CCCM/SHELTER & NFI SECTOR MEETING

Slides:



Advertisements
Similar presentations
CCCM / Shelter / NFI Cluster 2012 Response Plan. Numbers Category of people in need Numbers of persons in need FemaleMaleTotal IDPs in camps 7,4467,47814,923.
Advertisements

CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
Shelter Meeting 10a CCCM CLUSTER UPDATE
11 th Steering Group Meeting March 24th, 2015 WELCOME!!
CONTRIBUTING TO FUND THE GLOBAL HUMANITARIAN SHELTER RESPONSE THE HAITI EXPERIENCE.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Shelter Cluster Vanuatu Meeting 23 July 2015 PWD Offices, Port-Vila.
7 th November SC Agenda – 7 th November 2012 Opening & Introductions Minutes of the meeting 3 rd October, including action.
Camp Coordination and Camp Management (CCCM) Global Cluster.
CLUSTER UPDATE Shelter Meeting 12a 24 May CCCM Goals improving living conditions, monitor standards, identify gaps and advocate for service provision.
Burundi refugee situation UNHCR Donors briefing Nairobi, 17 September 2015.
Tanna Shelter Cluster meeting 25 th May CLUSTER OBJECTIVE 1: Provide emergency shelter and non-food items for people whose houses have been partially.
Nutrition Sector Coordination
Wash Cluster / Kachin and North Shan states Clashes.
WASH Cluster Update 7/12/11 WASH CLUSTER PAKISTAN.
CARE in Emergency Shelter and Reconstruction. 1. What is Our commitment to Shelter? 2. What impact does Shelter have? 3. What are the programming options.
23 th Monthly meeting Abuja 14/06/2016. AGENDA 1. Opening remarks 2. Introduction of participants 3. Adoption of Agenda 4. Follow-up on actions plan (Mai.
WASH Cluster Meeting April 03, 2012 WASH CLUSTER PAKISTAN.
WaSH in Emergency Working Group Meeting
WaSH in Emergency Working Group Meeting
WaSH in Emergency Working Group Meeting
Development Partners Roundtable
SC Agenda – 26th September 2012
Emergency Cycle WFP Logistics, We Deliver.
WaSH in Emergency Working Group Meeting
Nigeria Factsheet–April 2017
Shelter Working Group Meeting Monday 16 June, 10AM
1st Round Sector Defense Returns and Early Reintegration
Shelter Working Group Meeting Thursday 6 July, 10AM
Peacebuilding Priority Plan Heads of Mission
WaSH in Emergency Working Group Meeting
Sub-National Shelter & NFI Cluster Coordination meeting for KRI
HNO/HRP Nutrition sector plan 2018
1st Round Sector Defense
International Coordination Meeting Emergency Operations Center
WaSH in Emergency Working Group Meeting
Dahuk Shelter & NFI Cluster Coordination Meeting
WaSH in Emergency Working Group Meeting
Food Security Sector Rohingyas crisis
Agenda Review of action points from previous meeting
WFP-UNICEF Emergency Cash Transfers to support Dominicans affected by Hurricane Maria Dominica, December 2017 – February 2018 November 30th, 2017.
(PERIOD: AUGUST 2017 TO 25TH FEB 2018)
Current Cluster Team Structure since 11th July 2017
AGORA Pilot Kampala Supporting policy making and aid programming in precarious urban neighborhoods hosting refugees 6th July 2018.
Sub-National Shelter & NFI Cluster Coordination meeting for C&S
SHELTER/NFI CCCM MEETING
Recovery Cluster Meeting
REFUGEE RETURNEES REGISTRATION
Shelter Cluster Palestine Building cluster capacity for assessments
Agenda Review of action points from previous meeting minutes (5mn);
The Wash Service Centers (WSC) Initiative
IRAQ Center/South Zones WASH Cluster Coordination Meeting
Agenda Review of action points from previous meeting
Food Security Sector – Cox’s Bazar
Integrated Inter-Cluster Training Package For Nutrition Outcomes
Transit and influx management
National Education Cluster Meeting
IRAQ Center/South Zones WASH Cluster Coordination Meeting
Food Security Sector – Cox’s Bazar
148 Transitional shelter This workshop discusses when to use transitional shelter, the common circumstances for using it, and its strengths, characteristics.
Nutrition Cluster Advocacy
Developing a shelter strategy
Accountability to Affected Population
LESSONS LEARNT AND 2019 RESPONSE PLAN WORKSHOP
133 Implementing settlement programmes
Displacement Tracking Matrix DTM; Sector 4W
TBC Cash Assistance Programme for IDPs in Southeast Myanmar
Situation Briefing – Cyclone IDAI
LESSONS LEARNT AND 2019 RESPONSE PLAN WORKSHOP
Disaster Preparedness and Response
Presentation transcript:

