error.
Using the Mouse Dead Application
DAQ Equipment Status 2 fully equipped Vienna boxes at UCSB and FNAL
Hybrid & Module Testing Status
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
US Module Production Quality
Vienna Module Production
FNAL Module Testing Status
Module Production Status in Florence
US Testing Update Anthony Affolder (On behalf of the US testing group)
TEC Module Production Overview
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
Hybrid & Module Testing Status
UAT PROGRESS REPORT UAT: Project name Prepared by: Date: DD-MM-YYYY
FNAL Hybrid Testing Status
Module Testing in Florence Carlo Civinini INFN-Florence
Module Testing Status Week of 6/14-6/20.
مديريت موثر جلسات Running a Meeting that Works
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Isolated Bad-CAC Strip at UCSB
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Wirebonding UCSB FNAL Machines
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Types of Errors And Error Analysis.
FNAL Hybrid Testing Status
Università di Catania and INFN – Sezione di Catania
FNAL Hybrid Testing Status
Presentation transcript:

FNAL LT Testing Status Modules 30200020008741 – 8797 were tested during Aug 2 – Aug 9. 6 LT runs were performed. 1 run had K-Mux error – not during the readout => all data looks OK. Module 8778 has bad pulse shapes – needs to be retested. Modules 8725, 8732 and 8735 were retested and look good. Weekly: 60 modules – LT tested, 59 were graded A, 1 module – to retest.

FNAL LT Testing Status Cumulative Weekly 99.45% 2 1067 20 59 Total 0.00% R7 R6 00 R5S R5N 99.44% 1 698 3 L56p 99.33% 2357 56 L34p L12sd L12su 100.00% 12 L12pd L12pu % Pass fFail Pass Fail   Cumulative Weekly