Task Group Process Overview

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0778r0 Report June 2014 Dorothy Stanley (Aruba Networks) Slide 1 P802.11REVmc Status and Overview Date: Authors:
Advertisements

Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /1301r0 Submission September 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG September 2014 Closing Report Date: Authors:
IEEE r q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /0705r1 Submission July 2010 Bruce Kraemer (Marvell)Slide Revision extension under IEEE-SA Operations Manual subclause
Doc.: IEEE Submission November 2004 Robert F. HeileSlide rd Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE Submission November 2008 Robert F. Heile, ZigBee AllianceSlide th Session of meetings of the IEEE Working.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0724r1 Submission May 2007 Darwin Engwer, Nortel NetworksSlide 1 VHT Study Group Thoughts Notice: This document has been prepared.
Doc.: IEEE /1445r1 Submission TGad November 2011 Closing Report November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors:
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
A Proposed Timeline for IEEE ba TG
VHT SG Report to EC Date: Authors: November 2008 April 2007
VHTL6 task group work plan proposal (VHTL < 6 GHz)
IEEE TGa Project Timeline
VHT Metrics Considerations
TGad Process Overview Date: Authors: January 2009
VHT SG Report to EC Date: Authors: July 2008 April 2007
IEEE aj Process Overview
TGac Documents and Timeline
TGad September 2010 Closing Report
Submission Title: [TG3 BSIG PM Pitch 16Jun00]
Sub-1 GHz Study Group Closing Report Sept 2018
Proposal for TGad Selection Procedure and Timeline
Submission Title: TG4r Sept 2014 Closing Report
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3f Closing Report for July 2017.
VHT SG September 2008 Closing Report
Revision Process Summary
doc.: IEEE /468r0 November 11-15, 2002 Hyatt Regency Kauai
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3f Closing Report for July 2017.
[VHT SG Approach Proposal]
VHT SG Report to EC Date: Authors: July 2008 April 2007
<month year> doc.: IEEE /271r0 September, 2000
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2014]
Task Group ac Process Overview
March 2018 Opening Report Date: Authors: March 2018
Submission Title: ULP TG Closing Report Nanjing China
Submission Title: Modification of time planning for the task group 3d
VHT SG September 2007 Closing Report
<month year> doc.: IEEE < e> <November 2018>
TGac Status and Timeline
IEEE aj Process Overview
QoSMAN SG Closing Report – Sept 2009
Submission Title: ULP TG Closing Report Dallas Texas
VHT Metrics Considerations
VHT SG July 2008 Closing Report
Sub 1 GHz license-exempt operation Closing Report for September 2010
VHTL6 Throughput Metric Thoughts
IEEE aj Process Overview
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3f Closing Report for July 2017.
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2015]
Task Group Process Overview
Tgae Closing Report – November 2009
Proposed work items and timeline for the LC SG
Proposal for TGac Selection Procedure
QoSMAN SG Closing Report – Nov 2009
Submission Title: TG4r November 2014 Closing Report
VHT SG November 2008 Closing Report
IEEE SGa Project Timeline
IEEE Revision Timeline
November 2018 Opening Report
Submission Title: Opening Report for the TG6 Session in September 2008
Timeline for the Light Communications TG
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3f Closing Report for July 2017.
Submission Title: Opening Report for the TG6 Session in November 2008
TGac January 2009 Closing Report
May 2008 Closing Plenary Motions
Nov 2018 Sub 1 GHz Study Group Date: Authors: Nov 2018
May 2011 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Comparison of Responses to Task Group j.
Presentation transcript:

Task Group Process Overview November 2008 doc.: IEEE 802.11-08/1395r0 November 2008 Task Group Process Overview Date: 2008-11-12 Authors: Darwin Engwer, Nortel Networks Darwin Engwer, Nortel Networks

November 2008 doc.: IEEE 802.11-08/1395r0 November 2008 Abstract An overview of the typical task group process as it relates to TGac. Darwin Engwer, Nortel Networks Darwin Engwer, Nortel Networks

Overview of Task Group Steps November 2008 Overview of Task Group Steps Form Study Group (SG) Study (is the task feasible?) Construct PAR Form Task Group (TG) Staff the task group Chair Secretary Leaders for the 4 controlling docs Prepare controlling docs Issue RFP Hear proposals Select from amongst proposals Internal review of draft (letter ballot) Incremental revisions(1) - as challenges/ opportunities are uncovered External review of draft (sponsor ballot) Incremental revisions(2)? - as challenges/ opportunities are uncovered Publish draft as an 802.11 amendment Darwin Engwer, Nortel Networks

Controlling Documents (envisioned) November 2008 Controlling Documents (envisioned) Functional requirements Channel models Comparison criteria Selection procedure Recommend prioritizing that list (in the order shown) Although some can be done in parallel Preferred completion order is as shown Darwin Engwer, Nortel Networks

Other Considerations Discuss/ agree upon TG working process. November 2008 Other Considerations Discuss/ agree upon TG working process. When issue CFP? Identify work areas that can be developed in conjunction with VHT60: MAC functions, e.g. “session mgmt” Space-time channel management Darwin Engwer, Nortel Networks

References 11-08-1392-00-0vht-inputs-for-a-vht-selection-procedure.ppt November 2008 References 11-08-1392-00-0vht-inputs-for-a-vht-selection-procedure.ppt 11-08-1036-05-0vht-september-report.ppt 11-08-0579-01-0vht-towards-an-improved-proposal-development-process-for-vht.ppt 11-08-0807-04-0vht-below-6-ghz-par-nescom-form-plus-5cs.doc Darwin Engwer, Nortel Networks