INSTITUTE OF HIGH ENERGY PHYSICS

Slides:



Advertisements
Similar presentations
PRESSURE TEST Hook tester up to tank inlet line. Pump tester up to 10psi (.7 bar) The line and carb should hold pressure for 1-min. Checks for leaks at.
Advertisements

RHIC CRYOGENICS SYSTEM Time meeting /28/20141TIME MEETING RUN 14 –CRYOGENIC.
Progress and Plan for Superconducting RF Cavity RF Group.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Cleanroom refurbishment in SM18 Upgrade for the SPL high gradient resonators 26/11/2010J. Chambrillon - CERN BE/RF1.
1 BCD/ACD developments for Cavities Several improvements are needed on both BCD/ACD A significant amount of R&D work is needed to resolve issues –Quality.
1 Eiji Kako (KEK) in cooperation with Japanese Industries IPAC-2010 Satellite Workshop, Kyoto, May 23, A Satellite Workshop at IPAC Superconducting.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
NCP-CERN Project status Waqar Ahmed. Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 2/21/
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Hao Guo LINAC Department Institute of Modern Physics.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. CLEAN ROOM SPECIFICATIONS FOR PROJECTS TTC topical workshop on clean.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Field emission in SRF Cavities
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
Cryomodule Assembly Facility Fermilab Cleanroom Tug Arkan 1.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Survey the cavity degradation mechanism under Dis assembly/assembly procedure for cERL cryomodule at KEK 1 Hiroshi Sakai, Takaaki Furuya, Masato Sato,
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Review of clean room procedures for the HL-LHC Crab Cavity Program Reviewers: John Mammosser, ORNL (chair); Stephane Berry, CEA; Vittorio Parma, Mathieu.
Tongming Huang (IHEP) On behalf of the power coupler working group
Cryomdoule Test Stand.
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
Assembly of Crab Cavities couplers in SM18 clean room
DESY Experiences on Use of Gas overlay during Assemblies
Mark Pendleton – STFC Daresbury Laboratory
Cleanroom Upgrade in SM18 Optical Inspection bench
Operating SRF systems reliably in a “dirty” accelerator
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Mathieu, Gabriel, Max, Spyros, Guillaume
S0 Status report from KEK
C50 Cavity pair Assembly Changes
Replacement of coupler and recovery of cavity for BEPCII
Tuesday 11th September LHCb dipole presently fault off
Action People Time [h] Shutting down the SR 2 1
WP 3 coordination meeting Saclay May 2008
Degradation and possible sources Statistic of resonators
RF test results of SRF cavity evacuated with NEG pump
IMP Cryomodule Assembly and Alignment
IHEP Cryomodule Status
Ari D. Palczewski, PhD SRF Staff Scientist 09/12/16
ISRC and LEBT Vacuum System Design
SNS Coupler Shipping Plans
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

INSTITUTE OF HIGH ENERGY PHYSICS 中国科学院高能物理研究所 INSTITUTE OF HIGH ENERGY PHYSICS Clean room and Cryomodule assembly area Jin Dai 2017.07.14

Outline Clean room layout Equipment in clean room Cryomodule assembly area

Hall #2 map

Coupler clean room Reception Leak check Storage Cleaning processing Clean assembly Assembly leak check Baking Conditioning Dismounting and packing Delivery

Cavity assembly clean room Water cleaning Ultrasonic cleaning High pressure rinsing Clean room assembly Cavity string assembly To cryomodule area

Cavity string assembly Day1 cleaning, flange check, gasket preparation Day2 1st HPR+dry Day3 assembly+leak check Day4 2nd HPR+dry Day5 assembly+leak check+baking Day6 baking Day7 mount to dewar Day8 waiting Day9 cooling Day10 VT Day11 rewarming Day12 out of dewar Day13 disassembly Day14 string assembly Day15 Day16 Day17 Day18 Day19 Day20 leak check, out of cleanroom Day21 Day22 Day23 Day24 Day25 Day26 Day27 Day28 Day29 Day30 Manpower of string #1 is released Shift to string #2 10 days period of one cavity string assembly

Equipment in clean room Vacuum system Dry pump Leakage meter TP Pneumatic valve ⑤ ② ④ ① Slow pumping valve ② Fast pumping valve ③ Inflation valve ④ Dry pumping valve ⑤ Leak check valve ① ③ 1atm inflation valve MFC Slow pumping:close 2,3,5 , open 1,4 Fast pumping :close 1,3,5, open 2,4 Leak check:open 5,close 1, 2, 3, 4 Inflation:open 3,close 1, 2, 4, 5

Equipment in clean room

Equipment in clean room

Equipment in clean room Specifications for Water yield: 3 ton Resistivity (ions and metals): 18 ΜΩ⋅cm TOC (Total Organic Carbon), less than 10ppb, monitor online Particle: monitor online, at the spray wand outlet

Equipment in clean room

Equipment in clean room High pressure rinsing system Set-up HPR stand in ISO 4 Nozzles: sapphire nozzles Wanner pump G15X: nitrile rubber for diaphragm and gasket, 316L SS for pump head Trickle flow all time to reduce bacteria risk Pall 40nm filter PTFE gasket Water flow: 16L/min Pressure: 100 bar Cleaning hole:650x800mm

Equipment in clean room Liquefied nitrogen, no risk of “dirty” bottles Purity: 1 ppm

Equipment in clean room

Cavity string assembly

Cryomodule assembly 15x36

Cryomodule assembly 15x36

thanks!