DOM Assembly SUBATECH status H. Carduner, Bari June 12-15.

Slides:



Advertisements
Similar presentations
Student-led By:Katie R. Summary of the year This year I have learned many things. I have learned about the rock and carbon cycle, boron models, the periodic.
Advertisements

STI Test Facility: Photos Taken in Test Area and Two Labs: 18 May 2006.
GNSO Policy Development Process. “The PDP is broken”….. Photo credit: 2013 NYCitywoman.
Redding PBS Program “Striving toward success and responsibility through whole school support.”
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
DCal Meeting
Food Technology/ Culinary 2 Joan Wikre Room 1720 Welcome Students!
Training Manual and Lab Activities   Overview of manual   How to develop IPAP   Develop lesson plan   Your Lab orientation   Things to Remember.
When: September 30 th through October 2 nd, 2014 Where: WaterFurnace Factory, Ft. Wayne IN Cost: $375 pp. Online registration, credit card only. 1 st 15.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
ERDF for Education And Science Ministry of Education And Science 1st of October 2013.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Kindergarten Planning Guide PDU September 16, 2008.
INTRO TO COSTRUCTION 150 ELECTRONICS FOR ELECTRICANS SPRING 2014.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Science in NHPS. Science Teacher Day MS 8:00-9:00 – Important announcements/ideas/dates – Overview of last year, student learning results – Discussion.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
Tracker Summary Alan Bross MICE CM October 10, 2007.
Technical Support Activities in PH-ADO-PO
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
QBC Europe and its facilities. Building purchased – 1 st August 2006 Open for business – 6 th October 2006.
Developing a Teaching Portfolio Jaclyn Mueller OCN750 Spring 2013.
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
DOM INTEGRATION MEETING DAAN VAN EIJK 1 OCTOBER 2015.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
FRC Season Safety Team Safety Manual Read through the manual, be ready to take a test over the material, think of it as a driving test.
E-Rate WHERE TO START?. E-Rate Process /474 Contract FCDL Audit 471 ESL Review 10 yr.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
WG1 Decommissioning Kickoff Workshop WG1 Decommissioning Kickoff Workshop Long term Storage & ID tooling management R. Vuillermet on behalf of TC team.
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
CSG Survey Highlights October 4 CSG T& L Workshop.
Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 1 Status of Aerogel Reconstruction –Track association implemented in CGL. –Raw data (ADC, TDC)
Users’ Office News Doris Chromek-Burckhart Head of Users’ Office Grey Book Release New documents on Responsibilities of Institutes and Team Leaders.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Unit 5a. Managerial activities and administrative controls: exercise TB Infection Control Training for Managers at National and Subnational level.
Organizing future KM3NeT production 06-July-2010.
1 RD51 Kolimpari June 2009 Stéphan AUNE, BULK lab at Saclay.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
PANDA, GSI, Electrically Cooled Ge-Detectors development Status Report I. Kojouharov.
BUS 611 Week 4 Assignment Integrated Project Management To purchase this material link
DOM & DU tendering and assembly
Working Party on Noise (GRB) General information and WP.29 highlights
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Microsoft® IT Academy in Rockingham County Public Schools
Concluding remarks E. Migneco
CSP 25th November 2010 Technical agreement number 3: overview
San Luis Potosi – New plant April 24th 2015
Collaboration meeting 26 to 28 June 2017
Status of the Mechanics at Ciemat.
15 Tips on How to Study in College and Where to
The Basics Chuck Oravec
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Projects underway Mapping EE standards Standby conference
EHN1 Neutrino Installation Plans
Managing the case experience for undergraduate business students
League for Innovation in the Community College March 29, 2010
Subgroup Digitalization
Afterschool Program By. Rinni Christian.
ABOUT THE COLLEGE Professional Culture
Mike Sherwood PEARL Lab Manager
ONAP Release Planning DRAFT Proposal
Presentation transcript:

DOM Assembly SUBATECH status H. Carduner, Bari June 12-15

First idea proposed by the lab Rooms First idea proposed by the lab Assembly: 30m2 Proposed by the lab, September 1st Storage: 50m2 Proposed by the lab, September 1st near the assembly room DOM/VEOC: 40m2 Mechanical workshop, free zone Crane and truck access

Assembly room Leak detector DOM integration table DOM closing table DOM rack

Assembly room

Assembly room

DOM/VEOC

TOOLS & HR Tools and equipment's: Human resources: Orders have started (CPPM, IPHC, SUBATECH) Tools: Quotations are ready, some will be done in our workshops (IPHC, SUBATECH) Human resources: Assembly: 2 technicians are assigned but half time each, and one in fixed-term contract is expected for early 2018. LQS: No one now but discussion in progress. To really begin it would be nice to have components for one or two DOM in October.

DOM Assembly IPHC - Strasbourg status Safia Kihel, Bari June 12-15

Human resources People involved : Christian Weber (100%) and Safia Kihel (ISR – 80 %) are going to build the DOM. Stella Suzanne-Ochsenbein (20 %) is the LQS. We are asking for one fixed-term technician contract. We don't know yet if we will get it or not. DOMs on VEOC ? We are thinking also about doing the integration of DOMs on VEOC. For the moment, there are only discussions, no decision has been made yet.

Room equipped with LED light No windows - Crane (max 500 kg) – Total area ~ 200 m2 - Truck access

Materials Tools : Part of the tools are home-made at Strasbourg and Nantes. The other part is outsourced. The tools should be available on September (except for the "Suction cup", the "DOM closing table" and the "DOM transportation". It will depend on when a decision will be taken)   Equipments : We are in the process of purchasing the basic equipments (we have to deal with many administrative rules). Most of them should be available on September. Components : We are looking for the components for at least 1 or 2 DOMs . Get them before the training courses ? To get familiar with them and quality reception procedure.

Training courses Quality courses Stella and Safia should participate to the quality courses organized by Giorgos in September. DOM integration training Christian and Safia are looking for the KM3NeT DOM integration training Collaboration meeting in the beginning of October Training in middle of October ?