CCCM/SHELTER & NFI SECTOR MEETING NEMA OFFICE 28st June 2018

AGENDA Review of Action points Reception Management Strategy Rainy season updates Update on returns to Guzamala, Marte, Abadam and Teacher's village Proposed T-shelter design  AOB

I. REVIEW OF ACTION POINTS

ACTION POINTS Action Points Responsible Status Response in Ngala: Land to aid decongestion close to Arabic camp, PCNI to follow up on formal consent letter. (1) Sector to take the issue of military stopping construction with the requirement of fencing to the civil military coordination (2) PCNI Sector Done Shelter TWG Shelter TWG to finalize Transitional shelter pilot-design by 1st week of June (1) Sector to advocate for funding to enable piloting of proposed Transitional shelter designs targeting mostly returnee population in Bama (As proposed pilot location). (2) Sector to develop justification note for prepositioning and stockpiling of NFI kits, subsequent advocacy with donors for funding.(3) Sector to circulate template with partners to input existing capacities for stockpiled items that allows for flexibility to respond to sudden emergencies. (4) Shelter TWG partners Done (1) Ongoing (2) Ongoing (3) CCCM MHPSS capacity building Workshop to be organized targeting CCCM partners to enable mainstream MHPSS into CCCM. IOM - MHPSS

II. RECEPTION MANAGEMENT STRATEGY Population movements across the north-east continue to pose major issues for the response. The movements are mainly the result of ongoing military operations and hostilities, as well as other push and pull factors. In May, a total of 21,207 people arrived in various locations, further stretching the resources on the ground. With highest number recorded in Bama (3,461), Ngala (3,384), Gwoza (3,047), Dikwa (1,480) and Biu (1,266) LGAs.

RECEPTION MANAGEMENT STRATEGY RECEPTION CENTER MANAGEMENT

PROGRESS ON THE OPERATIONALISATION OF THE RECEPTION MANAGEMENT STRATEGY STEPS PROGRESS Development of the strategy Completed Establishment of the Reception center Almost completed for the selected location Reception of new arrival ongoing Reporting Not started

PHYSICAL ESTABLISHEMENT OF RECEPTION CENTER IN BORNO COMPLETED FACILITIES ONGOING/PLANNED FACILITIES JERE PULKA MAFA (80%) BAMA MONGOUNO DIKWA NGALA Existing unmet needs humanitarian service providers (capacity & commitment)

NEW ARRIVAL TRENDS IN BORNO AND ADAMAWA STATES

PILOT SITES: - PULKA (200 Households) - DIKWA (200 households) - NGALA (XXX households) - MONGUNO (100 households) WASH, PROTECTION, SHELTER/ NFI, CCCM, FOOD SECURITY, HEALTH sectors play key roles at the reception centers Trends of new arrivals are alarming and there is need to highlight the exit plans from the camps to the camps for normal programming. Major challenges revolve around the availability of land. If new arrivals cannot exit the reception centre then this will develop into a new settlement type.

