Located at Tufts University in Boston, Massachusitts

Slides:



Advertisements
Similar presentations
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
Advertisements

Federal Reserve Bank of Boston Case Study
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
“Enerpak” Units » Propeller Type Fan » Size 100 – 400 MBH » 80% Thermal Efficiency » Natural or LP Gas » 10 Year Warranty on Heat Exchanger, Burners,
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Geothermal Retrofit of HVAC Systems
1Taylor Engineering, LLC Group Think Mark Hydeman, P.E., FASHRAE Taylor Engineering, LLC
The Hearst Tower 959 Eighth Avenue New York, NY
Futureview Solar Solutions Elysburg, Pa. Call
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
BCT 102 Residential Printreading
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Green Building Design - Gold LEED Award TOYOTA Corporate Real Estate & Facilities Torrance, CA Project Team Owner: Toyota Motor Sales Construction Manager.
Precedent Analysis arc 572 UT Solar Decathlon 2009 BLOOMhouse University of Texas at Austin I 2007 ARCHITECTURE I INTERIOR I TECHNOLOGY I SOCIETY architecture.
North Pocono High School
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
Foundation Plan Layout
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Spring 2007 Senior Thesis Justin D. Schultz Mechanical Option The Hauptman-Woodward Medical Research Institute Dedicated Outdoor Air Applications at the.
Lehigh Valley Heritage Center Jarod F. Stanton Mechanical Option Penn State Architectural Engineering.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Outreach Innovation Building Kyle Pepperman The Pennsylvania State University Architectural Engineering Senior Thesis Spring 2005.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Andrew Diehl, EIT The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project.
A10.01 Project Description:
Integrating a Data Center into an Engineering Laboratory Building
Technology in Architecture
David Anderson Mechanical Option
Redifer Commons Addition & Renovation Project
Grunenwald Science and Technology Building
Drawing Interpretation
A10.01 Project Description:
Council Rock High School South
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Biobehavioral Health Building, University Park, PA
The Bond Street Wharf Baltimore, Maryland
Senior Thesis Presentation
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Lehigh Valley Heritage Center
Project: 250 West Street, Columbus, Ohio
© OnCourse Learning.
Presentation transcript:

Located at Tufts University in Boston, Massachusitts Jaharis Family Center for Biomedical and Nutritional Research Located at Tufts University in Boston, Massachusitts Architectural Features Nine story facade transitioning to five stories to tie together the grand university scale to the residential scale on the opposing side. Brick veneer base with granite water table inspired by adjacent historic brownstones Nearby bay windows called for aluminum and glass curtain wall set off by brick piers mounted in a series of bay windows. ARC Architects Primary Project Team Building Uses Mechanical Systems The Jaharis Center is a 180,000 square foot multi-use facility. Floors 1–3 are predominantly for classroom and office use, while floors 4 – 9 are laboratory space. It Features a 202 person auditorium, and a café with prep areas. Structural Systems ● 100% Outdoor Air ● All Air Supplied Via VAV/CAV Boxes With Hot Water Terminal Reheat ● 4 Identical, Custom AHU Supplying 70,000 Max cfm ● Perimeter Finned-Tube Radiation Heating ● Air Side Finned Tube Heat Recovery rated at 9792 MBH ● One 800 nom. ton Double Effect Steam Absorption Chiller ● One 600 nom. ton (high efficiency) Centrifugal Chiller ● Two Inducted Draft Cooling Towers, One Single and One Double Cell Cooling 1824 nom tons together Electrical ● 480Y/277 3-phase, 4 wire - Composite Metal Deck ConcreteFlooring System - Structural Cantilevered Grade Beam Foundation Composite Steel System With Braced Frames • Total Project Cost of $63 Million • Design-Bid-Build Project Delivery Method / Lump Sum • Construction began in Jan 2001, and was completed in August 2003 Construction Reed Berinato ARC Architects Mechanical Option rrb144@psu.edu www.arche.psu.edu/thesis/2005/rrb144