API 16B June 2017 Specification for Coiled Tubing, Snubbing and Wireline Well Control Stack Equipment Chairman – Alex Sas-Jaworsky PE Vice-Chairman –

Slides:



Advertisements
Similar presentations
API Specification 6A Furnace Calibration Requirements
Advertisements

SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
SC 18 – SC 11 Report – Field Operating Equipment Chair: Darrell Copsey, John Crane Vice Chair: TBD Secretary: Norman W. Hein, Jr., CONSOL Energy – CNX.
API 16 AR Specification for Drill-through Equipment Remanufacturing
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
11 Ed Baniak Senior Standards Associate Washington, DC January 28, 2010 API Report API-AGA Joint Committee 2010 API ECS Winter Conference New Orleans,
New Item API Specification 6A Furnace Calibration Requirements Tim Haeberle 30 June 2011.
1 API 16 AR Specification for Drill- through Equipment Remanufacturing Summer Standards Meeting Communication Jan van Wijk / Chris Johnson API-16AR chairman.
API Subcommittee 17 Industry Standards for Subsea Equipment
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
NAAQS Altitude Effects Ozone Transport Commission Annual Meeting June 11, 2014 Baltimore, MD Will Ollison 1220 L Street, NW Washington, DC
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 14 June 2012 SC6 Summer Meeting - Westminster, CO1.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
Yong-Yi Wang, Chair API 1104 Committee Meeting Washington, DC June 30, 2010 Report of Fracture Mechanics Subcommittee.
FALLS CHURCH/VIENNA ONLINE FUNDRAISING CHALLENGE BEGINNING FROM 10:00PM, FRIDAY, MAY 17 TH - 10:00PM, FRIDAY, MAY 31 ST.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
FCC Ex Parte March 11, 2004 ATIS 1200 G St. N.W. Suite 500 Washington, DC ATIS Lawfully Authorized Electronic Surveillance Activity.
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
Better Elections Using Voting vTool Mark Ciechanowski, P.E. Region 4 Meeting January 22-24, 2010 Detroit, Michigan.
Subcommittee 21 - Materials Act as a resource on materials issues affecting multiple subcommittees under the Committee on Standardization of Oilfield Equipment.
Supply Chain Management Report for SC 18 January 2013.
Completion & Production Services
Tim Haeberle API SC Winter Meeting
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Accredited Standards Committee C63® - EMC
Moving Companies in VA Moving Companies in Washington DC.
API 16C Choke and Kill Equipment
API 16F June 2017 Specification for Marine Drilling Riser Equipment
Status Update on API 16Q / 16R / 16F
ISO TC64/SC4/WG2 June 2010 status
API 16A June 2017 Specification for Drill-through Equipment
Optimization of O3 NAAQS Compliance Networks
2016 Exploration & Production Standards Conference Subcommittee 10
API 16RCD June 2017 Specification for Rotating Control Devices – Update.
Specification on float equipment
ISO TC64/SC4/WG2 May 2011 status
API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
API Summer Standardization Conference
API 16AR Specification for Drill-through Equipment Remanufacturing
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API RP 59 June 2017 Recommended Practice for Well Control Operations
API Standard 53 Update June 2017
API 16 AR Specification for Drill-through Equipment Remanufacturing
Reading: ‘Washington, DC’
Specification on float equipment
Ozone Monitoring Issues & Opportunities
API 16 AR Specification for Drill-through Equipment Remanufacturing
API SC 10 WG15 Stage Cementing Collars
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
Solutions Summit Series
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Steel Section 232 Program Report
Float Equipment API Spec 10F
API SC6 Valves and Wellhead Equipment
API RP 16AS January 2019 Standard for BOP Systems
API 16C Choke and Kill Equipment
API 16A January 24, 2019 Winter Conference – San Antonio
API STANDARD 64 THIRD EDITION, AUGUST 2017 ADDENDUM 1, DECEMBER 2018 ERRATA 1, MARCH 2018 Diverter Equipment Systems.
API RP 59 Well Control Operations Chair – Tom Proehl
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

API 16B June 2017 Specification for Coiled Tubing, Snubbing and Wireline Well Control Stack Equipment Chairman – Alex Sas-Jaworsky PE Vice-Chairman – Steve Deshotels Secretary – Jessica Lin

Current Activities Coiled Tubing, Wireline and Snubbing Groups Working Through Section 4 Qualification Test Requirement for the Prescribed Service (Using Spec 16A as Template) Scheduling WebEx Meetings Through Summer & Fall of 2017 to Complete The Qualification and Acceptance Tests Consistent With Spec 16A for Each Service Line 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

Current Activities Projected Completion of Section 4 Development by 1st Qtr 2018 Continued Development of Gas Testing Processes and HPHT Issues Projecting Completion of Spec 16B for Letter Ballot in 4th Qtr 2018 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org