Individual values VS Averages

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

Statistical Process Control Using Control Charts to Monitor “Quality”
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Quality Management 09. lecture Statistical process control.
VIII Measure - Capability and Measurement
Introduction to Summary Statistics
Chapter 5a Process Capability This chapter introduces the topic of process capability studies. The theory behind process capability and the calculation.
Quality Control Chapter 8- Control Charts for Attributes
Chapter 9- Control Charts for Attributes
 Variable - a single quality characteristic that can be measured on a numerical scale.  When working with variables, we should monitor both the mean.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
INT 506/706: Total Quality Management Lec #6, Process Capability.
BPT2423 – STATISTICAL PROCESS CONTROL.  Estimation of Population σ from Sample Data  Control Limits versus Specification Limits  The 6σ Spread versus.
Control Charts for Moving Averages
Chapter 51Introduction to Statistical Quality Control, 5th Edition by Douglas C. Montgomery. Copyright (c) 2005 John Wiley & Sons, Inc.
Chapter 6 – Part 4 Process Capability.
Statistical Process Control (SPC)
Quality Control Chapter 5- Control Charts for Variables
Process Capability Process capability For Variables
12.3 – Measures of Dispersion Dispersion is another analytical method to study data. Two of the most common measures of dispersion are the range and the.
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
36.1 Introduction Objective of Quality Engineering:
Statistical Process Control (SPC) Chapter 6. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work Design.
Control Charts for Attributes
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
Chapter 6. Control Charts for Variables. Subgroup Data with Unknown  and 
Chapter 4 Control Charts for Measurements with Subgrouping (for One Variable)
Chapter 23 Process Capability. Objectives Define, select, and calculate process capability. Define, select, and calculate process performance.
Reid & Sanders, Operations Management © Wiley 2002 Statistical Quality Control 6 C H A P T E R.
Chapter 7 Statistical Inference: Estimating a Population Mean.
ENGM 620: Quality Management Session 8 – 30 October 2012 Process Capability.
Higher National Certificate in Engineering Unit 36 –Lesson 4 – Parameters used to Describe the Normal Distribution.
Chapter 61Introduction to Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2012 John Wiley & Sons, Inc.
 2012 Pearson Education, Inc. Slide Chapter 12 Statistics.
Process Capability What it is
Tech 31: Unit 3 Control Charts for Variables
Chapter 5a Process Capability
Process Capability and Capability Index
Statistical Quality Control, 7th Edition by Douglas C. Montgomery.
Chapter 12 Statistics 2012 Pearson Education, Inc.
36.1 Introduction Objective of Quality Engineering:
Copyright (c) 2005 John Wiley & Sons, Inc.
Process capability in JMP 12 –A new look
Higher National Certificate in Engineering
Agenda Review homework Lecture/discussion Week 10 assignment
Probability and the Sampling Distribution
What is the point of these sports?
Higher National Certificate in Engineering
CHAPTER 6 Control Charts for Variables
Step M2 – Variable Process Capability
DSQR Training Process Capability & Performance
Process Capability Process capability For Variables
CHAPTER 6 Control Charts for Variables
Basic Training for Statistical Process Control
Basic Training for Statistical Process Control
Process and Performance Capability Assessment
Process Capability.
ENGM 621: SPC Process Capability.
ENGM 620: Quality Management
Process and Performance Capability Assessment
Control chart (Ex 3-2) Subgroup No. Measurement Average Range Date
Process and Measurement System Capability Analysis
Control chart (Ex 5-3) Subgroup No. Measurement Average Range Date
Special Control Charts II
Quality Control Methods
Chapter 12 Statistics.
BENEFITS OF AUTOMATED SPC
Process Capability What it is
Process Capability 1, Jatco Requirements 2, Cmk, Cpk, Ppk Explanation
Presumptions Subgroups (samples) of data are formed.
Presentation transcript:

Individual values VS Averages Comparison of individual values compared to averages

Individual values VS Averages Calculations of the average for both the individual values and for the subgroup averages are the same. However the sample standard deviation is different. Besterfield Quality Control 8th Ed

Besterfield Quality Control 8th Ed Central Limit Theorem If the population from which samples are taken is not normal, the distribution of sample averages will tend toward normality provided that the sample size, n, is at least 4. This tendency gets better and better as the sample size gets larger. Besterfield Quality Control 8th Ed