PREPARATION (FOR ARRIVALS) STAGE; CONSTRUCTIONS RECEPTION CENTRE (CCCM PARTNER / RECEPTION CENTRE MANAGER) WASH FACILITIES (WASH SECTOR PARTNER) WATER SOURCE (WASH SECTOR PARTNER +RECEPTION CENTRE MANAGER) FOOD PREPOSITIONING ( FOOD SECURITY PARTNER) ARRIVAL STAGE (services provided and by who) Immediate/Rapid registration ( ETT/DTM) Health screening (HEALTH SECTOR PARTNER) Food and Nutrition. coordinated with FSS, food pipeline is confirm by WFP. Reception centre manager to designate a cooking area for the beneficiaries to prepare their own meals. Only challenge is cooking fuel. (FSS PARTNER AND NUTRITION SECTOR PARTNER) NFI partner to provide NFI kits to the new arrivals. Protection and GBV sub sector. (GBV SUB SECTOR)

EXIT PHASE Recommended length of stay is upto days ( due to shelter and NFI availability as well as pipeline challenges) SHELTER/ NFI PARTNERS TRANSFER to camp or host community and allocation of plot for settlement (CCCM PARTNER) SHELTER ASSISTANCE (SHELTER/ NFI PARTNER) FOOD RATION (FSS PARTNER) TRANSFER REPORT (CCCM PARTNER – RECEPTION CENTRE MANAGER)

JOINT RECEPTION MANAGEMENT SECTORS CHALLENGES CCCM Registration data not harmonized across sector Reception center management not enough inclusive Reception report unavailable SHELTER Provision of Emergency kits upon arrival is inexistent Inexistence of orientation to IDPs to find Shelter solution within the host community HEALTH ? NUTRITION WASH PROTECTION

What are the missing activities ? NEXT STEPS How can we collectively ensure that the reception center are functional with all sectors contribution? What are the missing activities ? Which sectors partners are selected per each location? How can we ensure collectively that IDPs do not stuck in reception center? How can we ensure that the stay period in reception center are not too long?

Update: Progress of Reception management 7 Reception centers to be established in Borno Completed facilities Jere (Custom house) Pulka Mafa Monguno: Almost completed Planned Bama Dikwa Ngala Challenges and Way forward Existing unmet needs humanitarian service providers (capacity & commitment) 174: Food ration 123 HHs: No shelters 698 Individuals (June 1st through 26th) – Dikawa, Konduga & Mafa

III. RAINY SEASON UPDATE

RAIN/STORM DAMAGE SITUATION ATTENTION! Need for Committee to conduct site monitoring visit Distribution of Emergency shelter Kits (Targeted response) Make shift shelter reinforcement Emergency shelter reinforcement Site upgrade Targeted & coordinated response to most vulnerable sites

Guzamala, Marte, Abadam and Teacher's village IV. SITUATION UPDATES Returns to; Guzamala, Marte, Abadam and Teacher's village

V. SHELTER TWG PROPOSED TS DESIGNS

Half plank + half tarpaulin: Half Mud + half tarpaulin: 1 2 Half plank + half tarpaulin: Half Mud + half tarpaulin: Complete mud bricks as walling system: Unit Cost: USD 585.11 Beneficiary contribution: USD 126.73 Actual Unit cost: USD 458.38 3.

Actions/Recommendation Design committee to revise the BoQ for Mud housing to reflect beneficiary contribution in each of its phases and give feedback latest on Monday the 25th of June 2018. Design to be presented at the next sector meeting scheduled for 28th June 2018. Design committee to re-visit the remaining two options to clearly highlight beneficiary contribution in each of the Transitional shelter options. TWG to set up a committee of partners willing to be part of the Shelter quality monitoring before the next TWG. A proposal was meant on the need for the Shelter TWG to establish a quality check committee that will be responsible and act as Technical vanguards for - site monitoring visits to highlight and document best practices in shelter construction, making onsite recommendations where design specifications are not adhered to.

A.O.B