Illustration of central limit theorem

Central Limit Theorem Dice illustration of central limit theorem Besterfield Quality Control 8th Ed

Control Limits & Specifications Figure 5-21 Relationship of limits, specifications, and distributions Besterfield Quality Control 8th Ed

Control Limits & Specifications The control limits are established as a function of the average (ค่า control limits เป็นค่าที่คำนวนจากค่าเฉลี่ยที่ได้จากการเก็บข้อมูล) Specifications are the permissible variation in the size of the part and are, therefore, for individual values (ค่า Specifications เป็นค่าที่กำหนดขึ้นเพื่อใช้เป็นขอบเขตของการกระจายสำหรับค่าของข้อมูลแต่ละตัว) The specifications or tolerance limits are established by design engineers or customers to meet a particular function Besterfield Quality Control 8th Ed

Process Capability & Tolerance The process spread will be referred to as the process capability and is equal to 6σ The difference between specifications is called the tolerance When the tolerance is established by the design engineer without regard to the spread of the process, undesirable situations can result Besterfield Quality Control 8th Ed

Process Capability & Tolerance Three situations are possible: Case I: When the process capability is less than the tolerance 6σ<USL-LSL Case II: When the process capability is equal to the tolerance 6σ=USL-LSL Case III: When the process capability is greater than the tolerance 6σ >USL-LSL Besterfield Quality Control 8th Ed

Process Capability & Tolerance Case I: When the process capability is less than the tolerance 6σ<USL-LSL Case I 6σ<USL-LSL Besterfield Quality Control 8th Ed

Process Capability & Tolerance Case II: When the process capability is less than the tolerance 6σ=USL-LSL Case I 6σ=USL-LSL Besterfield Quality Control 8th Ed

Process Capability & Tolerance Case III: When the process capability is less than the tolerance 6σ>USL-LSL Case I 6σ>USL-LSL Besterfield Quality Control 8th Ed

Capability Index Process capability and specifications or tolerance are combined to form the capability index, Cp.

Besterfield Quality Control 8th Ed Capability Index The capability index does not measure process performance in terms of the nominal or target value. This measure is accomplished by Cpk. Besterfield Quality Control 8th Ed

Besterfield Quality Control 8th Ed Capability Index The Cp value does not change as the process center changes Cp = Cpk when the process is centered Cpk is always equal to or less than Cp A Cpk = 1 (and Cpk = 1.33) is a de facto standard. It indicates that the process is producing product that conforms to specifications A Cpk < 1 indicates that the process is producing product that does not conform to specifications Besterfield Quality Control 8th Ed

Besterfield Quality Control 8th Ed Capability Index A Cp < 1 indicates that the process is not capable A Cpk = 0 indicates the average is equal to one of the specification limits A negative Cpk value indicates that the average is outside the specifications Besterfield Quality Control 8th Ed

Cpk Measures Cpk = negative number Cpk = zero Cpk = between 0 and 1 Cpk = 1 (and Cp = 1) Cpk > 1

1-How to estimate Process Capability This following method of calculating the process capability assumes that the process is stable or in statistical control: Take 25 (g) subgroups of size 4 for a total of 100 measurements Calculate the range, R, for each subgroup Calculate the average range, = ΣR/g Calculate the estimate of the population standard deviation using: Process capability will equal 6σ0

2-How to estimate Process Capability The process capability can also be obtained by using the standard deviation: Take 25 (g) subgroups of size 4 for a total of 100 measurements Calculate the sample standard deviation, s, for each subgroup Calculate the average sample standard deviation, = Σs/g Calculate the estimate of the population standard deviation Process capability will equal 6σo

Capability Index (EX. 5-4) A new process is started, and the sum of the sample standard deviations for 25 groups of size 4 is 105. Approximate the process capability. Determine the capability index before (σo = 0.038) and after (σo = 0.03) improvement using specification of 6.40 ± 0.15. What is the Cpk value after improvement for Question 1 when the process center is 6.40? When the process center is 6.30? A new process is started, and the sum of the sample standard deviations for 25 subgroups of size 4 is 750. If the specifications are 700 ± 80, what is the process capability index? What action would you recommend?

Additional control charts Standard deviation chart (or s chart) This chart is nearly the same X-bar and R chart. However, for subgroup sizes ≥ 10, an s chart is more accurate than an R Chart Moving average and Moving range chart This chart is used to combine a number of individual values and plot them on the chart. This technique is quite common in the chemical industry, where only one reading (datum) is possible at a time ( Can chemical engineering students give an example?) Exponential Weighted Moving-Average (EWMA) chart The EWMA chart gives the greatest weight to the most recent data and less weight to all previous data. It primary advantage is the ability to detect small shifts in the process average; however, it does not react as quickly to large shifts as the X-bar chart.

S Control Chart For subgroup sizes ≥10, an s chart is more accurate than an R Chart. Trial control limits are given by:

Revised Limits for S control chart

S chart (Ex. 5-5) Subgroup No. Measurement Average S.D. Date Time X1 X-bar S Comment 1 12/26 8:50 6.35 6.40 6.32 6.37 0.034 2 11:30 6.46 6.36 6.41 0.045 3 1:45 6.34 0.028 4 3:45 6.69 6.64 6.68 6.59 New, temporary operator 5 4:20 6.38 6.44 0.042 6 12/27 8:35 6.42 6.43 0.041 7 9:00 0.024 8 9:40 6.33 9 1:30 6.48 6.47 6.45 0.018 10 2:50 11 12/28 8:30 6.39 0.014 12 1:35 0.020 13 2:25 0.051 14 2:35 0.032 15 3:35 6.50 0.036

S chart (Ex. 5-5) Subgroup No. Measurement Average Range Date Time X1 X-bar S Comment 16 12/29 8:25 6.33 6.35 6.29 6.39 6.34 0.042 17 9:25 6.41 6.4 6.36 0.056 Damaged oil line 18 11:00 6.38 6.44 6.28 6.58 6.42 0.125 19 2:35 6.37 0.025 20 3:15 6.56 6.55 6.45 6.48 6.51 0.054 Bad material 21 12/30 9:35 6.40 0.036 22 10:20 0.029 23 11:35 0.024 24 2:00 6.43 25 4:25

Moving average and Moving range chart This chart is used to combine a number of individual values and plot them on the chart. This technique is quite common in the chemical industry, where only one reading (datum) is possible at a time Value Three-period moving sum X-bar R 35 - 26 28 35+26+28 =89 (35+26+28)/3 =29.6 35-26 = 9 32 86 28.6 6 36 96 8 .   Sx-bar = SR =

Exponential Weighted Moving-Average (EWMA) chart

Exponential Weighted Moving-Average (EWMA) chart

Exponential Weighted Moving-Average (EWMA) chart (EX. 5-6)

Exponential Weighted Moving-Average (EWMA) chart

Quiz 5-1

Quiz 5-2 Control charts for X-bar and R are to be established on a certain dimension part, measured in millimeters. Data were collected in subgroup sizes of 6 and are given below. Determine the trial central and control limits. Assume assignable causes and revise the central line and limits. Subgroup Number X-bar R 1 20.35 0.34 14 20.41 0.36 2 20.40 15 20.45 3 20.36 0.32 16 20.34 4 20.65 17 0.37 5 20.20 18 20.42 0.73 6 0.35 19 20.50 0.38 7 20.43 0.31 20 20.31 8 20.37 21 20.39 9 20.48 0.30 22 0.33 10 23 11 0.29 24 12 20.38 25 13 20.4  

Quiz 5-3 Control charts for X-bar and s are to be established on the Brinell hardness of hardened tool steel in kilograms per square millimeter. Data for subgroup sizes of 8 are shown below. Determine the trail central lime and control limits for the X-bar and s charts. Assume that the out-of-control points have assignable causes. Calculate the revised limits and central line. Subgroup Number X-bar S.D. 1 540 26 14 551 24 2 534 23 15 522 29 3 545 16 579 4 561 27 17 549 28 5 576 25 18 508 6 523 50 19 569 22 7 571 20 574 8 547 21 563 33 9 584 10 552 548 11 541 556 12 553 13 546

Quiz 5-4 Use data in Quiz 5-2 to establish EWMA chart, using  = 0.1 Subgroup Number X-bar R 1 20.35 0.34 14 20.41 0.36 2 20.40 15 20.45 3 20.36 0.32 16 20.34 4 20.65 17 0.37 5 20.20 18 20.42 0.73 6 0.35 19 20.50 0.38 7 20.43 0.31 20 20.31 8 20.37 21 20.39 9 20.48 0.30 22 0.33 10 23 11 0.29 24 12 20.38 25 13 20.4